Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.3 CrAccepted-Finance NAGPUR MUNICIPAL CORPORATION OFFICE OF THE EXECUTIVE ENGINEER NAGPUR 440001 | NAGPUR | MAHARASHTRA | 440001 | 1 | Accepted-Finance L1 bidder | |
| 2 | 2₹19.7 Cr+₹35.4 L (1.83%)Accepted-Finance | 2 | Accepted-Finance L2 | |
| 3 | 3₹19.7 Cr+₹35.9 L (1.86%)Accepted-Finance | 3 | Accepted-Finance L3 | |
| 4 | 4₹20.4 Cr+₹1.1 Cr (5.69%)Accepted-Finance | 4 | Accepted-Finance L4 | |
| 5 | 5₹21.7 Cr+₹2.4 Cr (12.3%)Accepted-Finance MATERE HOUSE SEC NO 14 PRADHIKARAN PUNE MAHARASHTRA INDIA 412105 | PUNE | MAHARASHTRA | 412105 | 5 | Accepted-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹24.9 L
Closing Date
22 Sept 2026, 3:00 pmClosed
Chief General Manager and Regional Officer Mumbai
Regional office Maharashtra T 341 4th Floor Tower 8 Belapur Railway Station Commercial Complex Sector 11 CBD Belapur Navi Mumbai 400614 Maharashtra
Design and Construction of Thin White Topping TWT Overlay Including routine maintenance on Khed Ghat Realignment Km 48 000 to Km 51 400 and Narayangaon Bypass Km 76.300 to Km 81 200 Total Length 7 300 Km in Khed Sinnar Section of NH 60
2026_NHAI_289294_1
NHAI/RO/MUM/Pune/KS/WT/2026/35
Open Tender
Civil Works
Works
180 days
Pune
Please refer tender documents
9 documents required · 9 mandatory
₹10,000
National Highways Authority of India
₹24.9 L
NHAI RO Mumbai
16 Oct 2026
29 Aug 2026
23 Sept 2026
29 Aug 2026
22 Sept 2026
29 Aug 2026
29 Aug 2026 - 7 Sept 2026
7 Sept 2026
NATIONAL HIGHWAYS AUTHORITY OF INDIA Regional Office, Mumbai NIT No.NHAI/RO/MUM/Pune/NH-60/KS/WT/2026/35 Date: 29.08.2026
Name of Work: Design and Construction of Thin White Topping (TWT) Overly including Routine Maintenances on Khe Ghat Realignment (Km 48+000 to Km-51+400) & Narayngaon Bypass (Km-76+300 to Km 81+200) (Total length-7.300) on Khed Sinnar Section of NH-60 in the state of Maharashtra on EPC Mode.
Proforma for quoting the rates
Name of the Contractor
Sr.No. Name of component Estimated cost by NHAI, Rs (Excluding GST) percentage above or below the estimated cost % in Figures Cost offered by the bidder, Rs
1 Design and Construction of Thin White Topping (TWT) Overly including Routine Maintenances on Khe Ghat Realignment (Km 48+000 to Km-51+400) & Narayngaon Bypass (Km-76+300 to Km 81+200) (Total length-7.300) on Khed Sinnar Section of NH-60 in the state of Maharashtra on EPC Mode. 249090352
Total (Excluding GST)
1 केवल एक विकल्प का भरा जाना है. एक से अधिक विकल्प अस्वीकार कर दिया जाएगा. Only one of the options is to be filled. More than one option shall be rejected.
2 किसी भी रूप में भरी दर केवल प्रतिशत मे ही मान्य होगी. Rate filled in any form shall be considered only in %age
3 दस्तावेज़ में किसी अन्य जगह पर भरी दर पर विचार नहीं किया जाएगा. Rate filled at any other place in the document shall not be considered.
4 कोई भी शर्त स्वीकार नही की जायेगी. No condition shall be accepted.
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
01_TCS_NATRAYANGAON BYPASS.pdf
Tender Documents • 0.60 MB
02. Areeement Part-A Final.pdf
Tender Documents • 1.83 MB
04.Final Corrected Schedule H.pdf
Tender Documents • 0.37 MB
05.Final Schedule E.pdf
Tender Documents • 0.66 MB
FinancialProposal.xls
Tender Documents • 0.11 MB
NIT.pdf
Tender Documents • 0.24 MB
RFP.pdf
Tender Documents • 1.15 MB
1461.pdf
PDF • 0.13 MB
Schedules.pdf
PDF • 1.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .