Tender Value
₹3.6 L
EMD Value
₹7,200
Closing Date
8 Jun 2026, 2:00 pm3d left
DG(WS)
5 S.N Banerjee Road, Kol-700104
IMPROVEMENT THE SERVICE LIFE OF BOUNDARY WALL AND GRILL FENCING WITH OTHER ALLIED RELATED WORKS AT PARNASREE BPS
2026_KMC_1025729_1
WS/PBPS/2026-27/02
Open Tender
CIVIL WORKS
30 days
Parnasree BPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹7,200
29 May 2026
29 May 2026
10 Jun 2026
29 May 2026
8 Jun 2026
29 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] i) With 1:6 cement mortar (c) 15 mm thick plaster | 802.5 | SQM | 145 | ₹1,16,362.5 |
| 2 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (b) Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.) | 802.5 | SQM | 38 | ₹30,495 |
| 3 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 2 (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary : (a) On timber or plastered surface : With super gloss (hi-gloss) - (i) One coat (white in shade) | 802.5 | SQM | 52 | ₹41,730 |
| 4 | SECTION 1. ------------BUILDING WORKS (K) PAINTING, VERNISHING ETC A. ORIGINAL WORKS 1 (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.) | 318 | SQM | 29 | ₹9,222 |
| 5 | BUILDING WORKS (K) PAINTING, VERNISHING ETC?(A) ORIGINAL WORKS.(2)(A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(b) On steel or other metal surface :With super gloss (hi-gloss) -(iv) Two coats (with any shade except white) | 318 | SQM | 79 | ₹25,122 |
| 6 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 22)Painter. Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 20 | EA | 326 | ₹6,520 |
| 7 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 1)Mason (Head). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 40 | EA | 326 | ₹13,040 |
| 8 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC.B. MISCELLANEOUS ITEMS 1 Labour for Chipping of concrete surface before taking up Plastering work. | 1,139.48 | SQM | 21 | ₹23,929.09 |
| 9 | BUILDING WORKS (K) PAINTING, VERNISHING ETC?(B)MISCELLANEOUS ITEMS.(3)Removing old paint from blistered painted surface of steel or other metal by chipping including scraping and cleaning and exposing the original surface.N.B.:(Payment against item (1, 2, 3, 4) of subhead B will be made only when done at specific direction of the Engineer- in-charge. Cost of taking out shutter etc.for this item and rehanging the same or changing glass panes cracked or broken in the operation will be deemed to be covered by the rate of this item and no seperate payment therefore shall be made.) | 318 | SQM | 47 | ₹14,946 |
| 10 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 80 | EA | 245 | ₹19,600 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
Techbid.pdf
Tender Documents • 0.48 MB
BOQ_2520342.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid