Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹17,300
Closing Date
6 Oct 2026, 11:00 am
Sr.Superintending Engineer
Office of the Sr. Superintending Engineer, Western Electrical Circle , PWD, Purta Bhavan, 1st floor, Burdwan-713103
Annual Comprehensive Maintenance of 8.5/2.0/1.5/1 Ton capacity Ductable Split type Air Conditioner machines installed at different department of Asansol District Hospital, Asansol in the dist. of Paschim Bardhaman.
2026_WBPWD_5074664_1
WBPWD/SSEWEC /AED /NIQ-53 /2026-27
Open Tender
ELECTRICAL WORKS ORG
Item Rate
365 days
Asansol
Please refer Tender documents.
5 documents required · 5 mandatory
₹17,300
Office of the Sr. Superintending Engineer, Western
23 Sept 2026
23 Sept 2026
8 Oct 2026
23 Sept 2026
6 Oct 2026
25 Sept 2026
23 Sept 2026 - 25 Sept 2026
25 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Charges for Annual Comprehensive Maintenance of 8.5/2.0/1.5/1.0 Ton capacity Ductable Split type Air Conditioner machines installed at Asansol District Hospital, Asansol in the dist. of Paschim Bardhaman for 1 year . | |||||
| 1.01 | Ductable Split (8.5 TR) 5 Nos (5 x 12 = 60 Units) | 60 | Units | - | - |
| 1.02 | Split (2.0 Ton ) 143 Nos (143x 12 = 1716 Units) | 1,716 | Units | - | - |
| 1.03 | Split (1.5Ton ) 43 Nos (43x 12 = 516 Units) | 516 | Units | - | - |
| 1.04 | Split (1.0 Ton) 01 No (1 x 12 = 12 Units) | 12 | Units | - | - |
| 2TERMS & CONDITIONS :- 1.Objective : The guiding philosophy of this contract shall be “Public Interest”, and all activities shall be carried out accordingly. The objective of Comprehensive preventive and corrective maintenance is: To prevent fire hazards arising from RAC installations To ensure safety of occupants and the general public To minimize breakdowns and associated downtime and to ensure performance at desired efficiency. Any incident due to poor maintenance, especially fire hazards, shall be viewed seriously and the contractor shall be held fully responsible. | |||||
| 2.01 | A. Scope of Work:
The scope includes routine, preventive, corrective and Breakdown maintenance of the all Window, Split,
Concealed Split, cassette, ductable, Tower & Package type AC machines, starting from Power supply point
(Timer/Starter) to complete AC unit, within the premises, including but not limited to Supply, repair, and
replacement of all spare parts and components. | - | - | - | - |
| 2.02 | A.1. General Requirements.
1.1 Spare Parts & Components and activities Covered
The contract includes repair/replacement of:
Compressor
Blower motor / fan motor
Condenser & evaporator coils
P.C.B. and Power Supply Card, wherever applicable.
Copper tubing and piping
Capacitors (mandatory P2/S2 type, IEC 60252-1 compliant)
Relays, thermostats, contactors
Remotes
Air filters
Electrical wiring and controls related to A.C. machines
Sheet metal body parts
Nitrile Rubber Insulation of different sizes
Minor Duct repair including G.I. Sheet, Thermal and Acoustic Insulation, mason covering for
outside ducts etc.
Refrigerant gas
Drain Pump
All replaced materials must be:
New and OEM approved quality
Approved by Engineer-in-Charge (EIC) prior to installation | - | - | - | - |
| 2.03 | The agency shall:
1.2 Materials & Consumables
Provide all consumables required for maintenance, including:
Cotton waste, insulation tape, Ferrules and lugs, Lubricants &grease, cleaning agents, Soaps
etc.
Fasteners, nuts& bolts, Drain pipe fittings, Copper pipe insulation, Contact cleaner spray
Belts for AHU / ductable blowers, Refrigerant
All Logbooks and/ or Register as mentioned in this document | - | - | - | - |
| 2.04 | 1.3 Tools & Instruments
Provide and maintain calibrated tools and instruments, including:
Digital multimeter, Digital Clamp-on ammeter
Insulation resistance tester, Thermal Imaging Scanner
Pressure gauges, Infrared thermometer and Digital Psychrometers
Decibel Meter or SPL (Sound Pressure Level) Meter
Air velocity meter / anemometer
Coil cleaning chemical sprayer
Fin comb for condenser/evaporator fins
Vacuum cleaner / blower for cleaning indoor and outdoor units
High-pressure Water jet pump for condenser coil cleaning
Vacuum pump and Refrigerant charging hose set
Nitrogen cylinder with regulator for pressure testing
Brazing set with gas cylinder
Drain line flushing pump
Complete set of screwdrivers, Line Tester, Pliers & Stripper, spanners, Allen keys, adjustable
wrenches, Hackshaw & Hammer, Electric Drill machine.
Insulated ladder
Chain pulley block (for heavy equipment where required)etc | - | - | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.51 MB
new2911.pdf
Tender Documents • 0.51 MB
BOQ_5162210.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .