Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹5.0 L+₹266.06 (0.05%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹5.8 L+₹77,422.50 (15.5%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹6.0 L+₹1.0 L (20.2%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹6.7 L
EMD Value
₹13,303
Closing Date
23 Sept 2026, 6:00 pmClosed
Divisional Forest Officer Social Forestry Kupwara
OFFICE OF THE ASSISTANT CONSERVATOR OF FORESTS SOIL AND WATER CONSERVATION DEPARTMENT DISTRICT KUPWARA HQ HANDWARA
Providing and Laying Crate wire protection bunds 39 Nos and Errection of DRSM Check dams 100 Cum at Rashanpora
2026_SWCD_324534_10
e-NIT No-03 of 2026-27 dated 12/09/2026
Open Tender
Civil Works
Item Rate
30 days
Rashanpora
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
Pooling Account No.0110010200001106
₹13,303
Yes
i/o Joint Director Soil and Water Cons Deptt Sgr
29 Sept 2026
14 Sept 2026
24 Sept 2026
14 Sept 2026
23 Sept 2026
14 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Execution of Soil Conservation works (as detailed below) by way of 39 No. of crate wire structures at Rashanpora | |||||
| 1.01 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: 25 meter beyond 1m from cutting edge 39x16'x5'x1.375' = 4290 Cft or 121.48 Cum | 121.48 | Cum | 576.45 | ₹70,027.15 |
| 1.02 | Hand-packing stones in wire-crates; excluding cost of crates and stones 39x16'x4'x4' =9964 Cft Deduct 15% voids = 1497.60 Cft Total: = 8486.40 Cft or 240.30 Cum | 240.3 | Cum | 361.65 | ₹86,904.5 |
| 1.03 | Carriage of stones average lead of 250 m by head load (to be paid as per actual) quantity vide item No 2 | 240.3 | Cum | 441.68 | ₹1,06,135.7 |
| 1.04 | Supply of crate wire mesh (4”x4”) 4mm, including carriage up to site of work 39x 16'x16' = 9984 Sft Lids 78 x4'x4' = 1248 Sft Total = 11232 Sft or 1043.48 Sqm | 1,043.48 | Sqm | 280 | ₹2,92,174.4 |
| 2Errection of DRSM Check dams (100 Cum) at Rashanpora | |||||
| 2.01 | Construction of DRSM check dam with fashioning of stones to be used along the exposed faces with bond stones including earth work in excavation in all kinds of soils / ordinary rock/ hard rock (as per site ) in trench with an average minimum depth of 6” throughout the length of foundation including all necessary lead and lifts , excluding cost of stones & bond stones ,its carriage up to site of work, labour component ,supervision etc, complete job.
(At Spots):-1x( 1.50m + 1.20m)/2 x 1.20m x 72.62m = 117.65 cum
D/d 15% voids = (-) 17.65 cum
T= 100 cum | 100 | No | 1,099 | ₹1,09,900 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_1094858.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .