Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-Finance | ₹10.4 L | L1 | Accepted-Finance Lowest Amount Quoted |
| 2 | L2₹10.6 LAccepted-Finance 44 621708 | PERAMBALUR | TAMIL NADU | 621708 | ₹10.6 L | L2 | Accepted-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | CHINNASAMY N L1 | KATHIRAVAN R L2 |
|---|---|---|---|---|---|
| 1.00 | 1.Renwel BT Road From PM Road to Kunnam G.H.S.School (Girls) Road Km 0/0 - 0/400 (R- 472)
Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp. | 244.8 | m2 | 6 ₹1,468.80 | 8 ₹1,958.40 |
| 2.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 76.5 | m3 | 140 ₹10,710 | 145 ₹11,092.50 |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 89.12 | m2 | 23 ₹2,049.76 | 25 ₹2,228 |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 32.82 | m3 | 2,509 ₹82,345.38 | 2,550 ₹83,691 |
| 5.00 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 262.5 | m2 | 86 ₹22,575 | 90 ₹23,625 |
| 6.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 262.5 | m2 | 20 ₹5,250 | 21 ₹5,512.50 |
| 7.00 | Providing and laying Tack coat over WMM surface(treated with primer) using 3Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 1,256.25 | m2 | 34 ₹42,712.50 | 35 ₹43,968.75 |
| 8.00 | Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH | 38.15 | m3 | 11,524 ₹4.4 L | 11,650 ₹4.4 L |
| 9.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 72 | m3 | 876 ₹63,072 | 900 ₹64,800 |
| 10.00 | Provision for HM including all Labour Charge ect Complete | 2 | Nos | 574 ₹1,148 | 600 ₹1,200 |
Tender Value
₹10.5 L
EMD Value
₹10,590
Closing Date
27 Feb 2026, 3:00 pmClosed
Block Development office BP
Block Development office Veppur
Renwel BT Road From PM Road to Kunnam G.H.S.School (Girls) Road Km 0/0 - 0/400 (R- 472)
2026_RDTN_666747_1
3037/2025/A6 Date 20-02-2026
Open Tender
Civil Works - Roads
90 days
Block Development office Veppur
As per Tender Documents
2 documents required · 2 mandatory
₹0
₹10,590
4 Mar 2026
26 Feb 2026
27 Feb 2026
26 Feb 2026
27 Feb 2026
26 Feb 2026
1.Renwel BT Road From PM Road to Kunnam G.H.S.School (Girls) Road Km 0/0 - 0/400 (R- 472) Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. comp.
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Tack coat over WMM surface(treated with primer) using 3Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Provision for HM including all Labour Charge ect Complete
Provision for Sign board, including all Labour Charge ect Complete
Provison for Road Marking including all Labour Charge ect Complete
Earth work excavation in hard gravelly soil with initial lead and lift as per SS20 B for Foundation in narrow trench.
Plain cement concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance to site and all labour charges etc ., complete.
Supplying and erection centering for sides and soffits inculding cost and conveyance of all materials to site and all labour charges, etc., complete. Below Sill
Above Sill
Plain cement concrete in 1:3:6 using 40mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges, etc., complete.
Plain cement concrete 1:2:4 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supply of NP3 Class RCC Pipe conforming to IS 458/2003 including cost of pipe as a finished work including all other incidental charges, testing charges including loading,unloading, transport and delivery in good condition at work site etc., complete, as directed by the Departmental Officers, as per standard specifications.
Collection and supply of Well gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Name Board Charges
Provision for Photos Charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Part.pdf
Tender Documents • 0.68 MB
BOQ_800952.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid