| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹11.8 LAWARDED | AWARDED |
Tender Value
₹14.8 L
EMD Value
₹37,500
Closing Date
21 Jun 2025, 11:00 pmClosed
Rural Development and Panchayat Raj Department
Construction of 2 rooms for Karnataka Samyukta Pre-University College (Secondary Division) by the Aided Group Vidyavardhaka Sanghadha of Hirebagevadi village, Belgaum taluk
RDPR/2025-26/BD/WORK_INDENT15722
RDPR/2025-26/BD/WORK_INDENT15722
Open
Buildings
Two Tender Document System(Two Cover)
RDPR Division Office Belagavi
₹500
₹37,500
6 Jun 2025
6 Jun 2025
23 Jun 2025
21 Jun 2025
Construction of 2 rooms for Karnataka Samyukta Pre-University College (Secondary Division) by the Aided Group Vidyavardhaka Sanghadha of Hirebagevadi village, Belgaum taluk
Earth work excavation for Foundation by mechanical means for all works & depth upto 3 m, as per drawing and technical specifications, including setting out, shoring, strutting, barricading, caution l...
Providing and Filling in foundation with granite / trap broken metal 100mm. and down size & with approved sand including hand packing, ramming, watering, including cost of all materials and labour wit...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing Coursed rubble masonry (first sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing Coursed rubble masonry (second sort) with hard stone in foundation and plinth with Cement mortar 1:6 (1 cement : 6 coarse sand)
Providing ruled pointing to cursed stone masonry with lime mortar 1:3, 20mm deep, after raking joints to depth of 20mm nicely lining, including cost all materials, labour, usage charges of machinery, ...
Providing and laying in position Cement Concrete for all Foundation works. The granite/trap/basalt crushed graded coarse aggregates andineaggregates as per relevant IS Codes machine mixed with super p...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding (Vol -1 P no:-111)(Add 3% On Rate )All other types Foundation ,sub structure of cross Drainanges.
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding Vol -1 P no:-111(Add 70% On Rate ).RCC Columns / Shaft (Slip Centering)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ra...
Providing and laying in position Cement Concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.50 m height. T...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding Vol -1 P no:-111(Add 50% On Rate ).Plinth Beams of Buildings
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding Vol -1 P no:-111(Add 70% On Rate ).RCC Columns / Shaft (Slip Centering)
Providing and laying in position Cement Concrete for all Super structures of building , Road works, Water works, Irrigation works & super structure works of bridges upto 3.50 m height. The granite/tra...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding Vol -1 P no:-111(Add 60% On Rate ).RCC Beams / Shaft (Slip Centering)
Providing and laying in positionCementConcretefor all Super structures of building , Road worksWater works, Irrigation works & super structure works of bridges upto 3.50 m height. Thegranite/trap/basa...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding Vol -1 P no:-111(Add 0% On Rate ).RCC Slab / Shaft (Slip Centering)
Providing and laying in positionCementConcretefor all Super structures of building , Road worksWater works, Irrigation works & super structure works of bridges upto 3.50 m height. Thegranite/trap/basa...
The Cost Of Steel reinforcement & Formwork To be paid Separately ) centering /Scaffolding Vol -1 P no:-111(Add 0% On Rate ).RCC Slab / Shaft (Slip Centering)
Filling approved earth (excluding rock) in trenches, plinth, sides of foundations and other similar works etc. in layers not exceeding 20cm in depth, onsolidating each deposited layer by ramming and ...
Providing Brick work with common burnt clay Non Modular bricks of class designation 3.5 in superstructure above plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) inc...
Steel Fabrication Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/we...
Providing 12 mm cement plaster with cement mortar 1:6 (1 cement:6 fine sand) including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of ma...
Providing 20 mm cement plaster of mix :1:6 (1 cement: 6 fine sand) to brick/stone masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, includi...
Providing Neat cement punning to brick masonry including rounding off corners wherever required smooth rendering, providing and removing scaffolding, including cost of materials, labour, curing comple...
Providing and laying Polished Glazed Vitrified tiles in floor with different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS:15622, of...
Flooring with 25mm thick polished tandur blue stone slabs using cement mortar 1:6, 25mm thick over existing cement concrete bed or top of roof laid to line and level and jointed with cement slurry mix...
Providing & fixing of 2-track x 2-panel sliding windows made out of multichambered UPVC (Matching to RAL-9016) sections and with minimumTiO2(Titanium Dioxide) at 6PHR with TPE(Thermo Plastic Elastomer...
Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc. including priming coat with approved steel primer all complete. Fixed to steel...
Distempering with oil bound washable distemper of approved brand and manufacture to give an even shade:New work (two coats) over and including water thinnable priming coat with cement primer after th...
Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface :Water thinnable cement primer to give an even shade after thoroughly brooming the surface to remov...
Finishing walls with water proofing cement paint of required shade :New work (Two coats applied @ 4.84 kg/10 m²) to give an even shade after thoroughly brooming the surface to remove all dirt, dust, ...
Providing Mathi/Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves (excluding cost of cement concrete a...
Providing and fixing in position fully panelled athi/Nandi wood shutters for doors with stiles and rails of 40mm. thick with bottom and lock rails
180mm wide top rail and stiles 100mm wide as per dra...
Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @ 0.80 ltr/10 m² of approved brand and manufacture i...
Painting wood work with Deluxe Multi Surface Paint of required shade. Two coat applied @ 0.90 ltr/10 m² over an under coat of primer applied @0.75 ltr/10 m² of approved brand and manufacture to give...
Providing and fixing ISI marked M.S. pressed but hinges bright finished with necessary screws etc- 125x65x2.12mm
Providing and fixing bright finished brass handles with screws etc. complete: Brass handles 100 mm with plate 150x32 mm
Providing and fixing bright finished brass tower bolts (barrel type) with necessary screws etc. complete :50x10mm
Providing and fixing bright finished brass quadrant stay 300 mm long with necessary brass screws etc. complete
Providing and laying flamed finish Granite stone flooring in required designand patterns, in linear as well as curvilinear portions of the building all
complete as per the architectural drawings with ...
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .