Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC HOUSE NO 11 81 KRISHNA NAGAR KANPUR | KANPUR | UTTAR PRADESH | ₹8.4 L Quoted ₹9.9 L | L1 | Accepted-AOC AOC |
| 2 | L2₹9.9 L+₹1,992 (0.20%)Rejected-Finance | ₹9.9 L+₹1,992 (0.20%) | L2 | Rejected-Finance L2 |
Tender Value
₹10.0 L
EMD Value
₹99,588
Closing Date
7 Apr 2026, 3:00 pmClosed
C.E.
Motijheel
Improvement of boundary wall of rubish dump in ward58 Under Zone02
2026_NNKAN_1132546_1
1373/AA-2/25-26
Open Tender
Civil Works
Fixed-rate
45 days
Zone02
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹99,588
10 Jul 2026
2 Apr 2026
7 Apr 2026
2 Apr 2026
7 Apr 2026
2 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismenteling of brick including stacking of dismentled | 0.09 | cum | - | - |
| 2 | Earth work in Excavation in trenches for foundations pipes Cables etc in ordinary soil (loan clay or sand) including lift up to 1.5 mtr lead up to 50 mtr and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer-in charge with in distance of 50 mtr. | 1 | cum | - | - |
| 3 | Providing and laying Cement concrete (1:6:12,1 Cement:6 fine sand:12 Brick ballast nominal size 40mm) and curing complete, including cost of form work in foundation and floors. | 1 | sqm | - | - |
| 4 | Class-150 Brick workin (1:4) cement mortar in Foundation & Plinth including supply of all Materials Labour and Tool & Plants etc, required for proper completion of the work. | - | cum | - | - |
| 5 | RCC work with Cement concrete 1:1.5:3, 1 Cement :1.5 coarse sand:3 Stone Agregate excluding centering shurting reinforcment etc all completion of work for wall | 0.21 | cum | - | - |
| 6 | Mild Steel or Iron in Reniforcement including all complete of work | 0.53 | qtls | - | - |
| 7 | Class-150 Brick workin (1:4) cement mortar including supply of all Materials Labours and Tool and Plants etc required for proper completion of the work for super structure | 1 | cum | - | - |
| 8 | 15mm thick cement plaster in single coat with 1:4 Cement and Coarse sand etc all work | - | sqm | - | - |
| 9 | p/A wall putty of 1mm thick thick including all work. | - | sqm | - | - |
| 10 | Finishing walls with two coat of acrylic smooth exterior paint of best quality inlcuding supply of all material laobour and Tand P etc required for porper completion of the work | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.89 MB
BOQ_2113844.xls
BOQ • 0.32 MB
100stamp.pdf
Tender Documents • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .