| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance 0 0 0 NEAR DAK BUNGLOW NH 1 A NH 1A UDHAMPUR UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | ₹1.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.8 Cr+₹11.1 L (6.68%)Admitted-Finance | ₹1.8 Cr+₹11.1 L (6.68%) | L2 | Admitted-Finance |
| 3 | L3₹1.8 Cr+₹15.9 L (9.62%)Admitted-Finance | ₹1.8 Cr+₹15.9 L (9.62%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SHIVAM ENTERPRISES L1 | Shiam and sons L2 | Jagad Electrical & Fabricators L3 |
|---|---|---|---|---|---|---|
| 1.00SCHEDULE Q-1 (SUPPLY) | ||||||
| 1.10 | Fabrication, Galvanising, Inspection & supply of 220KV DC tower including stubs, extensions & stub setting template, as per drawing & BOM.( 7 Nos Towers) | 107.35 | MT | 73,000 ₹78,36,550 Lowest | 75,000 ₹80,51,250 | 76,000 ₹81,58,600 |
| 1.20 | Hot dip galvanized, Hexagon, Round hexagon head transmission towers bolts, nuts & washers for above structure as per BOM. | 4.4 | MT | 1,01,000 ₹4,44,400 Lowest | 1,02,000 ₹4,48,800 | 1,07,000 ₹4,70,800 |
| 2.00TOWER ACCESSORIES | ||||||
| 2.10 | Number Plate | 7 | Nos | 200 ₹1,400 Lowest | 300 ₹2,100 | 400 ₹2,800 |
| 2.20 | Danger Plate | 7 | Nos | 200 ₹1,400 Lowest | 300 ₹2,100 | 400 ₹2,800 |
| 2.30 | Phase Plate ( 1 Set = R, Y & B) | 14 | Set | 220 ₹3,080 Lowest | 300 ₹4,200 | 400 ₹5,600 |
| 2.40 | Pipe type earthing material for towers | 14 | Set | 2,300 ₹32,200 Lowest | 2,800 ₹39,200 | 3,500 ₹49,000 |
| 3.00HARDWARE SUITABLE FOR ACSR ZEBRA | ||||||
| 3.10 | Double Tension fitting | 12 | Nos | 4,300 ₹51,600 Lowest | 6,000 ₹72,000 | 6,500 ₹78,000 |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
23 Dec 2020, 12:00 pmClosed
SE ETC MUZAFFARNAGAR
NEAR 132 KV SUB STATION BHOPA ROAD MUZAFFARNAGAR
work tender
2020_UPTCL_532654_1
ETC MU T 97 2020 21 Short Term tender
Open Tender
Electrical Works
Item Rate
120 days
220 KV NARA ROORKEE LINE
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
EE ETD MUZAFFARNAGAR
₹1.7 L
29 Dec 2020
24 Nov 2020
23 Dec 2020
24 Nov 2020
23 Dec 2020
24 Nov 2020
Amount
SCHEDULE Q-1 (SUPPLY)
Fabrication, Galvanising, Inspection & supply of 220KV DC tower including stubs, extensions & stub setting template, as per drawing & BOM.( 7 Nos Towers)
Hot dip galvanized, Hexagon, Round hexagon head transmission towers bolts, nuts & washers for above structure as per BOM.
TOWER ACCESSORIES
Number Plate
Danger Plate
Phase Plate ( 1 Set = R, Y & B)
Pipe type earthing material for towers
HARDWARE SUITABLE FOR ACSR ZEBRA
Double Tension fitting
Single tension fitting
160 KN Polymer Insulators for Tension Towers
Vibration damper
OPGW & Accesories
OPGW 48 Fibre including all its accessories for completion of the work.
SCHEDULE Q-2 (Work)
Survey including prepartion of profile &shedule of materials ,marking of locatons (Route length) ,GPS,Survey of Line With Co-ordinate of Each Tower
Survey &Check survey & peg marking
Cost of Excavation of 220 KV Tower foundation pits including all earthwork, backfilling Watering & levelling etc. DC(B+0) - 01 No, DC(C+5) - 02 Nos, DC(C+10)- 01 No & DC(C+15)- 03 Nos
Setting of stubs including all foundation work but excluding the cost of concerting & excavation for following 220 KV Towers DC(B+0)- 01 No DC(C+5)- 02 Nos
Setting of stubs including all foundation work but excluding the cost of concerting & excavation for following 220 KV Towers DC(C+10)- 01 Nos DC(C+15)- 03 Nos
Cost of concreting for following 220 KV Tower FS Foundation including cost of cement, dewatering, shoring & shuttering, forming and curing but excluding cost of reinforcement bars with 1:2:4 mix concrete. DC(B+0) - 01 No, DC(C+5) - 02 Nos, DC(C+10)- 01 No & DC(C+15)- 03 Nos
Installation of steel reinforcement bars in RCC foundation including cost of cutting ,Welding ,Binding &Placing them in foundations Pits.
Erection of Super structure of 220 KV Tower and their extensions where ever requided incl. all works above ground level excluding ,hoisting of insulator Hardware & assosaries,but including Fitting of danger, number, phase plates, bird guards and fixing and punchig.
Tack welding of all the Bolts upto the height of second section of the tower From ground Level with three tacks of 10 MM /12mm electrode and application of zinc rich Aluminium paint on the effected surface including cost of material for 07 Nos DC (B+0) - 01 No, (C+5) - 02 Nos, (C+10)- 01 No, (C+15)- 03 Nos
Laying, stringing, tensioning clamping, jointing etc to ACSR S/C Zebra conductor including hoisting of insulators, fitting of all necessary hardware and accessories i.e. fitting armour rods, vibration dampers etc on all three phases .
Layning, stringing, tensioning ,Clamping ,jointing Etc.OPGW including fitting of all nessosaries hardwares & assosories.
Double circuit all size Conductor Laying, stringing, tensioning clamping, jointing ACSR Zebra conductor including hoisting of insulators, fitting of all necessary hardware and accessories i.e. fitting vibration dampers etc on all three phases of railway track by special T&P to complete the Job.
Earthing of towers
De-stringing of old ACSR S/C 'Zebra' conductor including De-hoisting of all the nessasary hardwares & accessories of all three power conductor(section to section tower more then 1.76KM)
De-stringing of OPGW from Section to Section
Dismental of tower location No 10 ,11 & 12 type S/C Tower
Carriage of new material from available place to site and shifting of Dismental tower Material From site To JE store (Approximate70 KM ) at 220 KV S/S Nara
Shiam and sons
Jagad Electrical & Fabricators
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .