| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.5 LAccepted-Finance ALAGAGOUNDANOOR CHAMRAJPET PO METTUR TK SALEM DT | METTUR | SALEM | TAMIL NADU | ₹9.5 L | 1 | Accepted-Finance satisfied |
| 2 | 2₹10.0 LAccepted-Finance M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹10.0 L | 2 | Accepted-Finance satisfied |
| Sl No | Description | Qty | Unit | THIAGARAJAN ENGINEERING CONTRACTOR L2 | K Ezhilarasan L1 |
|---|---|---|---|---|---|
| 1.00 | Rectification of buck stay beams & supports by bringing to the original position, providing suitable locking pin and washer etc. and welding the scalloped bar, locking pin and washer and providing channels etc.charges inclusive of cost of scaffolding | 12 | No | 6,900 ₹82,800 | 6,850 ₹82,200 |
| 2.00 | Charges for fabrication of 900mm length x 600 mm width square shaped Buck stay corner cover plate using 3 mm MS sheet by cutting, bending and welding and painting with 1 coat of heat resisting Aluminium paint. | 8 | No | 3,700 ₹29,600 | 3,450 ₹27,600 |
| 3.00 | Charges for cutting and replacing of defective/ buckled end plate in the rear side of LTSH upper bank area in boiler II pass which is provided to protect the end coil erosion by cutting theM.S. plate to required size and providing stiffener plates to equal distance | 1 | Time | 42,000 ₹42,000 | 41,500 ₹41,500 |
| 4.00 | Charges for providing new M.S. plates in the middle side of boiler headers such as rear side, left side and right side headers in Boiler II pass to protect header erosion | 1 | Time | 31,000 ₹31,000 | 30,500 ₹30,500 |
| 5.00 | Petty iron work for truss, straps etc., (wrought & fixed) labour only | 1,000 | Kgs | 75 ₹75,000 | 67 ₹67,000 |
| 6.00 | Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work. | 1 | Time | 14,300 ₹14,300 | 14,000 ₹14,000 |
| 7.00 | "Rectification of broken out DVH hangersupport in CRH right steam pipe line Release the load of CRH pipeline from the failed DVH type hanger support remove the hanger support from the location." | 5 | Nos. | 14,100 ₹70,500 | 13,500 ₹67,500 |
| 8.00 | Repair the failed hanger supporting hook by welding disassemble the hanger support clean and inspect the parts, replace the defective parts if any | 5 | Nos. | 29,000 ₹1.4 L | 28,200 ₹1.4 L |
| 9.00 | Assemble the hanger supportand refit in the location | 5 | Nos. | 14,500 ₹72,500 | 14,100 ₹70,500 |
| 10.00 | load the hanger support to its specified load | 5 | Nos. | 6,100 ₹30,500 | 5,800 ₹29,000 |
Tender Value
Refer Docs
EMD Value
₹9,600
Closing Date
20 Feb 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM UNIT I Boiler pressure parts AOH 2026 Rectification of buck stay beam and supports renewal of worn out buck stay pin and allied works
2026_EB_652280_1
CE / MTPS-I / SE / M-I / BM /OT.500 / 2025-26
Open Tender
Power/Energy Projects/Products
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹9,600
Yes
26 Feb 2026
6 Feb 2026
21 Feb 2026
6 Feb 2026
20 Feb 2026
6 Feb 2026
Rectification of buck stay beams & supports by bringing to the original position, providing suitable locking pin and washer etc. and welding the scalloped bar, locking pin and washer and providing channels etc.charges inclusive of cost of scaffolding
Charges for fabrication of 900mm length x 600 mm width square shaped Buck stay corner cover plate using 3 mm MS sheet by cutting, bending and welding and painting with 1 coat of heat resisting Aluminium paint.
Charges for cutting and replacing of defective/ buckled end plate in the rear side of LTSH upper bank area in boiler II pass which is provided to protect the end coil erosion by cutting theM.S. plate to required size and providing stiffener plates to equal distance
Charges for providing new M.S. plates in the middle side of boiler headers such as rear side, left side and right side headers in Boiler II pass to protect header erosion
Petty iron work for truss, straps etc., (wrought & fixed) labour only
Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work.
"Rectification of broken out DVH hangersupport in CRH right steam pipe line Release the load of CRH pipeline from the failed DVH type hanger support remove the hanger support from the location."
Repair the failed hanger supporting hook by welding disassemble the hanger support clean and inspect the parts, replace the defective parts if any
Assemble the hanger supportand refit in the location
load the hanger support to its specified load
provision of suitable scaffolding for the above work and removing it after completion of work
charges for fabrication of funace thermal expanxion indicator and fixing
Charges for renewal of defective boiler tubes of size above 44.5mm OD inclusive of transportation, cutting of defective tubes, edge/spool preparation, welding with IBR welder and assisting for hydraulic test.
Charges for cutting, edge preparation and welding of 1” pipe line, tee elbows, bends in Boiler pressure parts by IBR welder
Cutting Gas
welding Electrode
T & Ps and consumables
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.72 MB
BOQ_782135.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid