Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.9 LAccepted-AOC | L1 | Accepted-AOC L1 tenderer | |
| 2 | L2₹18.3 L+₹46,882.58 (2.62%)Rejected-AOC NO 28 A SUNTHARA VINAYAGAR KOVIL STREET PALAYAPETTAI GANDHI NAGAR POST TIRUNELVELI 627 008 | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627008 | L2 | Rejected-AOC L2 Tenderer | |
| 3 | L3₹18.9 L+₹1.1 L (5.94%)Rejected-AOC | L3 | Rejected-AOC L3 tenderer | |
| 4 | Rejected-Technical | - | Rejected-Technical BQR commercial conditions not satisfied | |
| 5 | Rejected-Technical 3 358 A BAGAWATH SINGH ROAD PARAMAKUDI RAMANATHAPURAM 623707 | PARAMAKUDI | RAMANATHAPURAM | TAMIL NADU | 623707 | - | Rejected-Technical BQR commercial conditions not satisfied |
Tender Value
Refer Docs
EMD Value
₹22,800
Closing Date
29 Nov 2024, 2:00 pmClosed
Superintending Engineer/Generation/Tirunelveli
Superintending Engineer / Tirunelveli Generation Circle/ Anna building, Sivanthipatti Road, Maharajanagar, Tirunelveli District
Improvement works by Restoring the collapsed revetment wall on the right bank of the Periyar river near Transformer yard of the Periyar Power House from chainage 164m to 179m ( Length 15m and Height 9m) in Theni District
2024_EB_500890_1
SE/GEN/TIN/C02A/2024-25
Open Tender
Civil Works - Others
Piece-work
90 days
Periyar Lower Camp
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹22,800
Yes
3 May 2025
14 Nov 2024
30 Nov 2024
14 Nov 2024
29 Nov 2024
16 Nov 2024
Amount
Providing dewatering arrangement by using 10HP motor with specials like hose, connector etc., including cost of labour for operating pump loading, unloading, Transporting of pump, materials, lead, lift, etc., complete.
Removing of existing Sliding portion of stone masonry of revetment and Lead of 100m and Lift of 7m including cost of labour, scaffolding, T&P, head load, loading & unloading etc., complete
Ordinary Soil (SS20B) Earth Work Excavating and Depositing on bank with initial lead of 10m & Initial lift of 2m in sand, silt or Loose soil, wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth (SS20B)
Providing grip rod in hard rock using 20mm dia TMT rod in 25mm dia drilled hole with cement slurry including cost of all materials, grouting of holes by cement slurry, labour, lead, lift etc.,complete. (Excluding the cost of Steel rod)
Strutting and Shoring for protection of earth slip using steel centering and casurina poles including cost of all materials, labour, lead,lift, head load etc., complete.
Providing steel centering, shuttering for all R.C.C works with proper slope and dimension as including cost of materials, scaffolding, labour, lead, lift, T&P, etc., complete.
R.R Masonry of CM 1:5 for foundation including cost of all materials, labour, Scaffolding, T&P, lead, lift, head load etc. complete.(excluding of cost of Rough stone & Bond stone)
P.C.C 1:4:8 for foundation using 40mm HBG metal including cost of all materials, labour, lead, lift, head load curing etc., complete.
Providing steel reinforcements to all R.C.C works as per the direction of Engineer, including cost of all materials, labour for cutting, bending, placing and typing in position, lead, lift, T&P, etc., complete.
RCC 1:2:4 using 20mm HBG metal for Foundation,including cost of all materials, labour, lead, lift, scaffolding, etc., complete but excluding cost of reinforcement and centering charges etc., complete
P.C.C 1:2:4 for foundation using 20mm HBG Metal including cost of all materials, labour, lead,lift, scaffolding, head load curing etc., complete.
Supply of Gravel for Earth Filling between concrete and earth side consolidation including all cost of materials, labour, lead, lift, etc complete.
Rough stone dry packing for Flooring including sand packing, watering and cost of materials, labour, leads,etc., complete. (Excluding of Cost of Rough stone)
Pointing with cement mortar 1:3 for revetment including all cost of materials, labours, scaffolding, lead, lift, T&P, etc., complete
Providing weep holes using 50mm dia pipe for revetment including cost of all materials, labour for cutting, scaffolding, lead, lift, etc complete.
GST 18% as per Govt. Norms
Sp Constructions (BID ID -1193711)
MOHIDEEN ENTERPRISES (BID ID -1197487)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .