Er Karanjeet Singh
Executive Engineer PWD RandB Division Gandhi Nagar Jammu
Construction of RCC wall along the road near Nallah in Sector-B Extension, Sainik Colony near the H/o MS Mangi to MED Link Medicate (Under Bridge Sector, Capex Budget 2026-27)
2026_PWDJK_326755_1
Short e-NIT No. DGN/84 of 2026-27 Dated 01-10-2026
Open Tender
Civil Works
Percentage
60 days
Sector-B Extension Sainik Colony Jammu
Please refer to e-NIT/SBD
3 documents required · 3 mandatory
₹600
Executive Engineer PWD RandB Division Gandhi Nagar
₹69,980
Jammu
1 Oct 2026
1 Oct 2026
13 Oct 2026
1 Oct 2026
12 Oct 2026
1 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres. All kinds of soil. | 126 | Cum | 256.85 | ₹32,363.1 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 8.43 | Cum | 5,202.9 | ₹43,860.45 |
| 3 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and
struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 121.5 | Cum | 9,395.7 | ₹11,41,577.55 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 14,580 | Kg | 123.2 | ₹17,96,256 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases of columns etc. for mass concrete. | 1,380 | Sqm | 286.35 | ₹3,95,163 |
| 6 | Engaging labour as per requirement at site. | 14 | Nos. | 553 | ₹7,742 |
| 7 | Engaging tractor with trolley for disposal of mulba, unhygenic material away from site as per direction of Engineer-in-charge. | 5 | Trip | 700 | ₹3,500 |
| 8 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 126 | Cum | 218.4 | ₹27,518.4 |
| 9Carriage of material by Mechanical Transport including loading / unloading and stacking at site complete. | |||||
| 9.1 | Stone agg. above 40mm size for an avg. lead of 10 Kms. | 7.5 | Cum | 303.34 | ₹2,275.05 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_1105315.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .