Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.0 LAccepted-AOC BALAJI COLONY GALI NO 3 OLD BYE PASS KAITHAL 136027 | KAITHAL | HARYANA | 136027 | ₹26.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹27.6 L+₹1.6 L (6.16%)Rejected-Finance N A | ₹27.6 L+₹1.6 L (6.16%) | L2 | Rejected-Finance L2 |
| 3 | L3₹28.2 L+₹2.1 L (8.26%)Rejected-Finance HARYANA HR | KURUKSHETRA | HARYANA | 136156 | ₹28.2 L+₹2.1 L (8.26%) | L3 | Rejected-Finance L3 |
| 4 | L4₹28.3 L+₹2.3 L (8.72%)Rejected-Finance DARBA KALAN WARD NO 9 GIGORANI DISTT SIRSA C O SIRSA ROAD NATHUSARI CHOPTA WARD NO 9 GIGORANI DISTT SIRSA C O SIRSA ROAD NATHUSARI CHOPTA 125110 | SIRSA | HARYANA | 125110 | ₹28.3 L+₹2.3 L (8.72%) | L4 | Rejected-Finance L4 |
| 5 | L5₹29.7 L+₹3.7 L (14.2%)Rejected-Finance C 46 OPP SECTOR 4 SURYA VIHAR GURUGRAM HARYANA | 2025 | ₹29.7 L+₹3.7 L (14.2%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | THE ROHINI COOP L&C SOCIETY LTD. L2 | THE SR COOPERATIVE L AND C SOCIETY LTD L3 | The Darba Kalan Shila Coop L/C Society Ltd. L4 | The Sangam Co-Operative Labour and Construction Society Limited Kaithal L1 | THE DAT GREENS COOPERATIVE L AND C SOCIETY LIMITED L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Operation and Maintenance charges
of LED street light 30/45/72Watt
point installed on pole / wall
(including on/off cost of material
charges i.e. tube Rod, Starter, Choke
Side Holder, PVC Tape Flexible wire,
Conductor/ cable etc. and arranging
of TandP i.e. Hydraulic ladder/
Wooden ladder safety belt / shoes
etc.) on various areas complete in
all respect up to the entire
satisfaction of engineer in
charge of the work. | 9,600 | Per Month | 39 ₹3,74,400 | 40 ₹3,84,000 | 40 ₹3,84,000 | 35 ₹3,36,000 Lowest | 42 ₹4,03,200 |
| 2.00 | Operation and Maintenance charges
of High Mast light with 100Watt LED
Flood Light point installed on pole /
wall (including on/off, cost of
material charges i.e. tube Rod,
Starter, Choke Side Holder PVC Tape
Flexible wire, Conductor/ cable etc.
and arranging of TandP i.e.
Hydraulic ladder/Wooden ladder
safety belt / shoes etc.) on various
areas complete in all respect up to
the entire satisfaction of engineer in
charge of the work. | 7,920 | Per Month | 176 ₹13,93,920 | 50 ₹3,96,000 | 180 ₹14,25,600 | 45 ₹3,56,400 Lowest | 189 ₹14,96,880 |
| 3.00 | Operation and Unlink/Reinstallation of bajaj street light of different wattege 20/36/45/72/90/120/150 on pole / wall
(including on/off cost of material
charges i.e. tube Rod, Starter, Choke
Side Holder, PVC Tape Flexible wire,
Conductor/ cable etc. and arranging
of TandP i.e. Hydraulic ladder/
Wooden ladder safety belt / shoes
etc.) on various areas complete in
all respect up to the entire
satisfaction of engineer in
charge of the work. | 50,880 | Each | 19.5 ₹9,92,160 Lowest | 40 ₹20,35,200 | 20 ₹10,17,600 | 37.5 ₹19,08,000 | 21 ₹10,68,480 |
Tender Value
₹28.2 L
EMD Value
₹27,000
Closing Date
19 May 2026, 10:00 amClosed
RAJESH KUMAR
Muncipal Committee Cheeka
OPERATION , MAINTENANCE AND UPKEEPNG OF STREET LIGHTS IN MUNICIPAL COMMITTEE CHEEKA AREA
2026_HRY_520342_1
20268C34592F 57FF 483B B59E E25449FA9289307ULB
Open Tender
Civil Works
Works
365 days
Cheeka
OPERATION , MAINTENANCE AND UPKEEPNG OF STREET LIGHTS IN MUNICIPAL COMMITTEE CHEEKA AREA
2 documents required · 2 mandatory
₹3,180
Yes
₹27,000
Yes
23 Jul 2026
8 May 2026
19 May 2026
8 May 2026
19 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation and Maintenance charges
of LED street light 30/45/72Watt
point installed on pole / wall
(including on/off cost of material
charges i.e. tube Rod, Starter, Choke
Side Holder, PVC Tape Flexible wire,
Conductor/ cable etc. and arranging
of TandP i.e. Hydraulic ladder/
Wooden ladder safety belt / shoes
etc.) on various areas complete in
all respect up to the entire
satisfaction of engineer in
charge of the work. | 9,600 | Per Month | - | - |
| 2 | Operation and Maintenance charges
of High Mast light with 100Watt LED
Flood Light point installed on pole /
wall (including on/off, cost of
material charges i.e. tube Rod,
Starter, Choke Side Holder PVC Tape
Flexible wire, Conductor/ cable etc.
and arranging of TandP i.e.
Hydraulic ladder/Wooden ladder
safety belt / shoes etc.) on various
areas complete in all respect up to
the entire satisfaction of engineer in
charge of the work. | 7,920 | Per Month | - | - |
| 3 | Operation and Unlink/Reinstallation of bajaj street light of different wattege 20/36/45/72/90/120/150 on pole / wall
(including on/off cost of material
charges i.e. tube Rod, Starter, Choke
Side Holder, PVC Tape Flexible wire,
Conductor/ cable etc. and arranging
of TandP i.e. Hydraulic ladder/
Wooden ladder safety belt / shoes
etc.) on various areas complete in
all respect up to the entire
satisfaction of engineer in
charge of the work. | 50,880 | Each | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_599234.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .