| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.1 LAccepted-AOC | ₹24.1 L | L1 | Accepted-AOC Addmited |
| 2 | L2₹24.2 LRejected-AOC K K M TOWER KANDHIKUPPAM POST BARGUR TALUK KRISHNAGIRI DISTRICT 635 108 | KRISHNAGIRI | TAMIL NADU | 635108 | ₹24.2 L | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | K Sundaramoorthy L1 | KKM Construction L2 |
|---|---|---|---|---|---|
| 1.001. Construction of Hard Bed Batlapalli X Road to Ampalli HO Guttur Road Code R-656 Estimate Amount : 2434000.00 | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10 mand initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 82.44 | Cum | 263.23 ₹21,700.68 | 263.97 ₹21,761.69 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm metal including cost and Conveyance of all site etc. Complete. | 101.8 | Cum | 5,435.83 ₹5.5 L | 5,450.95 ₹5.5 L |
| 4.00Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | |||||
| 5.00 | Above GL | 307.18 | Cum | 547.07 ₹1.7 L | 548.6 ₹1.7 L |
| 6.00 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 70.49 | Cum | 5,705.62 ₹4.0 L | 5,721.49 ₹4.0 L |
| 7.00 | Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER | 81.18 | Cum | 2,616.82 ₹2.1 L | 2,624.1 ₹2.1 L |
| 8.00 | Construction of Un reinforced dowl joints at expansion and construction joints only palin cement concrete pavement | 95.63 | Cum | 7,141.54 ₹6.8 L | 7,161.4 ₹6.8 L |
| 9.00 | Provision for Bitumen Pad | 1 | Cum | 1,498.83 ₹1,498.83 | 1,503 ₹1,503 |
| 10.00 | Provision For Name Board | 1 | Cum | 999.22 ₹999.22 | 1,002 ₹1,002 |
Tender Value
₹24.3 L
EMD Value
₹25,000
Closing Date
8 Jan 2026, 3:00 pmClosed
The Block Development Officer
The Block Development Officer
Krishnagiri Dt Bargur Block UGF Construction of Hard Bed at Batalapalli X Road to Ampalli At Guttur Panchayat BRG_65
2026_RDTN_639605_1
1618_2025_A5_Dt_18_12_2025
Open Tender
Civil Works - Others
180 days
The Block Development Officer
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹25,000
13 Feb 2026
6 Jan 2026
8 Jan 2026
6 Jan 2026
8 Jan 2026
6 Jan 2026
1. Construction of Hard Bed Batlapalli X Road to Ampalli HO Guttur Road Code R-656 Estimate Amount : 2434000.00
Earth work excavation and depositing on bank with in initial lead of 10 mand initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Cement concrete 1:4:8 mix using 40mm metal including cost and Conveyance of all site etc. Complete.
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Above GL
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum.
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Construction of Un reinforced dowl joints at expansion and construction joints only palin cement concrete pavement
Provision for Bitumen Pad
Provision For Name Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.46 MB
TB-24.pdf
Tender Documents • 0.65 MB
PB-24.pdf
Tender Documents • 0.60 MB
BOQ_765736.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid