| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-AOC BIR SARDALIA RESIDENCY AIR FORCE ROAD BARYAL UDHAMPUR 182101 J K | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹28.5 L+₹3.7 L (14.8%)Rejected-Finance 129 PANCH SHEEL VENUE DEEP NAGAR JALANDHAR CANTT PB | JALANDHAR | PUNJAB | 144001 | L2 | Rejected-Finance Other than lowest bidder | |
| 3 | L3₹30.2 L+₹5.4 L (21.6%)Rejected-Finance | L3 | Rejected-Finance Other than lowest bidder |
Tender Value
₹26.1 L
EMD Value
₹29,080
Closing Date
4 Sept 2023, 6:00 pmClosed
HQ CWE DHAR ROAD UDHAMPUR
HQ CWE DHAR ROAD, PIN - 900386, C/O 56 APO
SPECIAL REPAIR OF ROAD (APPROX 250 x 5.50 MTR) IN FRONT OF BNK-08 SHED No. 51 BACK SIDE OF SHED No. 47 AT 15 FAD JINDRAH UNDER GE (ARMY) DHAR ROAD UDHAMPUR
2023_MES_611396_1
8250/CWE/DR/E8
Open Tender
Civil Works - Roads
Item Rate
180 days
UDHAMPUR
Please refer tender documents
5 documents required · 5 mandatory
₹500
GE ARMY DHAR ROAD
₹29,080
Yes
9 Dec 2023
31 Jul 2023
11 Sept 2023
31 Jul 2023
4 Sept 2023
21 Aug 2023
Amount
Material and Labour for scarifying or picking gravelled, macadam or bituminous macadam surfaces in area exc 400 sqm, exc 50 mm and not exc 100 mm deep, including removing the material to a distance not exceeding 50 mtr and stacking complete all as specified and directed
Material and Labour for 150 mm thick (in two layers of 75 mm thick each) (compacted thickness) WBM with coarse aggregates (granite, trap or basalt) bottom layer of grading 2 (63 to 40 mm size) or of grading 3(50 to 20mm size), spread rolled and consolidated to gradient and camber required including forming clay paddle bunds (retaining fillets) on both edges of spread aggregates and rolled with 8 to 12 tonne power roller required complete all as specified and directed.
Material and Labour for preparing of unsurfaced water bound macadam surface by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surfaces with gunny bags or with mechincal air compressor to remove all loose dirt etc. and applying evenly a priming/tack coat with bituminous primer (paving bitumen VG-10) @ 10Kg per 10 Sqm complete all as specified and as directed.
Material and Labour for laying premix bituminous macadam laid/rolled and compacted to required gradient and camber (consolidated thickness 75 mm or less) using binder content of paving bitumen (VG-30) by 4 % weight of total mix, for repair to road edge, depression, speed breaker, pot holes with 8 to 12 tonne power roller complete all as specified and directed.
Material and Labour for applying evenly a priming/tack coat with bituminous primer (paving bitumen VG-30) @ 10 Kg per 10 Sqm on black top surface of bituminous macadam complete all as specified and as directed.
Material and Labour for Bituminious premix semi-dense asphaltic concrete 40 mm (consolidated thickness) with paver with 5.5 % binder content by weight of total mix (Paving bitumen VG-30) laid with mechanically paver and material transported in tipped (covered) rolled with vibrating roller and compacted to required camber and gradient with 8 to 12 tonne power roller complete all as specified and directed.
Demolition of cement concrete (unreinforced) in ground floor, paving not exe. 15cm thickness (below or above ground level) complete all as specified and directed.
Providing and laying at or near ground level factory made Kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement motor 1:3 including making joints with or without grooves (thickness of joints except at sharp curves shall not be more than 5mm), including making drainage opening wherever required complete all as specified and directed.
Surface dressing not exceeding 15cm deep in any type of soil for berms etc complete all as specified and directed.
Material and Labour for Moorum red bajri filling in pavings, laid in layers not exc. 15 cm thick, spread, levelled and rammed to form uniform and consolidated surfaces with and including watering complete all as specified and directed.
Material and labour for cement concrete 1:4:8 type D-2 (using 40mm graded crushed stone aggregate) as in foundation filling and mass concrete, complete all as specified and directed.
Material and labour for cement concrete 1:2:4 type B1 (using 20mm graded crushed stone aggregate) as in surface channels and drains, complete all as specified and directed.
s s construction
Sarbat Construction Co
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .