| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 CrAccepted-AOC UNIT 4A 4TH FLOOR MAYUR GARDEN OPP OF RAJIV BHAWAN ABC BUS STOP BHANGAGARH G S ROAD GUWAHATI KAMRUP M 781005 | KAMRUP METRO | ASSAM | 781005 | ₹6.0 Cr | L1 | Accepted-AOC AWARDED |
| 2 | L2₹6.0 CrRejected-AOC HOUSE NO 16 WARD NO 4 JORHAT ASSAM | JORHAT | ASSAM | 785001 | ₹6.0 Cr | L2 | Rejected-AOC Not Qualified for AOC |
| Sl No | Description | Qty | Unit | D KUMAR AND COMPANY L1 | M/S STAR CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000m as per Technical Specification Clause 302.3 | 35,712 | Cum | 79.1 ₹28.2 L | 79.23 ₹28.3 L |
| 2.00 | Earth work in embankment by Mechanical means by truck carriage with locally available ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding
25 cm thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 4 cm cube, dressing as per design section and compaction in layers not exceeding 30 cm in
thickness and core cutter soil test at every layer and every 500 m distance, etc. complete as directed.
A. Compaction with three wheel static roller of 80-100 kN Capacity
For initial Lead upto 1.00 km for all lifts.
L=1 KM | 80,287.5 | m3 | 311.4 ₹2.5 Cr | 311.46 ₹2.5 Cr |
| 3.00 | Supply of geo-textile Tube (Mega containers) with minimum properties as mentioned below:
* Polymer = PP of 400 GSM or above
* Tube Circumference = 10 M + 5%
* Fill Port (diameter) = 30 to 45 CM
* Tensile Strength (MD) ≥ 100 kN/m
* Tensile Strength (CD) ≥ 100 kN/m
* Elongation- MD ≤ 25%
* AOS ≤ 0.180 mm
* Permittivity ≥ 0.40 5-1
* Length = 25 M | 199 | per tube | 1,08,222 ₹2.2 Cr | 1,08,222.11 ₹2.2 Cr |
| 4.00 | Filling of geotubes (25m long and 10m circumference) with sand of volume 176 CuM by using mud pump not below the fill height of 1.60 m as per drawing and technical specification, binding the tube with 9mm nylon rope to jati bamboo pegs of length 2m placed 5m c/c along both sides of the tube to keep the tube in position during filling, as specified and directed including all loading, unloading and handling charges and local carriage upto a distance of 250M, pumping slurry using mud pump from a distance upto 250m, etc. including setting up of the tube laying platform, complete as directed | 60 | Tube | 39,784.7 ₹23.9 L | 39,784.7 ₹23.9 L |
| 5.00 | Filling of geotubes (25m long and 10m circumference) with sand of volume 176 CuM by using mud pump not below the fill height of 1.60 m as per drawing and technical specification, binding the tube with 9mm nylon rope to jati bamboo pegs of length 2m placed 5m c/c along both sides of the tube to keep the tube in position during filling, as specified and directed including all loading, unloading and handling charges and local carriage upto a distance of 250M, pumping slurry using mud pump from a distance upto 500m, etc. including setting up of the tube laying platform, complete as directed | 139 | Tube | 62,292.15 ₹86.6 L | 62,292.15 ₹86.6 L |
Tender Value
₹6.0 Cr
EMD Value
₹12.1 L
Closing Date
30 Jan 2026, 2:00 pmClosed
Chief Engineer, Water Resources Department, Assam
O/O Chief Engineer Water Resources Department, Basistha, Guwahati 29
M and R to Kopilli R/B embankment from Mantabori to Railway Bridge at Dipsing for the year 2025-26.
2026_DoWR_50465_1
MORIGAON/2025-26/M AND R/IV
Open Tender
Civil Works
120 days
Morigaon
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹12.1 L
Yes
17 Apr 2026
21 Jan 2026
30 Jan 2026
21 Jan 2026
30 Jan 2026
26 Jan 2026
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000m as per Technical Specification Clause 302.3
Earth work in embankment by Mechanical means by truck carriage with locally available ordinary/normal soil excluding sandy and rocky soil free from roots & vegetation and filling in uniform layers not exceeding 25 cm thick including ploughing or roughening or benching the seats, removing all debries, breaking clods up to 4 cm cube, dressing as per design section and compaction in layers not exceeding 30 cm in thickness and core cutter soil test at every layer and every 500 m distance, etc. complete as directed. A. Compaction with three wheel static roller of 80-100 kN Capacity For initial Lead upto 1.00 km for all lifts. L=1 KM
Supply of geo-textile Tube (Mega containers) with minimum properties as mentioned below: * Polymer = PP of 400 GSM or above * Tube Circumference = 10 M + 5% * Fill Port (diameter) = 30 to 45 CM * Tensile Strength (MD) ≥ 100 kN/m * Tensile Strength (CD) ≥ 100 kN/m * Elongation- MD ≤ 25% * AOS ≤ 0.180 mm * Permittivity ≥ 0.40 5-1 * Length = 25 M
Filling of geotubes (25m long and 10m circumference) with sand of volume 176 CuM by using mud pump not below the fill height of 1.60 m as per drawing and technical specification, binding the tube with 9mm nylon rope to jati bamboo pegs of length 2m placed 5m c/c along both sides of the tube to keep the tube in position during filling, as specified and directed including all loading, unloading and handling charges and local carriage upto a distance of 250M, pumping slurry using mud pump from a distance upto 250m, etc. including setting up of the tube laying platform, complete as directed
Filling of geotubes (25m long and 10m circumference) with sand of volume 176 CuM by using mud pump not below the fill height of 1.60 m as per drawing and technical specification, binding the tube with 9mm nylon rope to jati bamboo pegs of length 2m placed 5m c/c along both sides of the tube to keep the tube in position during filling, as specified and directed including all loading, unloading and handling charges and local carriage upto a distance of 250M, pumping slurry using mud pump from a distance upto 500m, etc. including setting up of the tube laying platform, complete as directed
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_80331.pdf
BOQ Comparative Chart
xlsx
finsummary_80331.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
mantabori_bid.pdf
Tender Documents • 0.56 MB
BOQ_80331.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid