Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
24 Jun 2026, 12:00 pm
SPO
Knowledge City, Sector 81, Mohali
Supply, installation, testing and commissioning of Atomic Absorption Spectrometer
2026_DSTE_169320_1
PBTI/PROC/26-27/01/06_01
Open Tender
Laboratory and scientific equipment
150 days
PBTI, Mohali
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹1.5 L
PBTI, Mohali
3 Jun 2026
3 Jun 2026
24 Jun 2026
3 Jun 2026
24 Jun 2026
10 Jun 2026
9 Jun 2026
PUNJAB BIOTECHNOLOGY INCUBATOR
COMMERCIAL BID FORMAT - Atomic Absorption Spectrophotometer (AAS)
Name of the Manufacturer
Make of the Equipment
Part A - Main Equipment Qty Rate (in Rs.) GST % Amount (in Rs.)
Application: The system shall be used for the quantitative estimation of toxic trace metals, nutrients (both micro and macro) and mineral composition in fertilizers and Agri & food commodities as per national and international standards/regulatory requirements.
1 Fully automated and integrated type PC-controlled double-beam multi-element Atomic Absorption Spectrophotometer for flame and graphite furnace with absorption & emission capability with deuterium & Zeeman background correction system
2 Optics: Optical Double beam system, fully sealed against dust, fumes and vapors. Automatic wavelength and slit selection with automatic peaking
3 Monochromator: Czerny-Turner/Littrow/ Echelle design or equivalent with 250mm or better focal length with holographic diffraction grating
4 Grating: Diffraction grating with dual blazed and ruling density of 1800 lines/mm. Reciprocal Linear Dispersion (RLD) shall be 1.6 nm/mm
5 Wavelength Range: 190–900 nm or wider
6 Slits: 0.2 nm to 1.0 nm or better.
7 Atomizer: Built-in atomizer for flame & graphite furnace
8 Background Correction: Dual Background correction with AC Zeeman for Graphite furnace and deuterium for flame operation
9 Lamp Holder: Automatic Lamp Holder (At least 8 lamp turret) with computer-controlled lamp selection, alignment and Automatic energy optimization using coded lamps. Built-in power supply for minimum 2 Special lamps.
10 Accessory Adjustment: Fully computer-controlled for all major accessories including Burner heads, Autosampler, FIAS (Flow Injection Analysis System) or equivalent technique, under software control.
11 Nebulizer Tip: Tip made up of anti-corrosive material to take analysis with acids, corrosive samples including HF
12 Burner: 10cm air–acetylene burner and 5cm nitrous oxide–acetylene burner made up of titanium
13 Safety System: Safety interlocks for burner, liquid trap, pressure relief valve, Flame shield flame operation, mains power, Gas and oxidant pressure, Safety reservoir, spray chamber.
14 Gas Control: fully automative and programmable gas control and automatic changeover between Air–Acetylene and Nitrous Oxide flame.
15 Sensitivity: At least 0.9 Abs with ≤0.5% RSD from 10 to 05 second integrations for 5ppm Cu standard.
16 Coded Hollow Cathode Lamps: Single element coded hollow cathode lamps for the elements namely; Lead, cadmium, zinc, arsenic, copper, Barium, mercury, nickel, Iron, Manganese, Silver, Selenium, Chromium, Aluminum, Antimony, Sodium, Potassium, Calcium, tin and Magnesium. Special lamps used for the analysis of volatile elements like As, Hg, Se. (e.g. Boosted HCL’s Ultra Lamps, Super Lamps, Electrode Less Discharge Lamps, etc.)
17 Flame System: The flames should be supported by titanium burner which can handle high solids with excellent flame stability and low carbon built-up. The burner height should be automatically adjustable and controls should be provided to adjust the burner rotation and transverse position. Automatic flame ignition should be provided. Flame systems should be controlled by fully automatic binary flow control system. System should have the provision of all safety interlock during power failure.
18 Graphite Furnace with Autosampler: Controlled through data station software with temperature programme; ambient to 2600°C or better with minimum 10 programmes. The system should have the provision for rapid cooling of graphite furnace. Autosampler should have injection volume up to 70µl. Autosampler should have the provision to accommodate 50 or more samples.
19 Vapour/Hydride Generation: Fully automated computer-controlled Vapour/Hydride Generation system for determination of hydride forming elements at ppb level.
20 Recirculating Water Chiller: For cooling of graphite furnace and controlled through software.
21 Air Compressor: Noiseless, Oil free scroll type air compressor with air filter for moisture and dust.
22 Tuning & calibration: System should be equipped with automatic tuning & calibration
23 Operating Software Complete system and software configuration: Database version software with multitasking and capable of performing the following functions; Control the system, acquire, store, process and reproduce the data. It must be able to control all the devices from same software
24 Instrument Control; data Acquisition & processing: Factory Certified or Branded Computer System with i5 or better processor, 16 GB RAM or better and 2TB HDD, 22-23” Full HD Monitor with licensed windows compatible with equipment Software, MS office latest version with Antivirus for 3 years. System should have minimum 2 network ports. Printer - B/W - duplex - laser - Legal, A4 - 1200 dpi x 1200 dpi - up to 21 ppm – capacity with Network Card and Bluetooth facility, one external portable 2TB Hard disk drive
25 Computer for reporting: Branded Computer System with i5 or better processor, 16 GB RAM or better and 2TB HDD, 22-23” Full HD Monitor with licensed windows compatible with equipment Software, MS office latest version with Antivirus for 3 years. System should have minimum 2 network ports. Printer - B/W - duplex - laser - Legal, A4 - 1200 dpi x 1200 dpi - up to 21 ppm – capacity with Network Card and Bluetooth facility
26 On site IQ and OQ of instrument along with document.
27 Operating Manual: Soft & hard copy along with trouble shooting solutions to be provided.
28 Training Satisfactory Technical and Application training to the personnel at site immediately after its installation
29 System should be quoted with all accessories required to make it fully operational.
30 Pre Installation Requirements (PIR) Provide PIR of the system as per the format given in tender document.
Total Amount of Part A
PART B - Ancillary Items
Graphite Tube (10 Nos.)
Nitrous Oxide gas cylinder (01Nos.) with pre heater regulator; Acetylene gas cylinder, (01Nos.) with Double stage regulators; Argon Gas cylinders (01 Nos.) with Double stage regulator (Note: Cylinders & Regulators must be ISI marked)
Cylinder Trolleys, capable of carrying gas cylinders through stairs (02 Nos.)
Automatic Change Over Manifold for each gas line
Complete Gas Purification Panel with fittings & installation of all gases
Renewable In Line Gas Purification System
Renewable gas purifier cartridge, Spare Set
Gas clean filters/Traps (02 No.)
Exhaust hood and vent assembly to remove waste gas from AAS room, installation is to be done by the supplier (including civil work etc. as per site requirement, if any)
Micropipette: Single channel 1-10ml vol. with 0.01 Vol. increment (01 Nos) with tips (100 Nos.)
Total Amount of Part B
PART C - Extended Warranty Charges (After expiry of Standard Warranty of One (01) Year
1st Year Extended Warranty Charges
2nd Year Extended Warranty Charges
3rd Year Extended Warranty Charges
4th Year Extended Warranty Charges
5th Year Extended Warranty Charges
6th Year Extended Warranty Charges
Total Amount of Part C
PART D - Comprehensive Maintenance Contract (CMC) Charges (After expiry of Standard Warranty of One (01) Year
1st Year CMC Charges
2nd Year CMC Charges
3rd Year CMC Charges
4th Year CMC Charges
5th Year CMC Charges
6th Year CMC Charges
Total Amount of Part D
PART E - Optional Item
1 21 CFR Part 11 compliance of the operating software
Total FOR Amount upto Site - Part A + Part B + Part C + Part D + Part E
Total Amount in Words:
E It is mandatory to quote item wise rates for Part B, Part C & Part D, lump sum rates are not acceptable for these.
E Bidder must quote amount in the given cells, if amount against any cell is included in main component, bidder should put "Zero" value.
E Taxes must be mentioned, if it is not mentioned, the same shall be treated as included in given rates.
E This is to certify that the rates quoted above are not more than the rates charged from any Institution/Department/Organization
Signatory Name:
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
e-tender-AAS.pdf
Tender Documents • 1.11 MB
PriceBidFormatAAS.xls
Additional Documents • 0.06 MB
Download all tender documents and submit your bid