Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.7 L+₹28,644.32 (20.3%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.3 L
EMD Value
₹4,580
Closing Date
7 Aug 2026, 6:00 pmClosed
Office of the Executive Engineer Sgr Core
Office of the Executive Engineer RnB Div Sgr Core
Development of Community park by way of fencing and turfing at Hamdania Colony Nowshera.
2026_PWDJK_318795_3
28 of RNB//Sgr-Core/2026-27
Open Tender
Civil Works
Percentage
20 days
Srinagar
refer nit
3 documents required · 3 mandatory
₹200
Executive Engineer RnB Div Sgr Core
₹4,580
10 Aug 2026
31 Jul 2026
8 Aug 2026
31 Jul 2026
7 Aug 2026
31 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 2.86 | 100 SQM | 1,249.1 | ₹3,572.43 |
| 2 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
2.7.1 All kinds of soil : | 130.8 | CUM | 187.3 | ₹24,498.84 |
| 3 | P/l of good earth incl. breaking of clouds, watering, compacting incl. all leads, lifts, tax, carriage involved upto the site of work | 87.2 | CUM | 850 | ₹74,120 |
| 4 | Grassing with selection no. 1 grass including watering & maintenance of the lawn for 30 days or more till the grass forms a thick lawn free from weeds & fit for mowing including supplying of good earth if needed (the good earth shall be paid separately.)
In rows 5 cm apart in either direction | 2.86 | 100 SQM | 1,798.3 | ₹5,143.14 |
| 5 | Applying priming coat:
With ready mixed red oxide Zinc Chromate primer of approved brand and manufacture on steel galvanized iron/steel works | 111.52 | SQM | 53.6 | ₹5,977.47 |
| 6 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade, one or more coats on old work. | 111.52 | SQM | 86.75 | ₹9,674.36 |
| 7 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Welded | 468 | KGs | 138.2 | ₹64,677.6 |
| 8 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:
In cement mortar | 1.36 | CUM | 1,458.25 | ₹1,983.22 |
| 9 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
All kinds of soil : | 1.06 | CUM | 592.9 | ₹628.47 |
| 10 | Providing and Laying of stone soiling (dully hand packed) including watering dressing and ramming with all carriages loading un-loading and stacking etc complete | 0.14 | CUM | 950 | ₹133 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_1052607.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .