| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹145.6 CrAdmitted-Finance BLOCK NO 758 EAGLE NEST BEHIND CHOPRA COURT ULHASNAGAR 421003 DIST THANE | 421003 | L1 | Admitted-Finance | |
| 2 | L2₹154.1 Cr+₹8.6 Cr (5.88%)Admitted-Finance 12 106 LAXMINAGAR GOPALAPATNAM GOPALAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530027 | VISAKHAPATANAM | ANDHRA PRADESH | 530027 | L2 | Admitted-Finance | |
| 3 | L3₹154.2 Cr+₹8.6 Cr (5.89%)Admitted-Finance 1148 E SYKES EXTENSION KOLHAPUR 416001 | KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416001 | L3 | Admitted-Finance | |
| 4 | L4₹154.2 Cr+₹8.6 Cr (5.89%)Admitted-Finance AHEMDABAD B WING 15TH FLOOR PRIVILON BUILDING VIKRAM NAGAR AMBALI BOPAL ROAD BEHIND ISCONTAMPLE AHEMDABAD 380058 GUJRAT INDIA | AHMADABAD | GUJARAT | 380058 | L4 | Admitted-Finance | |
| 5 | L5₹158.1 Cr+₹12.5 Cr (8.59%)Admitted-Finance 1C 1D VINDHYA TELELINKS LIMITED UDYOG VIHAR REWA MADHYA PRADESH 486006 | REWA | MADHYA PRADESH | 486006 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Laxmi Civil Engineering Services Pvt Ltd L3 | MEGHA ENGINEERING AND INFRASTRUCTURES LIMITED L2 | Backbone Construction Pvt Ltd L6 | Vindhya Telelinks limited L5 | EAGLE INFRA INDIA LTD L1 | LCC Projects Limited L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Execution of 04 nos. of Lift Irrigation Schemes with intake points on Harabhangi River & Vansadhara River (Dhuapadar ISS, Karanpadu ISS & Pradhaniguda ISS) having Command area between 500Ha. to 2000 Ha. in Cluster No. XXXV in the district of Rayagada & Gajapati including its distribution network, up to 1 Ha Chak having total planned Culturable Command Area of 4,050 Ha. on “EPC –Turn Key” basis comprising work of Detailed Survey, Planning, Design, Drawing, Estimation, Preparation of Land Acquisition Cases, Preparation of cases for forest land if any, Installation of electrical system connectivity from the Local/Identified Grid Substations, and commissioning of all the LI schemes. | 1 | Nos | 1,42,73,22,740 ₹1,42,73,22,740 | 1,42,71,64,167 ₹1,42,71,64,167 | 1,49,68,09,778 ₹1,49,68,09,778 | 1,46,22,82,175 ₹1,46,22,82,175 | 1,33,19,72,318.21 ₹1,33,19,72,318.21 Lowest | 1,42,66,62,248.68 ₹1,42,66,62,248.68 |
| 2.00 | Operation & maintenance of 4 schemes of the cluster including local substations for 15(fifteen) years or fifteen Khariff water supply seasons whichever is more, after completion as per relevant clauses of the agreement. | 1 | Nos | 11,41,85,819 ₹11,41,85,819 | 11,41,73,134 ₹11,41,73,134 Lowest | 13,01,57,373 ₹13,01,57,373 | 11,84,44,856 ₹11,84,44,856 | 12,37,35,133.39 ₹12,37,35,133.39 | 11,48,46,311.02 ₹11,48,46,311.02 |
Tender Value
₹171.3 Cr
EMD Value
₹1.7 Cr
Closing Date
31 Jul 2025, 5:00 pmClosed
CHIEF ENGINEER, MEGALIFT, BHUBANESWAR
PLOT NO. A-8/2, BHOI NAGAR, BHUBANESWAR-751022
MEGALIFT PROJECTS
2025_CEMLP_114747_1
2ML/2025-26
Open Tender
Civil Works - Lift Irrigation Schemes
Turn-key
1080 days
RAYAGADA
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
₹1.7 Cr
Yes
O/O CHIEF ENGINEER, MEGALIFT, BHUBANESWAR
9 Mar 2026
24 Jun 2025
5 Aug 2025
24 Jun 2025
31 Jul 2025
24 Jun 2025
24 Jun 2025 - 2 Jul 2025
4 Jul 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Execution of 04 nos. of Lift Irrigation Schemes with intake points on Harabhangi River & Vansadhara River (Dhuapadar ISS, Karanpadu ISS & Pradhaniguda ISS) having Command area between 500Ha. to 2000 Ha. in Cluster No. XXXV in the district of Rayagada & Gajapati including its distribution network, up to 1 Ha Chak having total planned Culturable Command Area of 4,050 Ha. on “EPC –Turn Key” basis comprising work of Detailed Survey, Planning, Design, Drawing, Estimation, Preparation of Land Acquisition Cases, Preparation of cases for forest land if any, Installation of electrical system connectivity from the Local/Identified Grid Substations, and commissioning of all the LI schemes. | 1 | Nos | - | - |
| 2 | Operation & maintenance of 4 schemes of the cluster including local substations for 15(fifteen) years or fifteen Khariff water supply seasons whichever is more, after completion as per relevant clauses of the agreement. | 1 | Nos | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 0.28 MB
Tenderdocument.pdf
Tender Documents • 2.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .