Tender ID
Tender Value
₹79.9 L
EMD Value
₹1.2 L
Closing Date
20 Mar 2026, 9:30 pmClosed
Karnataka Slum Development Board
Sri. T. Prasannakumar EE
Providing Infrastructure work External Electification works for houses constructed under PMAY- HFA 250(G-2) at karkala Town.
KSDB/2025-26/OW/WORK_INDENT434
KSDB/2025-26/OW/WORK_INDENT434
Open
Other Works
Two Tender Document System(Two Cover)
KSDB Shivamogga Division
11 documents required · 9 mandatory · 2 optional
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
Minimum financial turnover not less than two times the annual payments from this contract (Rs. 159.80 Lakhs)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. 39.95 lakhs (not less than 50% of electrical works) in any one year
Liquid assets and /or availability of credit facilities of no less than Rs. 23.97 Lakhs
Total value of electrical works executed and payments received in the last five years (2020-21 to 2024-25)
PAN, GST Certificates.
IT Returns from 2020-21 to 2024-25
Satisfactoriy completed as prime contractor at-least one such similar work (Electrical service connection) of value not less than Rs. 39.95 lakhs (50% of estimated cost of tender)
Not applicable.
Not applicable
Not applicable.
₹2,000
₹1.2 L
7 Mar 2026
7 Mar 2026
23 Mar 2026
18 Mar 2026
17 Mar 2026
Providing Infrastructure work External Electification works for houses constructed under PMAY- HFA 250(G-2) at karkala Town.
Supplying . A rated 3phase with neutral bus bar using required capacity electrolytic aluminium strips covered with heat shrinkable coloured PVC sleeve, mounted on phenolic/FRP/DMC insulator which are ...
Supplying of on load change over switches 4 poles, AC 23A Duty, 415V, 50Hz, AC Supply. (Open Execution) - 200 Amps (Electrical SR 2022-23, Item no:5.11.4/p-11) ---- With all lead
Supplying, fixing and wiring earth leakage relay with core balanced current transformer suitable for single phase 50 Hz AC with latest microcontroller based, digital readout of percentage leakage curr...
Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capa...
Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capa...
Supplying and fixing of LED type panel board indicating lamp with required colour suitable for 230/440VAC. 50 Hz 12/24V D.C. (Electrical SR 2022-23, Item no:5.38/p-4) ---- With all lead
Supplying, fixing and wiring 3 Phase Digital Ammeter / Voltmeter Electrical Sr 2022-23, Item no 5.29 ---- With all lead
Supplying & fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capa...
Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers.-16 Amps (Electrical SR 2022-23, Item no:5.7.1/p-10) ---- With all lead
Supplying & fixing of Porcelain fuse channel with cut out on existing wooden/panel using necessary nuts, bolts and washers.-32 Amps (Electrical SR 2022-23, Item no:5.7.2/p-10) ---- With all lead
Supplying of 1.1 kV, XLPE or Heat resistant PVC insulated, PVC exutruted Inner Seath Armoured LTUG Cable as per IS-1554 (Part1) or IS-7098 Part-1, Armouring strip thickness and resistivity as per IS-3...
Earth work excavation for pipeline trenches in all kinds of soils by mechanical means above 600 mm trench width as per drawing and technical specifications, including setting out, construction of shor...
Refilling available earth around trenches/pipelines, cables in layers not exceeding 20 cms in depth, compacting each deposited layer by ramming after watering with a lead upto 50 m , and lift upto 1.5...
Earthing: Supplying and fixing and wiring earth electrode for groundingcircuits IC cutouts and other equipments on the meter board in the pit.The pits should be filled up with equal proportion of salt...
Supplying and running of GI/Copper strips for grounding connections, using necessary fixing materials as required. 40x6mm GI Strip Electrical SR 2019-20,Item No.6.3.3 ---- With all lead
Digging of Pit for providing GI Pipe type Earthing, Ordinary Soil (Electrical SR 2022-23, Item no:54.03 /p-17. Sl No. 441) ---- With all lead
Providing GI Pipe Earthing for Lightning Arrester, Transformer Neutral and Transformer Metal parts (Excluding digging of pits)(Electrical SR 2021-22, Item no:7.05 /p-17. Sl No. 441) ---- With all lead...
GI Pipe - 40 mm Dia (Electrical SR 2022-23, Item no:49.04 /p-16. Sl No. 406) ---- With all lead
Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 20A single phase Class-1 Accuracy with Temper Proof Energy Meter Electrical SR 2021-22, Item No.5.30 ---- With all lead
Open Conduit system Supplying heavy gauge PVC conduit pipe . dia . mm thick confirming to IS 2509 with suitable size bends, junction boxes, adhesive paste etc , and fixing using inverted wood plugs in...
Fabricating supplying and mounting MS box made out SWG suitable for floor /wall mounting, fully weather proof with provision for better heat dissipation, provided with hinged front cover, equipped wit...
Laying of cable in Existing Trench/GI pipe/Stone Ware/RCC Hume pipe using Wooden / Aluminum Rollers as directed by the departmental staff, LT Cable, 35 to 95 Sqmm (Electrical SR 2022-23, Item no:31.06...
02.00 105-RCC Pole-9.0 M Long 145 Kg WL-Digging of pts 1.8 mtrs depth for errection of 9 to 10 mtr Long Steel/RCC /PSC supports as per approved Drawing-Ordinary Soil-Material ---- With all lead
02.00 105-RCC Pole-9.0 M Long 145 Kg WL-Digging of pts 1.8 mtrs depth for errection of 9 to 10 mtr Long Steel/RCC /PSC supports as per approved Drawing-Ordinary Soil-Erection ---- With all lead
02.00 105-RCC Pole-9.0 M Long 145 Kg WL-Errection of RCC Poles 9 to 10 Mtr long but in a pit of 1.8 mtr depth-Ordinary Soil-Erection ---- With all lead
11 KV Horizontal cross arm with HT Single Top support clamp, bolts, nuts and washers For RCC Poles 140 KG WL GI.Fixing of V-Share / Horizontal cross arm including single top support Braces and Insulat...
11 KV Horizontal cross arm with HT Single Top support clamp, bolts, nuts and washers For RCC Poles 140 KG WL GI.Fixing of V-Share / Horizontal cross arm including single top support Braces and Insulat...
02 83 007-11 KV Pin Insulator (Both Shell and GI Pin) Polymeric ---- With all lead
302 83 320-Silicon cubber composite disk insulator/11 KV 45 KN Polymeric Insulator ---- With all lead
Guy Set with 2 no 15 strain insulator & concreting materials as pe dwrg No. BESOM/GM/CP/7/Dt:24-10-07 GI.Digging of pit for GUY Set-Hard Laterite Soil. Material ---- With all lead
Guy Set with 2 no 15 strain insulator & concreting materials as pe dwrg No. BESOM/GM/CP/7/Dt:24-10-07 GI.Digging of pit for GUY Set-Hard Laterite Soil.Erection ---- With all lead
Guy Set with 2 no 15 strain insulator & concreting materials as pe dwrg No. BESOM/GM/CP/7/Dt:24-10-07 GI.Fixing of GUY Set with break insulators making use of 7/3 15 mm (7/10 SWG) galvanised steel wir...
02 84 108-Rabbit ACSR Conductor.Stringing of conductor Rabbit ACSR binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps-Ordinary Soil.Material -...
02 84 108-Rabbit ACSR Conductor.Stringing of conductor Rabbit ACSR binding of conductor on each insulator and dead ending on strain or disc/strain insulator by means of clamps-Ordinary Soil.Erection -...
02 81 683-Spiral Earth Electrode.Providing spiral earth electrode type earthing along with pole (Without salt etc)-Ordinary Soil.Material ---- With all lead
02 81 683-Spiral Earth Electrode.Providing spiral earth electrode type earthing along with pole (Without salt etc)-Ordinary Soil.Erection ---- With all lead
02 78 811-11 KV Danger Board.Fixing Danger Board-Ordinary Soil.Material ---- With all lead
02 78 811-11 KV Danger Board.Fixing Danger Board-Ordinary Soil.Erection ---- With all lead
02 78 911-GI Barbed Wire (12 Mtrs/Kg).Fixing of Anticlimbing Device Spike Type-Ordinary Soil.Material ---- With all lead
02 78 911-GI Barbed Wire (12 Mtrs/Kg).Fixing of Anticlimbing Device Spike Type-Ordinary Soil.Erection ---- With all lead
03 12 553-GSM Modem with conneting cable for remote communicating capabilities.Material ---- With all lead
Guarding Materials Upto 40 mtrs span.Fixing guarding including fixing of necessary cross arms between HT and LT line up to a span of 40 mtrs for-Anticlimbing Device-Ordinary Soil.Material ---- With al...
Guarding Materials Upto 40 mtrs span.Fixing guarding including fixing of necessary cross arms between HT and LT line up to a span of 40 mtrs for-Anticlimbing Device-Ordinary Soil.Erection ---- With al...
Double Pole Structure Complete including 5 KG 8 SWG GI wire for STructureGrounding-For 9Mtr RCC Poles 145 Kg-WL- (With Pole-GI.Digging of Pits 1.8 Mtr depth for errection of 9 to 10 mtrs Long Steel/RC...
Double Pole Structure Complete including 5 KG 8 SWG GI wire for STructureGrounding-For 9Mtr RCC Poles 145 Kg-WL- (With Pole-GI.Digging of Pits 1.8 Mtr depth for errection of 9 to 10 mtrs Long Steel/RC...
Double Pole Structure Complete including 5 KG 8 SWG GI wire for STructureGrounding-For 9Mtr RCC Poles 145 Kg-WL- (With Pole-GI.Errectin of 2 pole structure formed out of SM rails or I-Bam of sizes 200...
Earthing Material Set.Digging of pit-For providing GI Pipe type Earthing-Ordinary Soil.Material ---- With all lead
Earthing Material Set.Digging of pit-For providing GI Pipe type Earthing-Ordinary Soil.Erection ---- With all lead
Earthing Material Set.Providing GI Pipe Earting for lightining arrestors Transformer Neutral and Transformer Metal parts (Excluding digging of pits)-Ordinary Soil.Erection ---- With all lead
02 00 105-RCC Pole-9.0 M Long 145 Kg WL.Digging of Pits 1.8 Mtr depth for errectiion of 9 to 10 Mtr Long Steel RCC/PSC Supports as per approved Drawing-Hard Laterite Soil.Material ---- With all lead
02 00 105-RCC Pole-9.0 M Long 145 Kg WL.Digging of Pits 1.8 Mtr depth for errectiion of 9 to 10 Mtr Long Steel RCC/PSC Supports as per approved Drawing-Hard Laterite Soil.Erection ---- With all lead
02 00 105-RCC Pole-9.0 M Long 145 Kg WL.Errection of RCC poles 9 to 10 Mtr Long but in a pit of 1.8 mtr depth-Ordinary Soil.Erection ---- With all lead
02 80 112-Double Pole TC sets for errection of 25/63/100 kva 4/5 Star Rated Transforers using 9 m tr RCC poles 145 Kg WL-GI.Errection of Transformer structure Upto 25/63 KVA-Ordinary Soil.Material ---...
02 80 112-Double Pole TC sets for errection of 25/63/100 kva 4/5 Star Rated Transforers using 9 m tr RCC poles 145 Kg WL-GI.Errection of Transformer structure Upto 25/63 KVA-Ordinary Soil.Erection ---...
02 83 007-11 KV Pin Insulator (Both Shell and GI Pin) Polymeric. ---- With all lead
02 83 320-Silicon rubber composite disk insulator/11 kv 45 kN Polymeric Insulator. ---- With all lead
GUY Set with 2 Nos 15 strain insulator & Concreting materials as per Drawg No BESCOM/GM/CP-7/ Dt: 24-10-07-GI.Digging of Pit for GUT SET-Hard Laterite Soil.Material ---- With all lead
GUY Set with 2 Nos 15 strain insulator & Concreting materials as per Drawg No BESCOM/GM/CP-7/ Dt: 24-10-07-GI.Digging of Pit for GUT SET-Hard Laterite Soil.Erection ---- With all lead
GUY Set with 2 Nos 15 strain insulator & Concreting materials as per Drawg No BESCOM/GM/CP-7/ Dt: 24-10-07-GI.Fixing of GUY Sets with break insulators making use of 7/3.15 mm (7/10 SWG) galvanised ste...
Earthing Material Set.Digging of Pit-For providing GI Pipe type Earthing-Ordinary Soil.Material ---- With all lead
Earthing Material Set.Digging of Pit-For providing GI Pipe type Earthing-Ordinary Soil.Erection ---- With all lead
Earthing Material Set.Poviding GI Pipe Earthing for lightning arresters Transformer Neutral and Transformer Metal parats (Excluding Digging of Pits)-Ordinary Soil.Erection ---- With all lead
02 84 108-Rabbit ACSR Conductor.Stringing of conductor Rabbit ACSR binding of conductor on ach insulator and dead ending on strain or dis/strain insulator by means of clamps-Ordinary Soil.Material ---...
02 84 108-Rabbit ACSR Conductor.Stringing of conductor Rabbit ACSR binding of conductor on ach insulator and dead ending on strain or dis/strain insulator by means of clamps-Ordinary Soil.Erection ---...
02 78 811-11 kV Danger Board.Fixing Danger Board-Ordinry Soil.Material ---- With all lead
02 78 811-11 kV Danger Board.Fixing Danger Board-Ordinry Soil.Erection ---- With all lead
02 78 911-GI Barbed wire (12 Mtrs/Kg).Fixing of Anticlimbing Device Spike Tye-Ordinary Soil.Material ---- With all lead
02 78 911-GI Barbed wire (12 Mtrs/Kg).Fixing of Anticlimbing Device Spike Tye-Ordinary Soil.Erection ---- With all lead
03 21 384-63 kVA BEE 5 Star Rated Open Bushing type Distribution Transformers-3 Phase, 11 kV/433 V-Amorphous Core with Oil.Erection of 63 kVA Transformer on Transformer structure-Ordinary Soil.Materia...
03 21 384-63 kVA BEE 5 Star Rated Open Bushing type Distribution Transformers-3 Phase, 11 kV/433 V-Amorphous Core with Oil.Erection of 63 kVA Transformer on Transformer structure-Ordinary Soil.Erectio...
Providing Chain link fencing 50 mm size of 8 guage properly stretched between rectangular poles and fixed with suitable bolts & nuts, the free ends shall be welded to the pole and block pipe at top an...
03 03 205-Lightining Arresters-9kV 5 kA Polymeric Type.Material ---- With all lead
03 03 205-Lightining Arresters-9kV 5 kA Polymeric Type.Erection ---- With all lead
03 02 011-11 Kv DOLO Cutouts.Fixing DOLO Cutouts/Horn Gap Fuses inclding fixing of cross arms and wiring -Ordinary Soil.Material ---- With all lead
03 02 011-11 Kv DOLO Cutouts.Fixing DOLO Cutouts/Horn Gap Fuses inclding fixing of cross arms and wiring -Ordinary Soil.Erection ---- With all lead
03 01 107-LT Protection Kit.Fixing of LT Protection Kit-Ordinary Soil.Material ---- With all lead
03 01 107-LT Protection Kit.Fixing of LT Protection Kit-Ordinary Soil.Erection ---- With all lead
63 KVA LT Wiring Kit Single Circuit.Wiring of One circuit of LT wiring Kit for 25/63/100 KVA DTC to the existing LT protection Kit Kit/Distribution Box via metering box-Ordinary Soil.Material ---- Wit...
63 KVA LT Wiring Kit Single Circuit.Wiring of One circuit of LT wiring Kit for 25/63/100 KVA DTC to the existing LT protection Kit Kit/Distribution Box via metering box-Ordinary Soil.Erection ---- Wit...
03 04 212-11 kV 200 Amps Single Break GOS.Fixing of GOS including wiring g (11 kv SB 200 A)-Ordinary Soil.Material ---- With all lead
03 04 212-11 kV 200 Amps Single Break GOS.Fixing of GOS including wiring g (11 kv SB 200 A)-Ordinary Soil.Erection ---- With all lead
03 36 020-LT Current Transformers CT Ratio-100/5A Class-0.5 accuracy 3.75 VA Rating type.Material ---- With all lead
03 57 511-LT Electronic Tri-Vector Meter 5A Class-0.5/1.0 Accuracy.Elecronic Trivector Meter 3 Phase, 4 wire Accuracy 0.5 CI-Ordinary Soil.Material ---- With all lead
03 57 511-LT Electronic Tri-Vector Meter 5A Class-0.5/1.0 Accuracy.Elecronic Trivector Meter 3 Phase, 4 wire Accuracy 0.5 CI-Ordinary Soil.Erection ---- With all lead
03 58 076-SMC metering box as above.LT Metering Box with CTs and necessary wiring for housing ETV Meter-Ordinary Soil.Material ---- With all lead
03 58 076-SMC metering box as above LT Metering Box with CTs and necessary wiring for housing ETV Meter-Ordinary Soil.Erection ---- With all lead
4 Pin Cross Arm with pole clamp bolt and nuts and washers for PSC Pole-GI.Fixing of 4 Pin Cross arm with insulator and Braces-Fixing-Ordinary Soil.Material ---- With all lead
4 Pin Cross Arm with pole clamp bolt and nuts and washers for PSC Pole-GI.Fixing of 4 Pin Cross arm with insulator and Braces-Fixing-Ordinary Soil.Erection ---- With all lead
02 83 003-1.1 kV Ceramic Pin Insulators (Shell only) ---- With all lead
02 83 053-1.1 kv GI Pin for 1.1 kv (Ceramic Shell Insulator ---- With all lead
02 83 158-No 8 Strain Insulators ---- With all lead
02 84 108-Rabbit ACSR Conductors.Stringing of conductors Rabbit ACSR binding of conductor on each insulator and dead ending on strain or disc/strain insulaor by means of camps-Ordinary Soil.Material -...
02 84 108-Rabbit ACSR Conductors.Stringing of conductors Rabbit ACSR binding of conductor on each insulator and dead ending on strain or disc/strain insulaor by means of camps-Ordinary Soil.Erection -...
04 46 044-GI Bracekt for Fluroscent tube ---- With all lead
04 46 039-T-% tubelight fitting complet 28 watts with tube-4 Feet. ---- With all lead
0 58 078-SMC Street Lighting Metering Box with Automatic Control Switch. Contactors with single phase 530 Amps Meter and 50/5A CT. ---- With all lead
02 87 057-Amoured L.T UG Cable-1.1 kV Class-25 Sq.mm 2 Core. ---- With all lead
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Indent No 434 kw-4 volume-1.doc
Tender Document • 0.85 MB
Indent No 434 kw4-volume -2.doc
Tender Document • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .