| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹1.3 L+₹9,543.97 (7.98%)Admitted-Fee/PreQual/Technical/Finance NO 163 LAKSHMI AMMAN KOIL ST NEITHAVAYAL MINJUR PONNERI | PONNERI | TIRUVALLUR | TAMIL NADU | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹1.4 L+₹19,043.85 (15.9%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | RDS AND CO L1 | V S S Enterprises L2 | AR Constructions L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand,silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering, ,and baling out water and cleaning and levelling the site etc.,complete 10 m3 | 18 | 1M3 ( One Cubic Metre ) | 132 ₹2,376 | 110 ₹1,980 Lowest | 150 ₹2,700 |
| 2.00 | Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - Rev V No. 111,112,401,900 | 18 | 1M3 ( One Cubic Metre ) | 2,000 ₹36,000 Lowest | 2,340 ₹42,120 | 2,500 ₹45,000 |
| 3.00 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 6 | 1M3 ( One Cubic Metre ) | 5,000 ₹30,000 Lowest | 6,015 ₹36,090 | 6,500 ₹39,000 |
| 4.00 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 6 | 1M3 ( One Cubic Metre ) | 8,390 ₹50,340 | 8,010 ₹48,060 Lowest | 8,500 ₹51,000 |
| 5.00 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 2 | 1M2 ( One Square Metre ) | 470 ₹937.65 Lowest | 475 ₹947.62 | 500 ₹997.5 |
Tender Value
₹1.6 L
EMD Value
₹1,550
Closing Date
15 Sept 2026, 3:00 pmClosed
Commissioner Ponneri Municipality
MUNICIPAL OFFICE PONNERI
Providing CC Road to Parathasarathy Koil Left out portion in Ponneri Municipality
2026_MAWS_698225_7
864/2024/E1
Open Tender
Civil Works
Works
15 days
MUNICIPAL OFFICE PONNERI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,550
29 Sept 2026
26 Aug 2026
15 Sept 2026
26 Aug 2026
15 Sept 2026
26 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand,silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering, ,and baling out water and cleaning and levelling the site etc.,complete 10 m3 | 18 | 1M3 ( One Cubic Metre ) | - | - |
| 2 | Providing of Granular Sub base using Grade I materials of table 400 -1 of Morth with minimum CBR 30 spreading in uniform layers with motor grader on prepared surface, mix in by palce method at OMC and compacting with Vibratory Roller to achieve the desired density including all labourcharges etc, complete as per technical specification and as directed by the departmental officers. Morth - Rev V No. 111,112,401,900 | 18 | 1M3 ( One Cubic Metre ) | - | - |
| 3 | Plain Cement Concrete 1:4:8 (one part of cement, four part of Crushed Stone Sand (M- Sand) and Eight part of coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 6 | 1M3 ( One Cubic Metre ) | - | - |
| 4 | Plain Cement Concrete 1:1.5:3 (One part of Cement, one and half part of Crushed Sand (M- Sand), three coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 6 | 1M3 ( One Cubic Metre ) | - | - |
| 5 | Providing and fixing Bitumen Pad for Expansion joint in between pavement slabs to 12mm thick and fixed as shown in the drawing including cost and conveyence of expansion joints including shalimar pad and joint sealent etc, complete as per standard specification | 2 | 1M2 ( One Square Metre ) | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_839316.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .