Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Fee/PreQual/Technical/Finance | -35.30% | ₹6.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.2 L+₹26,555.65 (3.85%)Admitted-Fee/PreQual/Technical/Finance | -32.81% | ₹7.2 L+₹26,555.65 (3.85%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.3 L+₹39,460.21 (5.72%)Admitted-Fee/PreQual/Technical/Finance | -31.60% | ₹7.3 L+₹39,460.21 (5.72%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.8 L+₹92,251.57 (13.4%)Admitted-Fee/PreQual/Technical/Finance | -26.65% | ₹7.8 L+₹92,251.57 (13.4%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹9.8 L+₹2.9 L (42.2%)Admitted-Fee/PreQual/Technical/Finance | -8.00% | ₹9.8 L+₹2.9 L (42.2%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹10.7 L
EMD Value
₹21,320
Closing Date
17 Jul 2026, 6:00 pmClosed
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON SRINAGAR MUNICIPAL CORPORATION REGAL LANE LAL CHOWK
Construction of chain link fencing around graveyard at Batapora Bala
2026_HAUDD_315033_11
SHORT Term NOTICE INVITING ETENDER No. 08 of 2026-2027 Dated 07.07.2026 RRWD SMC
Open Tender
Civil Works
Percentage
90 days
graveyard at Batapora Bala
PLEASE REFER TO TENDER
2 documents required · 2 mandatory
₹602
FA/CAO AC NO 0216010200000007
₹21,320
24 Jul 2026
8 Jul 2026
20 Jul 2026
8 Jul 2026
17 Jul 2026
8 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Engagement of Labourers for site clearance | 5 | No. | 553 | ₹2,765 |
| - | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 1 meter from cutting edge All kinds of soil | 36.81 | Cum | 479.3 | ₹17,643.03 |
| - | Supplying and laying of stone soling hand packed tightly including ramming, watering, and carriage complete | 6.07 | Cum | 850 | ₹5,159.5 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 Cement: 4 fine sand: 8 grade stone aggregate 40mm nominal size). | 4.6 | Cum | 5,202.9 | ₹23,933.34 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 62.3 | Cum | 6,591.25 | ₹4,10,634.88 |
| - | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 241.57 | Sqm | 286.35 | ₹69,173.57 |
| - | 12mm Cement plaster of mix:1 : 4 ( 1 cement : 4 fine sand) | 153.34 | Sqm | 283.8 | ₹43,517.89 |
| - | Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 1,541.7 | Kgs | 181.6 | ₹2,79,972.72 |
| - | Providing and Fixing of G.I Chainlink Fabric Fencing of required width in mesh size 50mmx50mm including strengthening with 2mm dia wire or nuts, bolts and washers as required complete as per direction of EIC | 167.28 | Sqm | 809.9 | ₹1,35,480.07 |
| - | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: two or more coats on steel work | 334.48 | Sqm | 131.85 | ₹44,101.19 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_1020651.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .