Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance 56 ARUNACHALAM MAIN ROAD AMBAL NAGAR PORUR CHENNAI TAMIL NADU 600116 | THIRUVALLUR | TAMIL NADU | 600116 | ₹1.5 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHREE ABIRAMI ENGGINEERING WORKS L1 |
|---|---|---|---|---|
| 1.00Material Portion | ||||
| 2.00 | Supply of 420kV,800A/1250A HV OIP Bushing | 1 | No | 10,88,190 ₹10,88,190 Lowest |
| 3.00 | Supply of 245kV,800A/1250A LV OIP Bushing | 1 | No | 4,81,500 ₹4,81,500 Lowest |
| 4.00 | Supply of Neutral OIP Bushing | 1 | No | 1,25,190 ₹1,25,190 Lowest |
| 5.00 | Supply of 52kV/2000A 300BCT Solid stem type OIP Condenser Bushing | 2 | Nos | 1,82,970 ₹3,65,940 Lowest |
| 6.00 | Supply of insulation | 1 | LS | 5,10,390 ₹5,10,390 Lowest |
| 7.00 | Supply of New Transformer oil | 27,900 | Litr | 96.3 ₹26,86,770 Lowest |
| 8.00 | Gasket and Hardwares | 1 | LS | 1,92,600 ₹1,92,600 Lowest |
| 9.00Labour Portion | ||||
| 10.00 | Dismantling and loading of transformer | 1 | Unit | 1,92,600 ₹1,92,600 Lowest |
Tender Value
₹1.2 Cr
EMD Value
₹1.2 L
Closing Date
15 Jul 2022, 2:00 pmClosed
Chief Engineer/TPI
A10 Thiru vi ka Indl Estate Guindy Chennai 32
Repairing and reconditioning of 1 No. 105 MVA, 400kV, BHEL Make Auto Transformer Single phase unit with Sl.No.60066122, YOM 2004 failed at Alamathy 400 KV SS.
2022_EB_240425_1
TP1-56/2022-23
Open Tender
Electrical Works
Works
90 days
Chennai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.2 L
Yes
25 Aug 2022
8 Jul 2022
16 Jul 2022
8 Jul 2022
15 Jul 2022
8 Jul 2022
Amount
Material Portion
Supply of 420kV,800A/1250A HV OIP Bushing
Supply of 245kV,800A/1250A LV OIP Bushing
Supply of Neutral OIP Bushing
Supply of 52kV/2000A 300BCT Solid stem type OIP Condenser Bushing
Supply of insulation
Supply of New Transformer oil
Gasket and Hardwares
Labour Portion
Dismantling and loading of transformer
Insurance for transit & storage period at firm works (Rs.2 Crore Reimbursement)
Untanking of the core coil assembly and inspection jointly with customer representative Low voltage testing of the core coil assembly.Removal of top yoke core laminations. Dismantling of winding of transformer Assembling of windings with old winding cylinders and new insulation assembly Yoke filling & connections to be carried out.Processing of the core coil assembly. Carrying out all final checks prior to retanking the core coil assembly Placement of core coil assembly back inside the tank. Replacement of all gaskets and O-rings with new ones. Erection of bushings Filling new transformer oil in main tank and oil processing of transformer. Draining of oil and dismantling of transformer. Painting of Transformer (outside) Blanking, gas pressurization and making transformer.Ready for dispatch
VPD Process
Routine Testing at our works as per IS-2026
Transit insurance for transporting of 105MVA ICT from M/s SAEW to allotted site(Rs 2 crore Reimbursement
Unloading of transformer at site
Transportation charges
Charges for Transportation of transformer from site to M/s SAEW works
Charges for Transporting transformer from M/s SAEW to site
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_283601.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .