| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹18.9 L (18.2%)Admitted-Finance | ₹1.2 Cr+₹18.9 L (18.2%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | S.V ASSOCIATES L2 | Micro Leakage Care Private Limited L1 |
|---|---|---|---|---|---|
| 1.00 | Fixing of non-return valve injection packers/ nozzles at dripping leakage locations and damp patch locations @ 300 mm c/c or 150 mm c/c in case of heavy dripping using suitable drill up to the depth of 100mm or generally half of the thickness of substrate/brick wall and sealing the nozzles with polyester resin anchor grout or using rapid setting quick setting cementitious polymer modified compound, scaffolding etc complete as per specifications and as directed by EIC. Note: Scaffolding will be measured in relevant item. | 600 | Nos | 126 ₹75,600 Lowest | 150 ₹90,000 |
| 2.00 | Providing and grouting to RCC slab from bottom side above false ceiling with single component Polyurethane Foam injection grout mixed at ratio of 10:1 (10 parts of Resin: 1 part accelerator) which will foam after reaction with water/ moisture, cream time <20 seconds, rise time <30 seconds, foam expansion more than 30 times, provding of pump set up for knjection grouting, scaffolding etc complete as per specifications and as directed by EIC.Note: Scaffolding will be measured in relevant item. | 500 | Kg | 2,070 ₹10,35,000 | 1,100 ₹5,50,000 Lowest |
| 3.00 | Injection grouting with Cementitious material mixing with approved polymer (about 5% of cement), scaffolding etc complete as per clause of specification and as directed by EIC. Note: Scaffolding will be measured in relevant item. | 5,000 | Kg | 90 ₹4,50,000 | 70 ₹3,50,000 Lowest |
| 4.00 | Sealing the cracks and nozzles by Unscrew the removable grouting nozzle and seal gaps with polymer mortar with high strength, high build, conforming to EN 1504-3 class R4, scaffolding etc complete as per specifications and as directed by EIC. Note: Scaffolding will be measured in relevant item. | 500 | Nos | 90 ₹45,000 | 60 ₹30,000 Lowest |
| 5.00 | Sealing all visible cracks, making the cracks in V shape grooves by plaster cutting machine, Dilute Indifil binder with water in the Ratio of 1:4 and apply on the bare ready surfaces to be treated, Apply Indfofil binder and cement in the ratio of 1:1 and water to obtain paste like consistancy and fill the cracks, Apply Indofil bond coat of INDOFIL binder and cement in the ratio of 1:1, polycon based firous net (minimum 80 GSM), Apply one more coat of INDOFIL binder & cement above fibre net in 300 mm width including two finishing white flex coats etc complete as per specifications and as directed by EIC. | 1,000 | M | 225 ₹2,25,000 | 200 ₹2,00,000 Lowest |
| 6.00 | Removing of existing bitumen/ chemical based waterproofing treatment from terrace chajjas, parapets etc, and disposal within 50m etc. complete as per clause of technical specifications and as directed by Engineer-in-charge | 2,000 | SqM | 180 ₹3,60,000 | 70 ₹1,40,000 Lowest |
| 7.00 | Providing and fixing APP (Atactic Polypropylene Polymer) modified pre fabricated five layer, 3 mm thick water proofing membrane over existing expansion joints at roof terrace as per clause of specification and as directed by the Engineer-in-charge | 600 | SqM | 630 ₹3,78,000 | 400 ₹2,40,000 Lowest |
| 8.00 | Painting (two coats) on bitumenious membrane surfaces with highly reflective bitumen base coating paint of approved brand and manufacture including preparation of the surfaces, scaffolding complete as per spceficiation and as directed by EIC | 2,000 | SqM | 216 ₹4,32,000 | 60 ₹1,20,000 Lowest |
| 9.00 | Provding and applying damap proof/ roof seal waterproofing coatitng in two coats of approved brand and manufacturer including preparation of the surfaces, scaffolding complete as per spceficiation and as directed by EIC.Note: Scaffolding will be measured in relevant item. | 500 | SqM | 450 ₹2,25,000 | 420 ₹2,10,000 Lowest |
| 10.00 | DISMANTLING OLD PLASTER OR SKIRTING carefully, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50M lead, scaffolding upto 13 metres height complete. all as as per specifications and as directed at site. Note: Scaffolding will be measured in relevant item. | 100 | SqM | 90 ₹9,000 Lowest | 125 ₹12,500 |
Tender Value
₹1.4 Cr
EMD Value
₹3.4 L
Closing Date
4 Mar 2026, 4:00 pmClosed
CE HEAD HLUD
HLUD, RLG, BARC, TROMBAY
Special repairs of RCC structures and waterproofing work at RLG, BARC, Mumbai-400085
2026_BARC_897696_1
BARC/HLUD/ET/15/2025-26
Open Tender
Civil Works
Item Rate
730 days
RLG NHCF FILTER HOUSE
AS PER NIT CRITERIA
3 documents required · 3 mandatory
₹0
₹3.4 L
HLUD CONFERENCE ROOM , RLG, BARC, TROMBAY
10 Apr 2026
11 Feb 2026
9 Mar 2026
11 Feb 2026
4 Mar 2026
11 Feb 2026
11 Feb 2026 - 20 Feb 2026
24 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Fixing of non-return valve injection packers/ nozzles at dripping leakage locations and damp patch locations @ 300 mm c/c or 150 mm c/c in case of heavy dripping using suitable drill up to the depth of 100mm or generally half of the thickness of substrate/brick wall and sealing the nozzles with polyester resin anchor grout or using rapid setting quick setting cementitious polymer modified compound, scaffolding etc complete as per specifications and as directed by EIC. Note: Scaffolding will be measured in relevant item. | 600 | Nos | 6,400 | ₹38,40,000 |
| 0_) | Providing and grouting to RCC slab from bottom side above false ceiling with single component Polyurethane Foam injection grout mixed at ratio of 10:1 (10 parts of Resin: 1 part accelerator) which will foam after reaction with water/ moisture, cream time <20 seconds, rise time <30 seconds, foam expansion more than 30 times, provding of pump set up for knjection grouting, scaffolding etc complete as per specifications and as directed by EIC.Note: Scaffolding will be measured in relevant item. | 500 | Kg | 6,400 | ₹32,00,000 |
| 0_) | Injection grouting with Cementitious material mixing with approved polymer (about 5% of cement), scaffolding etc complete as per clause of specification and as directed by EIC. Note: Scaffolding will be measured in relevant item. | 5,000 | Kg | 470 | ₹23,50,000 |
| 0_) | Sealing the cracks and nozzles by Unscrew the removable grouting nozzle and seal gaps with polymer mortar with high strength, high build, conforming to EN 1504-3 class R4, scaffolding etc complete as per specifications and as directed by EIC. Note: Scaffolding will be measured in relevant item. | 500 | Nos | 470 | ₹2,35,000 |
| 0_) | Sealing all visible cracks, making the cracks in V shape grooves by plaster cutting machine, Dilute Indifil binder with water in the Ratio of 1:4 and apply on the bare ready surfaces to be treated, Apply Indfofil binder and cement in the ratio of 1:1 and water to obtain paste like consistancy and fill the cracks, Apply Indofil bond coat of INDOFIL binder and cement in the ratio of 1:1, polycon based firous net (minimum 80 GSM), Apply one more coat of INDOFIL binder & cement above fibre net in 300 mm width including two finishing white flex coats etc complete as per specifications and as directed by EIC. | 1,000 | M | 560 | ₹5,60,000 |
| 0_) | Removing of existing bitumen/ chemical based waterproofing treatment from terrace chajjas, parapets etc, and disposal within 50m etc. complete as per clause of technical specifications and as directed by Engineer-in-charge | 2,000 | SqM | 9,530 | ₹1,90,60,000 |
| 0_) | Providing and fixing APP (Atactic Polypropylene Polymer) modified pre fabricated five layer, 3 mm thick water proofing membrane over existing expansion joints at roof terrace as per clause of specification and as directed by the Engineer-in-charge | 600 | SqM | 4,765 | ₹28,59,000 |
| 0_) | Painting (two coats) on bitumenious membrane surfaces with highly reflective bitumen base coating paint of approved brand and manufacture including preparation of the surfaces, scaffolding complete as per spceficiation and as directed by EIC | 2,000 | SqM | 2,655 | ₹53,10,000 |
| 0_) | Provding and applying damap proof/ roof seal waterproofing coatitng in two coats of approved brand and manufacturer including preparation of the surfaces, scaffolding complete as per spceficiation and as directed by EIC.Note: Scaffolding will be measured in relevant item. | 500 | SqM | 3,820 | ₹19,10,000 |
| 0_) | DISMANTLING OLD PLASTER OR SKIRTING carefully, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50M lead, scaffolding upto 13 metres height complete. all as as per specifications and as directed at site. Note: Scaffolding will be measured in relevant item. | 100 | SqM | 3,120 | ₹3,12,000 |
stage.html
html • 0.03 MB
technical_943572.pdf
techsummary_943572.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.01 MB
Tendernotice_2.pdf
PDF • 8.38 MB
BOQ_943572.xls
BOQ • 0.33 MB
TechnicalbidET15.xls
Tender Documents • 0.09 MB
UPLOADET15.rar
Additional Documents • 11.91 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .