Loading…
Loading…
Tender Value
₹18.5 L
EMD Value
₹36,980
Closing Date
20 Jun 2026, 6:00 pmClosed
Er. Sandeep Gupta
XEN
Construction of wall and drainage channel and allied works near sulabh shauchalaya at baksni nagar jammu under
2026_PWDJK_312044_2
eNIT No. 27of 2026-2027 Dated10-06-2026
Open Tender
Civil Works
Percentage
45 days
Jammu
BOQ
2 documents required · 2 mandatory
₹600
Executive Engineer PWD R and B Division
₹36,980
3 Jul 2026
10 Jun 2026
22 Jun 2026
10 Jun 2026
20 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
2.6.1 All kinds of soil : | 114.7 | cum | 592.9 | ₹68,005.63 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but
excluding the cost of centring and shuttering. All work upto plinth level with 1:4:8 | 21.24 | cum | 5,202.9 | ₹1,10,509.6 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form work for:
4.6.1 Foundations, footings, bases for columns | 390.34 | sqm | 286.35 | ₹1,11,772.43 |
| 4 | Finishing walls with acrylic smooth exterior paint of required shade onNew work (Two or more coats applied @ 1.67 liter/10sqm overand including priming coat of exterior primer applied @ 2.20kg/10sqm) ying one coat of water thinnable cement primer of approved brand and manufacture on wall surface. | 260.22 | sqm | 185.2 | ₹48,192.74 |
| 5 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:4 ( 1 cement : 4 coarse sand) | 29.74 | cum | 7,877.4 | ₹2,34,273.88 |
| 6 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 29.74 | cum | 1,455.65 | ₹43,291.03 |
| 7 | 12mm Cement plaster of mix: 1:4(1cement: 4fine sand) | 130.11 | sqm | 283.8 | ₹36,925.22 |
| 8 | 15mm cement plaster on the rough side of the single side or half brick wall of mix 1:4 | 55.76 | sqm | 327.85 | ₹18,280.92 |
| 9 | Labour engaged for shifting of old dismentled material from working site to dumping site | 60 | each | 553 | ₹33,180 |
| 10 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 | 76.47 | cum | 5,733.6 | ₹4,38,448.39 |
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.14 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.26 MB
BOQ_1010043.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .