| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC | L1 | Accepted-AOC Lowest tenderer | |
| 2 | L2₹11.6 L+₹1.3 L (12.6%)Rejected-Finance NO 4 2ND MAIN ROAD TAGORE NAGAR LAWSPET PUDUCHERRY 605 008 | PONDICHERRY | PUDUCHERRY | 605008 | L2 | Rejected-Finance Unsuccessful tenderer | |
| 3 | L3₹12.3 L+₹2.0 L (18.9%)Rejected-Finance NO 9 KAMARAJAR SALAI KARAIKAL 609 602 | KARAIKAL | PUDUCHERRY | 609602 | L3 | Rejected-Finance Unsuccessful tenderer | |
| 4 | L4₹12.5 L+₹2.2 L (21.2%)Rejected-Finance KARAIKAL MUNICIPALITY PUDUCHERRY PY | L4 | Rejected-Finance Unsuccessful tenderer |
Tender Value
₹11.4 L
EMD Value
₹22,825
Closing Date
21 Feb 2020, 3:30 pmClosed
Executive Engineer
Executive Engineer, Buildings and Roads Division PWD Karaikal
Providing and metalling and B.T to the approach road leading to the Regional Transport Office, Karaikal.
2020_PWDC3_5803_1
42-03/PW/BRK/KKL/2019-20
Open Tender
Civil Works
Item Rate
60 days
Karaikal
Please refer Tender documents.
3 documents required · 3 mandatory
₹525
As per NIT
₹22,825
26 May 2020
14 Feb 2020
21 Feb 2020
14 Feb 2020
21 Feb 2020
14 Feb 2020
Amount
Providing and laying sand gravel mix 1:1 of 150mm consolidated thickness using 0.68cum of sand & 0.62cum of gravel for 1cum finished to a soaked CBR value of minimum 20 including cost and conveyance of sand and gravel to the work site and stacking to the standard departmental gauge for premeaurement, mixing the required quantities of sand and gravel, spreading watering and consolidation the mix by power roller rolling to achive the required proctor density including the labour charges for mixing, spreading, hire and fuel charges for power roller and all other tools and plants employed etc., complete. As per clause no 401 of MOT specification.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite Crushable type such as moorum/gravel for screening and gravel for binding to fill up the interstices of coarse aggregate, watering and compacting to the required density - by mechanical means- Water bound macadam Gr-I with Gravel screening. (As per MoRTH specification, 4th Revision)
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite Crushable type such as moorum or gravel for screening and gravel for binding to fillup the interstices of coarse aggregate, watering and compacting to the required density - by mechanicall means - Water bound macadam Gr-II with moorum or gravel screening. (As per MoRTH specification, 4th Revision)
Providing and applying tack coat on the prepared surface, heating bitumen in boiler and spraying the bitumen with sprayset fitted on bitumen boiler - on granular base such as WBM and WMM surfaces not bitumen primed. Rate of application 10kg/10sqm.
Providing and laying open graded premix carpet 20mm thick on prepared surface in a single course as wearing course composed of specified size of stone aggregates premix with a bituminous binder in mini hot mix plant 6 to 10 tonne laying manually and rolling with power roller 8 to 10 tonne but excluding cost of primer/tack coat. As per clause no 509 of MOST specification.
Providing and applying premixed seal coat type `B' comprising of thin application of fine aggregate premix with bitumen binder in mini hot mix plant, carriage manually of mixed material and laying and rolling with power roller 8 to 10 tonne. As per clause no 513 of MOST specification.
Cleaning the existing W.B.M. road surface including removing of binding material and other foreign matter with wire brushes and small picks, sweeping with brooms or soft brushes and finally dusting with old gunny bags and/or compressed air to receive bituminous treatment. As per clause no 502.4.2 and 503.3.1 of MOST specification.
Providing and laying unscreened gravel boulders to a consolidated thickness of 15cm for sub base course thickness including watering and power roller rolling etc., materials to departmental gauge on road side for pre measurement. The volume of stacks calculated as per actual measurement shall be reduced by 15% for loose ness in stacking to arrive at the net quantity. the rate include labour charges for spreading hand packing to the required camber and gradient power roller rolling, tools and plants and employed diversion of traffic barricading arrangements etc.
VSK CONSTRUCTIONS
Arun Constructions
M.SENTHILRAJARAJAN
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .