| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹38.3 LAccepted-AOC | L1 | Accepted-AOC Being lowest tenderer | |
| 2 | L2₹41.2 L+₹2.7 L (6.97%)Rejected-Finance 691 INDUSTRIAL AREA PHASE II CHANDIGARH 160 002 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160002 | L2 | Rejected-Finance Being not lowest tenderer | |
| 3 | L3₹49.6 L+₹11.0 L (28.6%)Rejected-Finance | L3 | Rejected-Finance Being not lowest tenderer |
Tender Value
₹45.7 L
EMD Value
₹92,000
Closing Date
13 Mar 2023, 6:00 pmClosed
CWE (AF) Tughlakabad
HQ CWE (AF) Tughlakabad New Delhi-110080
REPAIR AND MAINT OF FIRE FIGHTING AND FIRE DETECTION SYSTEM AND CONNECTED WORKS AT BRD AF CHANDIGARH UNDER GE (AF) MC CHANDIGARH
2023_MES_574207_2
CWE/TKD/CHD/TOKEN-51/2022-23
Open Tender
Electrical and Maintenance Works
Item Rate
330 days
GE (AF) MC Chandigarh
As per NIT conditions
7 documents required · 7 mandatory
₹500
GE (AF) MC Chandigarh
₹92,000
Yes
2 Apr 2023
14 Feb 2023
15 Mar 2023
14 Feb 2023
13 Mar 2023
21 Feb 2023
Amount
Periodical functional inspection of servicing of fire fighting system comprising of Auto /Manual operational check of the following fire fighting /fire hydrant systemm including related electrical control panel installed for the fire fighting system for the location MLH/ARS-1 Hanger:- (a) Centrifugal pump set of cap 90 KW make Kirloskar - 02 Nos (b) Jockey pump set of cap 11 KW make Kirloskar - 01 No (c) Electical panel - 01 No (d) Fire Hydrant with valve on both side -22 Nos (e) Sluice valve 250/200/150/100 mm - 27 Nos (f) Pressure switch - 04 Nos (g) Pressure gauge - 05 (h) Hose cabinet - 31 Nos Note:- (i) The periodical inspection shall be carried out with a periodicity of each month and the inspection shall be carried out within any of day from 1st to 10th of each month or as specified and directed by GE/Engr-in-Charge. (ii) Any minor defect noticed during functional test such as making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 250/150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc shall be included in the quoted rates of this item. (iii) Periodical serviceability /functional test for locations viz MLH/ARS-1 hanger, building shall be carried out in every month from the date of taking over of site in the presence of representative of station fire section. Record of the same shall be maintained and submitted to the Garrison Engineer/Engr-in-Charge duly signed by contractor and his engineer and rep of GE including endorsement from Station fire section. (iv) A recovery of RS 1000/ shall be made against the contractor for each of the month for non-performing of periodical serviceability functional inspection within the schedule time for any of the month (v) Any major unserviceable item related to firefighting system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable. (vi) The contractor shall submit the inspection report of each inspection within 10 days of inspection to GE.
Periodical functional inspection of servicing of firefighting system comprising of Auto /Manual operational check of the following firefighting /fire hydrant systemm including related electrical control panel installed for the firefighting system for the location Engine Division complete all as specified and as directed :- (a) Centrifugal pump set of cap 15 HP - 01 Nos (b) Centerifugal pump set 50 HP - 01 No (c) Electical panel - 01 No (d) Fire Hydrant with valve on both side -6 Nos (e) Sluice valve 150/100 mm - 2 Nos (f) Pressure gauge - 01 (g) Hose cabinet - 06 Nos Note:- (i) Any minor defect noticed during functional test (i.e.) making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc shall be deemed to be included in the quoted rates of this item. (ii) Periodical serviceability /functional test for locations viz Engineer Division shall be carried out in every month from the date of taking over of site in the presence of representative of station fire section. Record of the same shall be maintained and submitted to the Garrison Engineer/Engr-in-Charge duly signed by contractor and his engineer and rep of GE including endorsement from Station fire section. (iii) A recovery of RS 1000/ shall be made against the contractor for each of the month for non-performing of periodical serviceability functional check within the schedule time for any of the month (iv) Any major unserviceable item related to firefighting system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable. (v) The contractor shall submit the inspection report of each inspection within 10 days of inspection to GE. (vi) The periodical inspection shall be carried out with a periodicity of each month and the inspection shall be carried out within any of day from 1st to 10th of each month or as specified and directed by GE/Engr-in-Charge.
Periodical functional inspction of servicing of firefighting system comprising of Auto /Manual operational check of the following firefighting /fire hydrant systemm including related electrical control panel installed for the firefighting system for the location Lean Lift building, complete all as specified and as directed :- (a) Centrifugal pump set of cap 100 HP make Kirloskar - 01 Nos (b) Centrifugal pump set 50 HP - 01 Nos (c) Centrifugal pump set 10 KW - 01 No (d) Diesel Engine driven Pump set 38 KW - 01 No (c) Electical panel - 02 No (d) Fire Hydrant with valve on both side -22 Nos (e) Sluice valve 250/200/150/100 mm - 27 Nos (f) Pressure switch - 04 Nos (g) Pressure gauge - 05 (h) Hose cabinet - 31 Nos (j) water sprinkler - 161 Nos Note:- (i) Any minor defect noticed during functional test (i.e.) making electrical connections into the electrical control panel, filling the graphite packing seal into the gland piece of centrifugal type firefighting pump, replacement of rubber flanged gaskets of size 250/150 mm /100 mm with necessary nuts bolts and washers if required to arrest the leakages etc shall be included in the quoted rates of this item. (ii) Periodical serviceability /functional test for locations viz MLH/ARS-1 hanger, Engineer Division and Lean lift building shall be carried out in every month from the date of taking over of site in the presence of representative of station fire section. Record of the same shall be maintained and submitted to the Garrison Engineer/Engr-in-Charge duly signed by contractor and his engineer and rep of GE including endorsement from Station fire section. (iii) A recovery of RS 1000/ shall be made against the contractor for each of the month for non-performing of periodical serviceability functional check within the schedule time for any of the month (iv) Any major unserviceable item related to firefighting system shall be measured and paid for separately under the respective item of schedule if required to be replaced for making the system serviceable. (v) The contractor shall submit the inspection report of each inspection within 10 days of inspection to GE. (vi) The periodical inspection shall be carried out with a periodicity of each month and the inspection shall be carried out within any of day from 1st to 10th of each month or as specified and directed by GE/Engr-in-Charge.
Periodical functional inspction of servicing and testing of fire detection /alarm system fully automatic addressable type installed at various location /bldgs. i.e. MLH Hanger and Avionic Lab. (RSD-L Bldg.) by periodical cleaning of flame detectors, Beam detectors, Triple IR detectors by using clean solvent of the standard recommended /specified by the OEM and checking wiring connections from each of the detector to repeater panel and control panel for checking its healthiness during each month from the date of handing over of site complete all as specified and as directed. Details of the eqpts installed are as under :- (a) Fire (Heat/Smoke/Flame/Beam detecter) detectors - 350 Nos (b) Main control panel- 01 No (c) Manual call point - 34 Nos (d) Emergency Hooter - 01 No (e) Response indicator - 30 (f) Fault isolator - 34 Nos Note : (i) The complete job shall be carried out by the authorised vender nominated by OEM. (ii) The scope of work is inclusive of cleaning of flame detector, checking of wiring connections, identifying the faulty fire/flame detector of any type description, rectification of fault in fire detection cum alarm control panel using any minor hardware/ spare and upgradation of software if required for the fire detection /alarm system. (iii) The flame detector of any type /description, if required to be replaced shall be measured and paid for separately. (iv) Any kind of small T&P , ladder , support, scaffolding up to the reach of detectors shall be arranged by the contractor with in the quoted item rates. No extra on account of this shall be admissible. (v) The schedule of servicing of complete fire detection /alarm system in every month from the date of handing over of the site/issue of work order is to be carried out by the contractor, failing which a sum of RS 1000/ Per month shall be admissible on account of recovery from contractor. (vi) The contractor shall visit the site before procurement action to ensure /confirm make and specification for replacement of faulty detectors /other items. (vii) The contractor shall submit the inspection report of each inspection within 10 days of inspection to GE. (viii) The periodical inspection shall be carried out with a periodicity of each month and the inspection shall be carried out within any of day from 1st to 10th of each month or as specified and directed by GE/Engr-in-Charge.
Periodical functional inspction of servicing and testing of fire detection /alarm system fully automatic addressable type installed at various location /bldgs. i.e. Site V & VII and Lean Lift Bldg. by periodical cleaning of flame detectors, Beam detectors, Triple IR detectors by using clean solvent of the standard recommended /specified by the OEM and checking wiring connections from each of the detector to repeater panel and control panel for checking its healthiness during each month from the date of handing over of site complete all as specified and as directed. Details of the eqpts installed are as under :- (a) Fire (Heat/Smoke/Flame/Beam detecter) detectors - 98 Nos (b) Main control panel- 01 Nos (c) Emergency Hooter - 01 No Note : (i) The complete job shall be carried out by the authorised vender nominated by OEM. (ii) The scope of work is inclusive of cleaning of flame detector, checking of wiring connections, identifying the faulty fire/flame detector of any type description, rectification of fault in fire detection cum alarm control panel using any minor hardware/ spare and upgradation of software if required for the fire detection /alarm system. (iii) The flame detector of any type /description, if required to be replaced shall be measured and paid for separately. (iv) Any kind of small T&P , ladder , support, scaffolding up to the reach of detectors shall be arranged by the contractor with in the quoted item rates. No extra on account of this shall be admissible. (v) The schedule of servicing of complete fire detection /alarm system in every month from the date of handing over of the site/issue of work order is to be carried out by the contractor, failing which a sum of RS 1000/ Per month shall be admissible on account of recovery from contractor. (vi) The contractor shall visit the site before procurement action to ensure /confirm make and specification for replacement of faulty detectors /other items. (vii) The contractor shall submit the inspection report of each inspection within 10 days of inspection to GE. (viii) The periodical inspection shall be carried out with a periodicity of each month and the inspection shall be carried out within any of day from 1st to 10th of each month or as specified and directed by GE/Engr-in-Charge.
Periodical functional inspection of servicing and testing of fire detection /alarm system fully automatic addressable type installed at various location /bldgs. i.e. Engine Division, by periodical cleaning of flame detectors, Beam detectors, Triple IR detectors by using clean solvent of the standard recommended /specified by the OEM and checking wiring connections from each of the detector to repeater panel and control panel for checking its healthiness during each month from the date of handing over of site complete all as specified and as directed. Details of the eqpts installed are as under :- (a) Fire (Heat/Smoke/Flame/Beam detecter) detectors - 112 Nos (b) Main control panel- 02 No (c) Manual call point - 2 Nos (d) Emergency Hooter - 02 No etc Note : (i) The complete job shall be carried out by the authorised vender nominated by OEM. (ii) The scope of work is inclusive of cleaning of flame detector, checking of wiring connections, identifying the faulty fire/flame detector of any type description, rectification of fault in fire detection cum alarm control panel using any minor hardware/ spare and upgradation of software if required for the fire detection /alarm system. (iii) The flame detector of any type /description, if required to be replaced shall be measured and paid for separately. (iv) Any kind of small T&P , ladder , support, scaffolding up to the reach of detectors shall be arranged by the contractor with in the quoted item rates. No extra on account of this shall be admissible. (v) The schedule of servicing of complete fire detection /alarm system in every month from the date of handing over of the site/issue of work order is to be carried out by the contractor, failing which a sum of RS 5000/ Per month shall be admissible on account of recovery from contractor. (vi) The contractor shall visit the site before procurement action to ensure /confirm make and specification for replacement of faulty detectors /other items. (vii) The contractor shall submit the inspection report of each inspection within 10 days of inspection to GE. (viii) The periodical inspection shall be carried out with a periodicity of each month and the inspection shall be carried out within any of day from 1st to 10th of each month or as specified and directed by GE/Engr-in-Charge.
Supply and fix in repair brass female coupler for fire hydrand of size 63 mm complete all as specified and directed.
Supply and fix in repair RRL type A hose 63 mm with brass male and female coupler 15 Mtr long conforming to IS-636 complete with male and female coupling conforming to IS-903 complete all as specified and directed.
Supply and fix in repair pressure switch as per sample complete all as specified and directed.
Supply only Branch pipe gun metal 63mm instantaneous inlet, made threaded outlet, 15mm bore nozzle short complete all as specified and directed.
Supply and fixing in replacement of cast iron sluice valve heavy duty class PN-1.6 conforming to IS 14846-2000 with flanged ends 150 mm nominal bore ISI marked complete with gun metal or stainless steel spindle and cast iron hand wheel including rubber /fiber board gasket nuts, washers etc, suitable for fire fighting pressurised pipe line including necessary excavation, returning and filling complete all as specified and directed.
Supply and fix in repair CI stainer 150 mm dia for suction line complete all as specified and directed.
Supply only sprinkler early response type as per IS 15105/TAC guideline 68 degree temperature rating complete all as specified and directed.
Supply and fix in repair fire brigade inlet connection 2 way complete all as specified and directed.
Supply and fix heavy duty MS ERW pipe of size 150 mm dia plane end duly welded and painted with one coat of red oxide as primer and two coats of synthetic enamel paint of colour post red complete all as specified and directed.
Supply only in replacement addressable manual call point re-setable type complete all as specified and directed.
Supply only in replacement of low intensity hooter (Loop powered sounder) operating on single phase 220 volts 50 HZ for warning of fire connected with central control panel installed in each zone inside the rooms complete all as specified and directed Make :Siemens/Safex/ Honeywell
Supply only in replacement Detectors Complying with and type certified to EN - 45 Addressable type smoke detector Photoelectric /Optical with base with self inbuilt intelligence as per IS: 11360 with suitable fixing arrangements complete all as specified and directed.
Supply only in replacement only optical type multisensor smoke with heat detector supply voltage 9 to 33 V DC, UL/FM/LPCB approved with junction box and base to be fixed with suitable fixing arrangement complete all as specified and directed
Supply, installation, testing and commissioning in replacement flame proof triple sensor UV/IR flame detector with rugged explosion proof and FM/ATEX/PESO approved enclosure UV range 185-260 nm, IR 3000-5000 nm quiescent current < 80 mA separate LED indication for normal and alarm air purging provision protection class IP 66. operating temp 10 Deg C to +55 Deg C, conforming to NFPA 72 E, FM standars class No 3260 and IS code 2189 IP & performance certification by ETDC, Govt of India, LPCB 1259 a/02 approved complete all as specified and directed.
Supply and fix in replacement of microprocessor based automatic fire alarm control panel including supply and fixing battery charger having battery box for 2 loop microprocessor based 2 wire fault tolerent loop , required loop network type (with loop capacity of 240 devices any combination) fire alarm/ detection control panel. The panel shall be able to work automatically switch ON/OFF respective control module whenever any alarm is triggered. The panel shall have external/inbuilt printer to log all fire or fault events complete in all respect . The Panel shall be sheet steel painted , degree of protection IP-30 . The panel shall have 20 zone with individual LED indicator, expandable to 80 LED indicators. The Panel shall have 3 serial ports complete all as spcified and directed. Make SEIMENS or compatible with the existing system Note : The total nos of DC batteries , rating and cap shall be as recommended by OEM and cost of the same is deemed to be included in the qupted rates.
Supply & fixing in replacement PVC insulated FR copper conductor 1.5 sqmm 2 core multi-strandard flexible cable drawing in existing steel conduit complete all as specified and directed
Supply & fixing in replacement XLPE insulated PVC sheathed armoured copper conductor 2. 5 sqmm 2 core on surface of wall/truss complete as per site requirement complete all as specified and directed .
M&L for removing old existing rubbish/battered/useless mixture of the binding materials such as cement/lime and fine aggregate (<4.5 mm retained on IS Sieve), loose/unsound weaken mixture of biding materials such as cement/lime and coarse Aggreagate (>4.5 mm retained on IS Sieve), fine Aggregate of any description and in any position from existing external/internal surfaces of RC components or any surface having average profoundly of 15mm (Approx height 18 to 21m from natural ground level) by hand tool that has a long metal blade with a sharp edge at tool that has a long metal blade with a sharp edge at the end chisel and hammer or used robust pneumatic chisel hand tools and removal beyond MoD land includding cutting of all edges, making square shoulders of the aperture, coarsen the smooth surfaces, curettage/remaoving of all deterioted/decated on loose surface and applying one coat mixture of two monomer unsaturated liquid haydrocarbon and gaseous hydrocarbon and polymerzed them to get the high polymer dispersion emulstion can be successfully bond to cement mortar, which improved adhesion to conrecte, offers the better durability reduce the shrinkage and increaedd the flexibilty and resistant to emulsification in damp condition modified Ensuring no porosity mpa 366/15/2021 in new/old surface. Temperatures between +5°C and +35°C resist to penetration of COz 4.600u. Water vapour permeability coeffi. 68 u o (N/mm2) 3 days 11.5 (N/mm2) @ 28 days 2.5 to 3.0 on dilapidated girders o reinforcement encased in concrete complete all as specified and directed Note- This item shall be executed by the authorised rep of manufacturer. Note for item S No 24 to 36 : Repair to be carried out in RCC water OH tank of cap 75000 - 100000 Gallons / UG sump of any capacity for arresting leakages from wall floor/roof etc. Necessary safety equipment and scafolding etc as required shall be provided by contractor and cost of all safety equipments/ scafolding is deemed to be included in the quoted rates.
M & L for Timber form work to sides and soffits of lintels, beams columns, shelves, Chajjas including overhangs etc for fair finished flat surface, complete all as specified and directed.
M&L for drilling hole in RCC using drilling machine up to a depth of 10 mm and 12 mm dia, expel dust, etc by vacuum cleaner and blowers, providing and fixing of heavy grade GI pipe nipple 12 mm dia, 50 mm long, @ 1.0 Mtr. C/C in both direction and injection cement slurry blended with using integral water proofing liquid admixture for concrete mortar and integral water proofing compound for cement based concrete and mortar Chemical Confirms to IS 2645-2003. having specific gravity 1.1-1.2 gms/cc, chloride content Nil as per IS 2645-2003 & using Acrylic polymer based bonding agent and acrylic emulsion cemetn modifier and water based concrete bonding agent chemical make of Thermax/Torchtar Ltd./Ooms Polymer Ltd.having specific gravity of 1.02 using expending power grout admixture with plasticizing and grout and plasticized expending grout admixture Chemical cementations based plasticized grout admixture cement bag through nipple and closing ends nipple epoxy putty/silica jelly after injecting the chemicals mixed with cement slurry complete all as specified and directed by engineer in charge. Note:- This item shall be executed by the authorized rep of manufacture.
M&L for applying rust remover @ 5-6 Sqm/ lb: after cleaning to remove loose rust/scales/corrosion from reinforcement bars having specific Gravity 1.2-1.22. The material to be applied to the rusted metal using brush, allow it to react for 16-24 hrs & afterwards wire brushing the surface, clean with dry cloth before application of protective coating etc complete all as specified and directedby. Make — Maxcure RR of Thermax/Chemco systemNVebac Chemicals
M & L for fixing welded MS wire mesh weighing not less than 0.75 Kg/Sq and applying using mucis protezion ferro mono primer and Anticorrosive primer uncovered steel and concrete surface chemical (Single component, cementitious corrosion inhibiting primer) of make Thermax/Torchtar Ltd./Ooms Polymer Ltd.on uncovered steel reinforcement and wire mesh having mixed density of 2.01.02.05, adhesive on bond strength- 1 N/mm touch drying time of 10-15 minutes and applying 15 mm thick cement mortar 1:4 with using integral water proofing liquid admixture for concrete mortar and integral water proofing compound for cement based concrete and mortar chemical make of Thermax/Torchtar Ltd Ooms Polymer Ltd.100/L 1.1-1.2 gm/cc, chloride content: nil as per IS 2645-2003 & using acrylic polymer base bonding agent and acrylic emulsion modifier and water based concrete bonding agent chemical STD having specific gravity of 1.02) of Thermax/Torchtar Ltd Ooms Polymer Ltd. in ratio as per recommendation of manufacture total chemical not less than 8 % by weight and providing single component polymer modifier using 5f single component thixopropic fibre reinforced polymer modified repair mortar 1:1:4 make of Thermax/Torchtar Ltd./Ooms Polymer Ltd./ to achieve compressive strength of 15 N/mm in 1 Day, 25 N/mm in 3 days adhesion bond strength of > 2 N/mm providing and all as specified and directed by Engineer-in- charge. Note: - This item shall be executed by the authorized representative of manufacture.
M & L for providing and filling epoxy putty into RCC crack after opening up RCC cracks in V-groove manner approximate 3 mm wide & 10 mm deep using mechanical cutter, properly cleaning the same to remove loose dust, dirt etc. and filling the same using Epoxy resin based putty and resin jointing and repair compound Chemical the solvent free, thixotropic Epoxy resin based putty having 100% solid contents mixed density of 1.6 g/cc, compressive strength - 50 N/mm2, pot life of 40 minutes at 27 degree c, after 8 hours drying it has to be recoated within 24 hours and finishing in line and level with existing concrete surface etc. complete all as specified and directed. Make : Thermax/Torchtar Ltd./Ooms Polymer Ltd Note:- (i) This item shall be executed by the authorized rep of manufacturer after obtaining approval of GE. (ii) The contractor submit the pruchase Vouchers before claiming the payment.
M&L for one component shear thinning fibre reinforced polymer modified , Impermeable to aggressive elements, dual shrinkage compensated, cementitious repair mortar 20mm thick with alkali resistant synthetic fibres for exceptional resistance cracking complies ASTM C 109 with flexural strength ASTM C 348 @ 7 days meeting 7N/mm2, tensile strength @ 7days(ASTM C 307)> 3 N/mm2, compressive strength of 35Mpa at 7 day and 45Mpa at 28 days, Adhesion bond strength > 2 N/mm2 ,Creep Strain Reduction - 10% at the outer or inner RC surface mixed with shear thinning fibre reinforced polymer modified repair mortar in the ratio 1:4 and mixed with styrene butydiene polymerized cement mortar modifier of AR for gauging liquid for cementitious systems.with specially adhered to BS 6319 having specific gravity of 1.025 to 1.04, minimum 43% solid contents) not less than 2% by weight of cement and as per manufactures, instructions. for sumpexternal or internal surface of RCC / slab / beam/columns/facias/floor/ any brick or stone wall surface etc. Make of Thermax/Torchtar Ltd./Ooms Polymer Ltd. webac chemicals Top surfaces of the plaster shall be finished even and smooth with using extra cement complete all as specified and as directed. Note- this item shall be executed by the authorised rep. of manufacturer.
M&L for applying hydrolysis resistant primer cement modifier, provides excellent bond to concrete, and water based lignosulphonates concrete bonding agent chemical flexible, two components acrylic modified elastomeric water proofing coating with corrosion protection and elastomeric water proofing protective membrane for positive and negativewater pressure. on RC roof/ceilings/ floor/slab/ balconies/beam/ columns/facias/any brick/Concrete/stone inner or outer wall surface etc. make of Thermax/Torchtar Ltd./Ooms Polymer Ltd. Chemical complies to ASTM D4541 ASTM C836, DIN 1.048p 5 ASTC D412 having shore hardness D Scale = 20 Non Volatile, low Temperature Feasibility Test, Tensile strengh > 0.4 Mpa, Elongation > 20% Cleaning, mixing using slow speed electric drill and application of 2 coats polymer modified using integral water proofing liquid admixture and compond based concrete and mortar Chemical conforming to IS 2645 - 2003 of Thermax/Torchtar Ltd./Ooms Polymer Ltd. as approved by Engineer-in-charge @200m1/50dg per bag of cement as per manufacturer's instructions over a coat of using hydrolysis resistant primer cement modifier, provides excellent bond to concrete, and water based lignosulphonates concrete bonding agent chemical,of Thermax/Torchtar Ltd./Ooms Polymer Ltd. having specific gravity of 1.02, not less than 8% by weight of cement of as per manufacture's instruction for internal and external surface of RC Roof / Slab/Beam/Column/Facias/any brick/Stone /Concrete surface etc. Top of the Surface shall be furnished even and smoother with extra cement including all finishing the surface of match with the existing surface complete all as specified and directed. Note- this item shall be executed by the authorised rep of manufacturer.
M&L for drilling hole chemical anchoring of reinforcement on existing columns/chajjas/Top beams/Bottom beams/Circular Column beams/Braces with Hiti HIT-HY 70 or equivalent in Thermax/Torchtar Ltd./OOMS Polymer Ltd./ STP Ltd, minimum hole depth 100 mm, steel bar 12 mm dia and drill bit dia 14 mm, complete all as specified and directed. Make: HT-V-R M12X150 OF Hilti using Polyster Resin based Anchoring material for Horizontal vertical & large Annular Applications and P Fix.chemical of Thermax/Torchtar Ltd./Ooms Polymer Ltd. Note:- This item shall be executed by the authorized rep of manufacturer
M&L for providing and applying protective and decorative coating of make Thermax/ Webac Chemicals/Chemco system having high performance water based protective coating to exposed concrete or masonry surface after proper surface preparation, cleaning of dust, dirt etc System should be application of WBP-water based acrylic polymer primer com sealer coating coverage @ 8-10 Sqm/litre/coat on prepared surface and application of two coats of at 160-180 microns DFT coverage @ 5 sqm/litre/coat @ 150 microns WFT using suitable brush or roller. The coating shall have 67% volume of solids, tensile strength (ASTM D638)>1.5 N/sqmm, Elongation (ASTM D638)>90%, Adhesive Bond strength (ASTM D4541)>1.4 N/Sqmm, 1.4 mm crack bridging properly (ASTM C 1305), water vapour permeability 1.4gm/sqm/days (ASTM D570), shall be capable of providing carbon dioxide diffusion resistance, and the depth of carbonation Nil, when tested at 24 hours by the accelerated carbonation test complete all as specified. Note- (i) The treatment shall be done by the authorised applicator as approved by the accepting officer.
External Internal plastering of a hollow Bottom, septum Surface using single component thixopropic fibre reinforced polymer modified repair mortar of Thermax/Torchtar Ltd./Ooms Polymer Ltd. Fiber reinforced cementitious and shrinkage controlled polymer modified vertical and over head cementitious Repair mortar system. Chemical the product shall be a single component thixotropic fiber reinforced polymer modified repair mortar needing only addition of water at site which can be applied by trowel, It is reinforced with specially designed bean shaped, alkali resistant synthetic fibers for exceptional resistance to cracking. It is recommended for repair situations requiring application of mortar up to 15 mm thickness 1:1:4 in one layer. The product shall achieve a compressive strength of 11 MPa in 1 day & 30 MPa in 28 days and a minimum flexural strength of 6 MPa@7 days it shall have a tensile strength of and shall have a minimum bond strength of 2 MPa. Chemical manufactured by Thermax/Torchtar Ltd./Ooms Polymer Ltd. the exposed concrete surfaces shall be protected by a system comprising of single part water based acrylic emulsion sealer cum primer coat using Styrene butadine rubber based polymer bonding agent cum cement mortar SBR and a single part aliphatic acrylate, water based top coat using. INC, It shall be breathable, resistant to carbonation, chloride, sulphates, water vapour and other liquid driven mechanisms. It shall be UV resistant and not allow water to permeate. It shall have good adhesion and compatibility with concrete. The product to be used shall be SBR Prime INC System comprising of primer & top coat manufactured by Thermax/Torchtar Ltd./Ooms Polymer Ltd. complete all as specified and directed. Note:- This item shall be executed by the authorized representative of Manufacturer
M & L for curing of the surface using CC 75 Waxed base concrete compound and water based concrete compound Chemical curing efficiency with the internationally recognized ASTM C309-90 standards including all tools and taketls complete all as specified and directed.
Note:- The contractor/bidders shall comply with the Clause No. 80 of Perticular Specification.
Schedule of Credit
PARTAP ENGINEERING WORKS
M/S W R traders
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .