Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.5 LAccepted-Finance | ₹25.5 L | L1 | Accepted-Finance L1 Bidder |
| 2 | L2₹26.2 LRejected-Finance | ₹26.2 L | L2 | Rejected-Finance L2 Bidder |
| 3 | L3₹27.4 LRejected-Finance 22 6 SHANTI VIHAR YAMUNA NAGAR DARPAN COLONY TATIPUR DISTRICT GWALIOR MADHYA PRADESH | GWALIOR | GWALIOR | MADHYA PRADESH | ₹27.4 L | L3 | Rejected-Finance L3 Bidder |
| 4 | L4₹33.2 LRejected-Finance | ₹33.2 L | L4 | Rejected-Finance L4 Bidder |
| 5 | Rejected-Technical | - | - | Rejected-Technical Disqualifed |
Tender Value
₹36.6 L
EMD Value
₹50,000
Closing Date
26 Mar 2026, 5:30 pmClosed
Executive Engineer PHED Ujjain
Executive Engineer PHED Ujjain
Providing Water Supply Arrangements For Panchkroshi Yatra 2026
2026_PHED_490388_1
NIT No 39/2025-26/PHED/EE/Panchcroshi Yatra Padav
Open Tender
Civil Works - Water Works
30 days
Ujjain
Please Refer Tender Document
7 documents required · 7 mandatory
₹5,000
₹50,000
21 Apr 2026
17 Mar 2026
30 Mar 2026
17 Mar 2026
26 Mar 2026
18 Mar 2026
17 Mar 2026 - 17 Mar 2026
Hire Charges of 150/100 mm diameter 3 phase submerssble motor pump set required for making water supply arrangement during Panchcroshi Yatra at Padav i/c cable ,pannel board ,Clamp etc.
Hire Charges of 3 phase Open Well motor pump set required for making water supply arrangement during Panchcroshi Yatra at Padav i/c cable ,pannel board ,Clamp etc.
Lowering & installation of 150/100 mm diameter 3 phase submerssble motor pump set in the tube well with riser pipe i/c loading/unloading of material, local transportation, arrangement of T&P, cable jointing, electric connection, labour, testing of pump etc.complete at PADAV STHAL
Taking out 150/100 mm diameter 3 phase submersible motor pump set from the tube well i/c disconnection of pipes electric connection, accessories, stacking , local carting ,unloading of material etc. i/c arrangement of T&P labour, complete at PADAV STHAL
Lowering & installation of open well submerssble motor pump set in the dug well with GI riser pipe i/c loading/unloading of material,local carting,arrangement of T&P, rope, pully cable jointing, electric connection, labour, testing of pump etc.complete at PADAV STHAL
Taken out open well submerssble motor pump set in the dug well disconnection of GI riser pipe, cable, electric connection, T&P labour, loading/unloading of material,local carting etc.complete at PADAV STHAL
Erection & installation of bathing shower at Padav Sthal at specific location with fixing grouting & fixing of A type stand connection with existing pipeline i/c loading/unloading of material,local carting, required excavation plumbering work labour etc. complete.
Erection & installation of Water Supply Stand at Padav Sthal at specific location with fixing of stand, connection with existing pipeline i/c loading/unloading of material,local carting, required excavation plumbing work labour etc. complete
Dismantling of drinking water supply stand and bathing shower from Padav Sthal from specific location after completion of yatra i/c disconnection of GI pipes, fittings excavation as per requirement loading/unloading of material, local carting, etc. complete.
Erection & installation of 5000 ltr. capacity HDPE water storage tank at Padav Sthal at specific location with fixing & grouting of MS stand i/c plumbing work for enter connection to the existing pipe line to the HDPE cistern with cost of material,labour loading/unloading of material local carting etc. complete.
Dismantling of 5000 ltr. capacity HDPE water storage tank at Padav Sthal from specific location with disconenction and dismantling from existing pipe line dismantling of MS stand i/c loading/unloading of material,local carting,requirement excavation plumbing etc. complete.
Enter connection of pipe line to R.C.C. Cisterns of 5000 ltr capacity at padav sthal i/c excavation as per requirement , arrangement of Plumber,labour, required T & P local carting and loading /unloading of material etc. complete.
Disconnection of R.C.C. Cisterns of 5000 ltr capacity from pipe line at padav sthal after completion of yatra i/c excavation as per requirement ,arrangement of Plumber,labour, required T & P local carting and loading /unloading of material etc. complete.
Laying and jointing of UPVC / GI pipe line as per requirement of site condition upto 500 mtr. Length including loading/unloading of material,local carting excavation of trench and back filling and etc. complete.
Dismantling of UPVC / GI pipe line as per requirement of site condition upto 500 mtr. Length including excavation of trench and back filling loading/unloading of material,local carting and etc. complete.
Provision for jointing of Rising main to sumpwell/OHT and OHT to Distribution pipe line with cost of material/spaicials such as bends,MTA as per requirement of site i/c cost of labour with excavation,labour as per requirement complete as per approved specification and as directed by engineer in charge.USor item no
Provision for jointing of Tubewel to Rising Main a with cost of material/spaicials such as bends,MTA as per requirement of site i/c cost of labour with excavation,labour as per requirement complete as per approved specification and as directed by engineer in charge.USor item no 14.22 p no 240
Hire Charges of Diseal Generator Set required at Padav Sthal including making all electric connections labour charges for operation of generator set as per requirement. including transportation upto site of work and back to shop after completion of work. 25 KVA
Provision for cleaning of R C C Cistern i/c arranements of T & P etc complete cost of material ,labour etc. complete.
Cleaning and disinfection of existing dug well with chlorination i/c cost of material, arrangement of T & P,labour etc complete.
Laying of one number armoured /unarmoured power cable 1.1 kV grade of size not exceeding 25 sq mm in the existing masonnry open duct as required.
Provision for labour charges for running and maitenance of water supply system for 3 days@ 5 persons per Padav in three shifts.
Provision for watchman charges for 10/15 days @ 2 persons per padav in two shifts.
Provision for Pump cum valve operator charges for 7 days @ 2 persons per padav .
Provision for leakage repairing and unexpected water supply arrangements failure.i /c excavtion of trenches,detecting the leakage,dewatering the trenches repairing the leakage i/c providing specials testing of leakage and back filling etc. complete.
Provision for temporaroy electric connections
Provision for fabrication of 1.50 mtr long water supply stand in 50 mm dia GI Pipe i/c making 4 holes and welding of 15 mmsocket i/c fabriction of tripod M.S.angle stand etc. complete.
Provision for Construction of R.C.C. Plateform for Cistern of 5000 ltr. Capacity for padav sthal and yatra marg etc. complete ( Show on as per enclosed drawing )
Provision for white wash and paint on R.C.C.Cistern of 5000 ltr. Capacity for padav sthal and yatra marg etc. complete ( Show on as per enclosed drawing )
Removing the old burn winding from stator & cleaning of slot then complete rewinding of submersible motor by using PVC conductor with material like bamboo, strip, fire proof papers, leeve, cotton tape, PVC tape including cable jointing of motor. Singal Phase 100 mm
Three Phase 100 mm & 150 mm Dia 5 H.P.(150 mm Dia)
Providing & fixing of following Ductile iron double flanged sluice valves as per IS :14846-2000 fitted with cap including jointing & testing with cost of jointing material such as bolts, nuts, rubber insertions etc. all complete. Class pn-1.0 100 mm dia
Structural steel work riveted, bolted or welded in built up section trusses and framed work i/c cutting /hoisting /fixing in position and applying a priming coat of approved steel primer all complete usor 2023 i.no. 9.22 p.no.149
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: (One or more coats) on old work usor 2023 i.no. 9.22 p.no 15.65.1
Supplying & Installation of Five star BEE rating ISI Marked required capacity of Three phase, 50 Hz, 415V, Open well Submersible pump, with Control Panel Starter with Dry Run Protection, single phase preventer, including submersible flat cable ISI marked 3 core copper wire of suitable size, SS/ Nylon wire rope, clamps etc. but excluding pipe and connection cable. 3.0 H.P. Head Mt. 15-24, Discharge LPH 615-195 usor 2023 i.no. 11.11.1
Supplying and laying of submersible flat cable ISI marked 3 core copper wire of suitable size with proper clamping of approved make. 6 sqm usor 2023 i.no. 11.5.3
Providing laying and jointing of following galvanized Iron (MS) Pipes with specials (such as bends, elbows, tees etc) class light, medium & heavy including testing of joints, cost of pipes, specials and jointing materials all complete. Pipes and sockets conforming to IS-1239/2011 Part II.50 mm dia medium class usor 2023 i.no. 3.1.6
Providing & fixing following cast iron double flanged single door reflux (non return) valves including jointing & testing with cost of jointing material such as bolts, nuts and rubber insertion all complete as per IS :5312 (Part I) 50 mm dia usor 2023 i.no. 8.65.1
Providing and placing on at all floor levels high design HDPE (polyethylene) water storage tank IS: 12701 marked with cover and suitable locking arrangement and making necessary holes for inlet, outlet and making necessary holes for inlet, outlet and overflow pipes but without fittings and the base support for tank.USOR ITem No. 9.22 ( 10 Nos x 5000 Ltr )
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_580910.pdf
techsummary_580910.pdf
finance_580910.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
Dnit.pdf
Tender Documents • 1.46 MB
BOQ_580910.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid