Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.9 CrAccepted-AOC GRAM AND POST MAJHARA THANA WAZIRGANJ DISTRICT GONDA UTTAR PRADESH | MAJHARA | GONDA | UTTAR PRADESH | ₹14.9 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹15.0 CrRejected-Finance MOH PADAW NAWABGANJ GONDA U P 271303 | GONDA | UTTAR PRADESH | 271303 | ₹15.0 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹15.0 CrRejected-Finance NAWABGANJ GONDA UTTAR PRADESH 271303 | GONDA | GONDA | UTTAR PRADESH | 271303 | ₹15.0 Cr | L3 | Rejected-Finance L3 |
Tender Value
₹15.0 Cr
EMD Value
₹30 L
Closing Date
18 Jan 2025, 12:00 pmClosed
SE GONDA CIRCLE PWD GONDA
SE GONDA CIRCLE PWD GONDA
Widening and Strengthening of Jhilahi Siswa Madnapur Hanumanganj Pedaran Rajgarh Road
2025_CEDPW_992482_1
4179/98Com-Gonda Circle/24-25 Dt. 11.12.24
Open Tender
Civil Works
365 days
GONDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
Yes
₹30 L
Yes
GONDA
22 Feb 2025
10 Jan 2025
18 Jan 2025
10 Jan 2025
18 Jan 2025
10 Jan 2025
10 Jan 2025
Amount
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres
Excavation for trench of roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.as per clause 301(3.1)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5m , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2
Construction of subgrade with earthen soulders with approved material obtained from borrow pits with a lift upto 1.5m , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300.2
Construction of Subgrade and earthen shoulder,s deposited from roadway (Compaction only)
Construction of granular sub-base(Grading-I) by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC and 1% OPC Cement + 3.50% Emulsion(SS2) in mechanical mix plant carriage of mixed Material by tipper to site, laying with in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying bituminous concrete(Grade-II) with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder(VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a mechanical paver , compacting with 8-10 tonnes vibratory roller, finishing and curing.
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing
Excavation for structures in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting within all lifts and lead upto 1000m
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
RCC Grade M20 using batching plant transit mixer & manual placing
M.S. Iron Steel S.N.No 50 (c)
Earth work in excavation in foundation in ordinary soil (loam clay or sand)
Concrete with 4cm. Gauge stone ballast ,fine sand of 1.25 FM & cement in proportion 8:4:1 in foundation and floors
Supply and laying dry brick ballast (OBB) under and half round of the pipe
M15 Brick work in 1:4 one cement and Three corse sand mortar including supply of all materials, labour & tool & plants etc. required for proper completion of work.
Supply & laying of 600mm dia NP3 hume pipe including fixing of collar with 1:2 cement mortar.
Supply & laying of 1000 mm dia NP3 hume pipe including fixing of collar with 1:2 cement mortar.
Struck cement pointing in 1:2 cement & fine sand motar including supply of all material, labour and T&P etc, required for proper completion of the work.
Five Year Routine Maintenance (IInd Year)
Five Year Routine Maintenance (IIIrd Year)
Five Year Routine Maintenance (IVth Year)
Five Year Routine Maintenance (Vth Year)
SHIV CONSTRUCTION (BID ID -4860224)
M/S SRI JAN CONSTRUCTION (BID ID -4862233)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid