| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.3 LAdmitted-Finance | -0.20% | ₹20.3 L | L1 | Admitted-Finance |
| 2 | L2₹20.3 LAdmitted-Finance | +0.00% | ₹20.3 L | L2 | Admitted-Finance |
| 3 | L2₹20.3 LAdmitted-Finance | +0.00% | ₹20.3 L | L2 | Admitted-Finance |
Updated dates
Tender Value
₹23.9 L
EMD Value
₹2.4 L
Closing Date
6 May 2026, 2:00 pmClosed
EXCEUTIVE OFFICER
EXCEUTIVE OFFICER NAGAR PALIKA PRISHAD NAWABGANJ
Construction and beautification work of park in Daramnagar under Ward Badel.
2026_DOLBU_1130243_1
2072/2073/MUKA/2025-26 DATE 24-03-2026
Open Tender
Civil Works
90 days
NAGAR PALIKA PRISHAD NAWABGANJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,133
Yes
0315104000102247 IDBI BANK
₹2.4 L
Yes
15 May 2026
27 Mar 2026
8 May 2026
27 Mar 2026
6 May 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Clearing of jungle as per pwd sor SI No-259 | |||||
| 2Earth work in excavation by mechanical means (Hydraulic excavator) I manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. As Per Annalysis | |||||
| 3Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 mtr as per Technical Specification Clause 301.5 | |||||
| 4P/L concrete in 1:5:10 cement ,f.sand&40mm gauage Stone Aggregates etc all complete D.S.R.NO-4.1.10A @ 4911.85 X 0.755=3708.44 | |||||
| 5RCC work in 1:1.5:3 cement ,c.sand&20mm stone Grite etc all complete D.S.R. NO-5.2.2A @ 10682.15*0.755=8065.00 Excluding Centering & Shuttering | |||||
| 6M-150 class brick work 1:4 cement ,c. sand mortar etc all complete | |||||
| 7RCC work in 1:1.5:3 cement ,c.sand&20mm stone Grite etc all complete D.S.R. NO-5.2.2A @ 10682.15*0.755=8065.00 Excluding Centering & Shuttering | |||||
| 8RCC work in 1:1.5:3 cement ,c.sand&20mm stone Grite etc all complete D.S.R. NO-5.2.2A @ 10682.15*0.755=8065.00 Excluding Centering & Shuttering | |||||
| 9Centering & Shuttering including Strutting, Propping etc & Removal of for foundation, futting , coloumn etc As Per D.S.R. No-5.9.1 @392.15*0.755=296/Sqm | |||||
| 10Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.1 Mild Steel And Medium Tensile steel bars. As Per Annalysis 107.10x0.735= 78.71 Say=78.00/Kg Or 7800/Qtl | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.46 MB
BOQ_2108474.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid