Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
Refer Docs
Closing Date
21 May 2024, 5:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Aerospace Composites Division
HINDUSTAN AERONAUTICS LIMITED Aerospace Composites Division Marathahalli Post, Bangalore - 560 037
Chopped Glass Strands and Aerosil Powder
7068
ACD/IMM/PUR5/MC591-1009 AND MC588-1082/RT/2024
Works
Helicopter Complex - Composites Mfg Divn - PUR5
₹0
Exempted
21 May 2024
22 Apr 2024
22 Apr 2024
21 May 2024
Price Terms/ Delivery Terms: Please note that your quotation should be net FOB / FCA export packed (Nearest International Airport)/ F.A.S. vessel (sea port) with no extra charges whatsoever.
a) If, for special reasons, you quote prices Ex-Works or F.O.B plant, you must prepay inland transportation’s, Port dues and shipment charges upto F.O.B. vessel at port of shipment and claim this amount at actuals along with the price of the goods through bank. Your quotation should indicate clearly the extent of such charges. b) Bidders have to bear all taxes, duties and levies payable in their country and HAL will bear all statutory levies, other than withholding tax and service tax, payable in India.
Liquidated Damages : In the event of an order, we reserve the right to collect a sum of 0.5% per week of delay or part thereof, subject to a maximum of 10% of basic value of PO, as our claim towards liquidated damages on basic value of the undelivered part of the order.
Terms of Payment: (i) In the event of an order, 100% payment will be made within 30 days after inspection and final acceptance at HAL, by wire transfer (foreign vendor) or RTGS (Indian vendor) or any other latest Electronic Payment remittance mode. ii) If under unavoidable situations payment has to be made through Letter of Credit, the same can be established for 100% of the order value before three months from the date of dispatch. All bank charges are to be borne by the vendor.
Taxes: In respect of Foreign bidders, bidders has to bear all taxes LC Charges, duties and levies payable in their country and HAL will bear all statutory levies, other than withholding tax and Goods & Service tax, payable in India.
Validity of quotation: Price quoted should be net and unless otherwise specified should remain valid for our acceptance for a minimum of 180 days from the closing date of enquiry and the materials offered should be kept under provisional reservation for this quotation.
Shelf Life (Mandatory for shelf life materials): The materials should have atleast 80% shelf life at the time of despatch. You should indicate Room Temperature Life, date of manufacture, date of expiry/ full shelf life of material on each roll/ package. Storage conditions to be indicated on each package/ container with supporting documents (technical/ material data sheets as per Manufacturer). AS APPLICABLE
Export Licence: Vendors should categorically confirm the availability/ability to obtain of export license from their government for exporting the system. Vendor shall be required to obtain and maintain all Export/Import licenses and permits etc., as the case may be, required for performing supplies against this tender. Obtaining export license shall be entire responsibility of the vendor.
Supply of alternative item: Bidder is requested to quote only for items (specifications, part numbers, etc) as per our enquiry. In case, bidder is quoting for an alternative part number, it should be confirmed that the offered part is fully interchangeable with the required part. Applicable descriptive literature/catalogue if any may please be enclosed by the bidder with offer (at least two copies). HAL reserves the right for acceptance/ rejection of the offered alternative item.
Quantity: a) Your quotation must be in the unit in which the quantity is indicated in the enquiry. If it is otherwise, conversion data must be furnished. b) HAL reserves the right to order quantity less than indicated in the enquiry /quoted for by bidder, at the prices quoted, without any reference to the bidder. c) If you consider the requested quantity small, you may quote for minimum ordering quantity.
INSPECTION, CONSEQUENCES OF REJECTION : The goods on receipt in HAL will be subject to inspection and tests, if necessary and HAL inspector’s decision as regards acceptance/rejection of goods shall be final and binding between the parties. (In case of Plant & Machinery, goods shall be finally inspected & accepted only after successful commissioning) If any stores are rejected, HAL shall be at liberty to: a) Either: i) Allow the contractor to re-submit stores in replacement of those rejected within a time specified by HAL, the contractor bearing the cost of freight in such replacement without being entitled to any extra payment, (or) ii) Buy the quantity of stores rejected or other of a similar nature elsewhere at the risk and cost of the contractor without effecting the contractor's liability as regards the supply of any further consignments due under the contract, (or) iii) Terminate the contract and recover from the contractor the loss HAL may thereby incur. The contractor shall not be entitled to any gain on the repurchase,
b) Any stores rejected by HAL’s Inspector must be removed by the contractor within 14 days from the date of receipt of intimation of rejection and at his own cost, failing which the contractor shall be liable to pay storage charges at 1% for each day of delay on the invoice value of the stores. If the stores are not removed within a month from the date of intimation of rejection, the stores will be liable, to be sold by HAL at the contractor’s risk and responsibility and the proceeds adjusted towards storage charges. c) In case any payment is made against delivery and it is found that the supplied item is rejected during inspection/commissioning, contractor will be required to choose any one of the following options to collect the rejected item for replacement: i) Refund the amount paid and collect the item for replacement. ii) Submit a Bank Guarantee for the amount already paid and collect the item for replacement. iii) Bring the replacement item to HAL and collect the rejected item.
Deliveries, Consequences of Breach: The date of delivery stipulated in the Purchase Order shall be deemed to be the essence of the Contract, and delivery must be completed on or by the dates mentioned in the Purchase Order or the tender. Should the Vendor fail to deliver the stores or any consignment thereof within the period prescribed for such delivery, HAL shall be entitled at their option: a. To recover from the Vendor as per liquidated damages, and not by way of penalty, a sum of 0.5% of the price of any stores which the contractor has failed to deliver as aforesaid, for each week or part thereof during which the delivery or such stores may be in arrears subject to a maximum of 10% of the price of the stores in default (or) b. To purchase elsewhere, with or without notice to the Vendor on the account and at the risk of the Vendor, the stores not delivered or others of a similar description (where other exactly complying with the particulars are not available), HAL’s decision in this respect will be final (or) c. To terminate the contract in the event of action being taken under Para – (a) & (b) above, the Vendor shall be liable for any loss which HAL may sustain on the account, but the Vendor shall not be entitled to any gain on repurchases made against default.
In cases where authorised dealer/distributor/channel partner participate in a tender on behalf of a manufacturer, they should not quote on behalf of any other manufacturer in the same tender. In case of receipt of more than one bid from such authorised dealer/distributor/channel partner, such bids will be summarily rejected.
Limitation of Liability: Except in cases of criminal negligence or wilful misconduct, the aggregate liability of the Supplier to the HAL, whether under the contract, in tort or otherwise, shall not exceed the total or 100% of the Contract Price, provided that this limitation shall not apply to the cost of repairing or replacing defective equipment, or to any obligation of the Supplier to indemnify the HAL concerning IPR infringement.
Option Clause: HAL reserves the right to order additional quantities up to 50% of the ordered quantity as per the price, terms & conditions of the resultant contract during the currency of the contract. It is entirely at the discretion of HAL to exercise this option. The additional quantities may be ordered in staggered manner in different years of supply at the discretion of HAL at any time during the currency/period of Contract
Tender Evaluation:
Tender Evaluation: a. Tender will be evaluated line wise unless otherwise specified. i) In case of bidder does not agree for LD clause, the maximum LD amount / to the extent not agreed LD value, will be loaded in the Comparative Statement:-((10-L)*Q/100), to determine the successful bidder . ii) In case bidder does not agree for submission of Performance Bank Guarantee / retention of equivalent amount, the offer will be summarily rejected. iii) In case bidder does not agree for submission of Security Deposit, loading will be carried out as per following formula while preparing Price comparative statement :- S% OF Quoted value. - (S%*Q/100) [S= Security Deposite (SD factor)] iv) If bidder does not agree for warranty as per our RFQ, loading will be carried out as per following formula while preparing Price comparative statement :- 0.03*Q*(WR-WQ)/12; WR-WARRANTY IN MONTHS AS PER RFQ; WQ-WARRANTY OFFERED IN MONTHS ; Q-QUOTED PRICE. v) In case, the bid is Ex-works for local bidder:- 0.02*Q; Q-QUOTED PRICE shall be loaded for commercial evaluation. vi) In case of payment against delivery the loading factor considered for evaluation ((X/100)*Q*R/12)*0.02 (X% AGAINST DELIVERY), Q is quoted rate, R is annual LIBOR/MCLR. vii) In case of advance payment terms,the loading factor considered for evaluation is:- ((T/ 12)*(R+2)/100*QA); T-LC/Advance duration in Months as per PO; R is annual LIBOR/MCLR; QA-Extent of Advance payment in Quoted price.
Please provide your bank account details, swift code etc.. - same will be mentioned in purchase order
Non-conformities between Figures and Words: Sometimes, non-conformities/errors are observed in the bids between the quoted prices in figures and in words. This should be taken care of in the following manner: a) If, in the price structure quoted, there is discrepancy between the unit price and total price (which is obtained by multiplying the unit price by the quantity), the unit price shall prevail and the total price corrected accordingly; b) If there is an error in a total corresponding to the addition or subtraction of sub-totals, the sub-totals shall prevail and the total shall be corrected; and c) If there is a discrepancy between words and figures, the amount in words shall prevail. d) Such a discrepancy in an offer should be conveyed to the Bidder asking him to respond by a target date and if the Bidder does not agree to HAL’s observation, the bid is liable to be rejected.
Supply should be from the latest batch of manufacture and should be covered with a) Original ink-signed invoice b) Packing list c) Certificate of Conformity/ Release Note issued by OEM d) Manufacturer's Test Reports (indicating incoming inspection values) e) Certificate of date of manufacture and shelf life in case of shelf life items. These documents to be supplied along with consignment and should be from Manufacturer only (duly signed by competent authority of Quality Assurance Department of Manufacturer). This is mandatory documents to be supplied, failing which supply will not be accepted.
Packing: The Vendor will be held responsible for the stores being sufficiently and properly packed for tropical storage and for transport by rail, road, sea or air so as to ensure their being free from loss or injury on arrival at their destination. The packing and marking of packages shall be done by and at the expense of the vendor. Each package shall contain a Packing Note quoting Purchase Order number and date showing its contents in detail. Each shall be properly marked with Purchase Order No., Consignee’s name & address, packagehandling instructions etc. The package shall have adequate provision for handling during transit.
“The Bidder/Vendor confirms and declares to the buyer that the Bidder/Vendor is the original manufacturer or authorized distributor/stockist of original manufacturer or Govt. Sponsored/ Designated Export Agencies (applicable in case of countries where domestic laws do not permit direct export by OEMs) of the stores referred to in this offer/ contract/ Purchase order and has not engaged any individual or firm, whether Indian or Foreign whatsoever, to intercede, facilitate or in any way to recommend to Buyer or any of its functionaries, whether officially or unofficially, to the award of the contract/ purchase order to the Bidder/Vendor; nor has any amount been paid, promised or intended to be paid to any such individual or firm in respect of any such intercession, facilitation or recommendation. The Bidder/Vendor agrees that if it is established at any time to the satisfaction of the Buyer that the present declaration is in any way incorrect or if at a later stage it is discovered by the Buyer that the Bidder/Vendor has engaged any such individual/ firm, and paid or intended to pay any amount, gift, reward, fees, commission or consideration to such person, party, firm or institution, whether before or after the signing of this contract/ purchase order, the Bidder/Vendor will be liable to refund that amount to the Buyer. The Bidder/Vendor will also be debarred from participating in any RFQ/Tender for new projects/program with Buyer for a minimum period of five years. The Buyer will also have a right to consider cancellation of the Contract/ Purchase Order either wholly or in part, without any entitlement or compensation to the Bidder/Vendor who shall in such event be liable to refund all payments made by the Buyer in terms of the Contract/ Purchase order along with interest at the rate of 2% per annum above Secured Overnight Financing Rate (SOFR) (for foreign vendor) and Marginal Cost of Funds-based Lending Rate (MCLR) of (State Bank of India) plus 2% per annum (for Indian vendor). The Buyer will also have the right to recover any such amount from any contracts/ Purchase Order concluded earlier with Buyer.”
Immunity to Government of India: It is understood and agreed that the Government of India is not a party to this agreement and has no liabilities, obligations or rights hereunder. It is expressly understood and agreed that HAL, Aerospace Composites Division is an independent legal entity with power and authority to enter into contracts solely in its own behalf under the applicable Laws of India and General Principles of Contract Law. The vendor shall agree, acknowledge and understand that HAL, Aerospace Composites Division is not an agent, representative or delegate of the Government of India. It is further understood and agreed that the Government of India is not and shall not be liable for any acts, omissions, commissions, breaches or other wrongs arising out of the contract. Accordingly, vendor expressly waives, releases and foregoes any and all actions or claims against the Government of India arising out of this contract, not to sue the Government of India as to any manner, claim, cause of action or thing whatsoever arising out of or under this agreement.
Receipt & Despatch: The Vendor is responsible for obtaining a clear receipt from the Transport Authorities specifying the goods dispatched. He will not book any consignment on a said to contain’ basis. If he does so, he does it on his own responsibility. HAL will take no responsibility for short deliveries or wrong supply of goods when the same are booked on said to contain’ basis. HAL shall pay for only such stores as are actually received by them in accordance with the contract.
Appropriation: Whenever under this contract any sum of money is recoverable from any payable by the contractor, HAL shall be entitled to recover such sum by appropriating in part or whole by deducting any sum then due or which at any time thereafter may become due to the contractor in this or any other contract entered by HAL as a whole its Divisions and Branch Offices etc., held by him alone or in partnership with others.
Dispute Resolution Mechanisms : 1 Settlement of Disputes and Arbitration a) Below clause is applicable to organizations other than PSUs/ DPSUs or MSEs or Foreign Vendors: Amicable Settlement: Any dispute or difference whatsoever arising between the parties out of or relating to the construction, meaning, scope, operation or effect of this contract or the validity or the breach thereof shall be settled by bilateral discussions.
ARBITRATION The arbitration tribunal shall be consisting of sole arbitrator. The arbitrator, who shall not be a citizen or domicile of the country of either of the parties or of any other country unacceptable to any of the parties, shall be nominated by the parties within ninety (90) days of the receipt of the notice mentioned above, failing which the arbitrator may be nominated under the provisions of Indian Arbitration and Conciliation Act, 1996 or by dispute resolution institution like International Centre for Alternative Dispute Resolution (ICADR) or India International Arbitration Centre (IIAC). In case, nomination of sole arbitrator under Indian Arbitration and Conciliation Act, 1996 or by dispute resolution institution like ICADR/IIAC is not acceptable to either of the parties, then the sole arbitrator may be nominated by the President of International Chamber of Commerce, Paris, but the said nomination would be after consultation with both the parties and shall preclude any citizen with domicile of any country as mentioned above.
JURISDICTION The Court at Bangalore, India only shall have jurisdiction to deal with and to decide any legal matter whatsoever arising out of this contract.
SUB-CONTRACT Neither of the parties of this contract shall be entitled without the other party's consent to assign or transfer to a third party all or part of the benefits or obligations of this contract.
Short Closure Contract: HAL reserves the right to short close this contract with prior notice to the vendor at any time during the tenure of the contract. The liabilities if any shall be mutually discussed and agreed.
Termination of Contract: HAL reserves the right to terminate the contract in case of failure to perform contractual obligations to the satisfactory of HAL and entrust the job to alternate source at HAL’s discretion and at your risk and cost.
FALL CLAUSE The price quoted shall be in no event exceed the lowest price at which you sell the stores or offer to sell stores of identical description to any person(s) / organization including the purchases by any department of the Govt. of India, the State Govt. or any statutory undertaking of the Govt. of India / State Govt., as the case may be during the period till the completion of the performance of the order placed and during currency of the order. If at any time during the said period, the contractor reduces the sales price, sells or offers to sell such stores to any person/organization including the purchaser or any department of Central Govt. or any Dept. of State Govt., or any statutory undertaking of the Central or State Govt., as the case may be at a price lower than the price chargeable under the contract, he shall forthwith notify such reduction/sale or offer to sale to the Hindustan Aeronautics Limited and the price payable under the contract for the stores supplied after the date of coming into force of such reduction or sale or offer to sale shall stand correspondingly reduced.
Agents / Agency Commission: (Note: HAL has not appointed/authorized any person/agent to deal with the vendors in respect of the said contract. In case, if someone claims and interacts with the vendors it shall be duty of the vendors to bring such instances to the notice of HAL Management). The vendor confirms and declares to the Buyer that the vendor is the original manufacturer or authorized distributor/stockist of original manufacturer or Govt. Sponsored/ Designated Export Agencies (applicable in case of countries where domestic laws do not permit direct export by OEMs) of the stores referred to in this offer/contract/Purchase order and has not engaged any individual or firm, whether Indian or Foreign whatsoever, to intercede, facilitate or in any way to recommend to Buyer or any of its functionaries, whether officially or unofficially, to the award of the contract/purchase order to the vendor; nor has any amount been paid, promised or intended to be paid to any such individual or firm in respect of any such intercession, facilitation or recommendation. The vendor agrees that if it is established at any time to the satisfaction of the Buyer that the present declaration is in any way incorrect or if at a later stage it is discovered by the Buyer that the vendor has engaged any such individual/firm, and paid or intended to pay any amount, gift, reward, fees, commission or consideration to such person, party, firm or institution, whether before or after the signing of this contract/ purchase order, the vendor will be liable to refund that amount to the Buyer. The vendor will also be debarred from participating in any RFQ/ Tender for new projects/program with Buyer for a minimum period of five years. The Buyer will also have a right to consider cancellation of the Contract/ Purchase order either wholly or in part, without any entitlement or compensation to the vendor who shall in such event be liable to refund all payments made by the Buyer in terms of the Contract/ Purchase order along with interest at the rate of 2% per annum above Secured Overnight Financing Rate (SOFR) (for foreign vendor) and Marginal Cost of Funds-based Lending Rate (MCLR) (State Bank of India) plus 2% per annum (for Indian vendor). The Buyer will also have the right to recover any such amount from any contracts/ Purchase order concluded earlier with Buyer.
Risk Purchase The supplier will supply quality items as per the purchase order/approved sample and also the quantity in full as per terms and conditions of order. In case the supplier fails to execute the order, either in terms of quality or quantity, HAL reserves the right to procure from elsewhere at the risk and cost of the supplier and any extra expenditure incured due to this purchase is payable by the supplier.
Repeat Order: HAL reserves the right to place repeat Order up to 100% of the value of the original order (statutory levies shall be paid as applicable) within 12 months from the date of completion of the original order. The prices, terms and conditions of the repeat order shall be the same as that of the original. However, placement of repeat order is not guaranteed and this will be at the sole discretion of HAL.
Parallel Arrangement: Any Order awarded to the successful bidder as a result of this tender, will be on non-exclusive basis. HAL reserves the right of entering into parallel contract(s)/ release parallel Order(s) with any other firms now or here after.
Purchase Preference Policy: In ine with Public Procurement (preference to Make in India) Order, 2017, issued by Goverment of India, preference will be accorded to the bids submitted by Indian bidders, subject to fulfillment of conditions (Attached).
Exit Criteria: i. The contract/order may be terminated under the following circumstances: a. In the event of unsatisfactory performance by the vendor during the contract period, or any of the information provided by the supplier is found to be untrue, or supplier is found to have attempted to influence any person involved with the contract through unethical means, the contract shall be terminated with one month's advance notice without any financial implication to HAL. Notwithstanding the foregoing, in cases where it is found that a supplier is engaged in unethical practices, the same shall be barred from participating in the future contracts for a period indicated in the Purchase Manual. b. If there is change in the Customer requirement, contract shall be terminated with one month's advance notice. The liability of HAL in this case will be agreed mutually. c. The supplier is declared bankrupt or becomes insolvent. d. The delivery of material is delayed due to causes of Force Majeure by more than three months). e. Based on the decision of the Arbitration Tribunal. ii. In the event of termination of contract by either party the supplier shall ensure the following: a. IPRs are transferred to HAL to enable HAL to proceed on the work with other suppliers. Suppliers also will render all assistance till the other suppliers fully take over the balance work. b. Transfer title and deliver all or any part thereof of the supplies, materials, work-in-process, finished Products, Tooling, drawings and data produced or acquired by vendor specifically for the Product being terminated. c. Supplier shall ensure supply of products and its components / spares at least for a period of ten years from the date of such termination.
CONFILCT OF INTEREST: Conflict of interest, which substantially affects fair competition, shall not be eligible to bid in this tender. Bids found to have a conflict of interest shall be rejected as nonresponsive. A bidder in this Tender Process shall be considered to have a conflict of interest if the bidder: a) directly or indirectly controls, is controlled by or is under common control with another Bidder; or b) receives or have received any direct or indirect subsidy/ financial stake from another bidder; or c) has the same legal representative as another bidder for purposes of this bid. A Principal can authorize only one representative, and the representative also should not represent or quote on behalf of more than one Principal. However, this shall not debar more than one Authorised distributor from quoting equipment manufactured by an Original Equipment Manufacturer (OEM), in procurements under Proprietary Article Certificate; or d) has a relationship with another bidder, directly or through common third parties, that puts it in a position to have access to information about or influence the bid of another Bidder or influence the decisions of the Procuring Entity regarding this Tender process; or participates in more than one bid in this tender process; or e) Participation in any capacity by a Bidder (including the participation of a Bidder as sub-contractor in another bid or vice-versa) in more than one bid shall result in the disqualification of all bids in which he is a party. However, this does not limit the participation of a non-bidder firm as a sub-contractor in more than one bid; or f) would be providing goods, works, or non-consulting services resulting from or directly related to consulting services that it provided (or were provided by any affiliate that directly or indirectly controls, is controlled by, or is under common control with that firm), for the procurement planning (inter-alia preparation of feasibility/ cost estimates/ Detailed Project Report (DPR), design/ technical specifications, Terms of Reference (ToR)/ Activity Schedule/ schedule of requirements or the Tender Document etc.) of this Tender process; or
g) has a close business or family relationship with a staff of the Procuring Organization who: i) are directly or indirectly involved in the preparation of the Tender document or specifications of the Tender Process, and/or the evaluation of bids; or ii) would be involved in the implementation or supervision of resulting Contract. h) In cases of authorised distributors quoting on behalf of their principal manufacturers, an authorised distributor cannot represent two manufacturers or quote on their behalf in a particular tender enquiry. There can be only one bid from the following: i) The principal manufacturer directly or through an authorised distributor on his behalf; and ii) Authorised distributor on behalf of only one principal.
Indemnity: The successful bidder/Supplier shall defend, indemnify and hold HAL harmless from and against all actions,causes of action, liabilities, claims, suits, judgment, liens, awards, damages of any kind and nature whatsoever and expenses and costs of litigation to the extent such claims arise out of infringement of any IPR, patent, copyright, trademark or inv
Termination for Default of Seller or for other reasons: HAL shall have the right to short close present Contract in part or in full by giving 1 month prior notice to the Supplier, in any of the following cases:- a) The work is delayed or cancelled for causes attributable to force majeure. b) The requirement is withdrawn by HAL’s Customer. c) The Supplier is declared bankrupt or becomes insolvent. d) It is noticed that the firm has utilized the services of any agent to get the resulting Order and paid anycommission to such agent. e) As per decision of the Arbitration Tribunal. f) In case any part of the Order is subcontracted by the Supplier without prior permission of HAL. g) If the performance of the Supplier is not found satisfactory during the execution of work. In any of the above stated case, no claim of damage etc., by the Supplier will be allowed. Termination for Default of Either of the Party : Either of the Party shall have the right to short close present Contract in part or in full by giving 1 month prior notice to the other Party, in any of the following cases:- a) The work is delayed or cancelled for causes attributable to force majeure. b) The requirement is withdrawn by the end Customer. c) Either of the Party is declared bankrupt or becomes insolvent. d) It is noticed that either of the Party has violated/breached the Integrity.
e) As per decision of the Arbitration Tribunal. f) Either of the Party has assigned the contract to a third party without prior permission from other party. g) If the performance of either of the Party is not found satisfactory to the other Party during the execution of work. In any of the above stated case, no claim of damage etc., by the defaulting Party will be allowed.
QUALITY ASSURANCE REQUIREMENTS
HINDUSTAN AERONAUTICS LIMITED Aerospace Composites Division (Formerly known as Composite Manufacturing Division) Marathahalli Post Bangalore - 560 037 INDIA
PART - I
COMMERCIAL TERMS & CONDITIONS ( No Prices should be mentioned in this document)
Conditions of Tender - Indian Bidders
Tender Ref. No.: ACD/IMM/PUR5/MC591-1009 & MC588-1082/RT/2024
Name of the Vendor/ Firm:
Quotation Ref. No.:
Terms of Payment: In the event of an order, 100% payment will be made within 30 days after inspection and final acceptance at HAL, by wire transfer (foreign vendor) or RTGS (Indian vendor) or any other latest Electronic Payment remittance mode.
Liquidated Damages: In the event of an order, we reserve the right to collect a sum of 0.5% per week of delay or part thereof, subject to a maximum of 10% as our claim-towards liquidated damages on the undelivered part of the order. In case of tenderers not agreeing for LD clause, the maximum LD amount ( 10%) / to the extent not agreed LD value, will be loaded in the Comparative Statement, to determine the successful bidder. Loading factor will be calculated as below : 0.02*(10-L)*Q/10 Q: Quoted rate, L: Maximum rate of LD agreed
Validity of the quotation: Price quoted should be net and unless otherwise specified should remain valid for our acceptance for a minimum of 180 days from the closing date of enquiry and the materials offered should be kept under provisional reservation for this quotation.
Delivery: As per delivery schedule mentioned in Technocommercial Bid Material to be from fresh batch only. HAL may advance/ postpone deliveries with advance notice, if required. Prices should be firm for complete delivery as per ordered quantity.
Shelf Life (Mandatory for shelf life materials): The material should have atleast 80% shelf life at the time of dispatch. You should indicate Room Temperature Life, date of manufacture, date of expiry/ full shelf life of material on each roll/ package. Storage conditions to be indicated on each package/ container with supporting documents (technical/ material data sheets as per Manufacturer). AS APPLICABLE
Supply of alternative item: Bidder is requested to quote only for items (specifications, part numbers, etc) as per our enquiry. In case, bidder is quoting for an alternative part number, it should be confirmed that the offered part is fully interchangeable with the required part. Applicable descriptive literature/catalogue if any may please be enclosed by the bidder with offer (at least two copies). HAL reserves the right for acceptance/ rejection of the offered alternative item.
Quantity: a) Your quotation must be in the unit in which the quantity is indicated in the enquiry. If it is otherwise, conversion data must be furnished. b) HAL reserves the right to order quantity less than indicated in the enquiry /quoted for by bidder, at the prices quoted, without any reference to the bidder. c) If the bidder considers that tendered quantity is small, the bidder may quote for Minimum Ordering Quantity (MOQ)
Tender evaluation: a) The tender will be evaluated on line item basis unless specifically mentioned. b) Bid with lowest price conforming to the specification will be considered for placement of order. c) If the bidder considers that tendered quantity is small, the bidder may quote for Minimum Ordering Quantity (MoQ). Commercial evaluation in this case will be done on MoQ x unit price, if MOQ offered is beyond 20% of RFQ quantity. Evaluation will be done on Landed cost basis. d) If two or more bidders quote the same price, HAL reserves the right to seek revised offer from the same bidders and placing order on revised L-1 offer. If same situation prevails then HAL reserve the right to place order on any of them. e) If the lowest bidder has not offered full quantity, for the balance quantity HAL reserves the right to source from other bidders on L1 price. f) Conditional discounts will not be considered in evaluation of tender. g) In case of tenderers not agreeing for LD clause, the maximum LD amount / to the extent not agreed LD value, will be loaded in the Comparative Statement, to determine the successful bidder. Loading factor will be calculated as below : 0.02*(10-L)*Q/10 Q: Quoted rate, L: Maximum rate of LD agreed if LD clause not agreed, loading factor 2% on basic price will be considered for evaluation. h) In case of payment (other than direct payment) against delivery, LC and advance payment terms etc,the loading factor 2% on basic price will be considered for evaluation.
Levies & Taxes:
Unless the rate at which GST chargable are clearly shown separately, claim for GST will not be entertained later. It would be assumed that rates are inclusive of GST. In case, the vendor wants the taxes to be paid over and above the quoted rates, the taxes, and other Govt. levies should be indicated in detail.
Income tax & TCS: In the event of placement of order, income tax & TCS will be deducted at source from the charges as per govt Regulations. Please furnish your PAN and GST registration number.
Delivery : Lead time quoted should be firm. Please indicate the number of days/weeks/months required for delivery of items
INSPECTION, CONSEQUENCES OF REJECTION : The goods on receipt in HAL will be subject to inspection and tests, if necessary and HAL inspector’s decision as regards acceptance/rejection of goods shall be final and binding between the parties. (In case of Plant & Machinery, goods shall be finally inspected & accepted only after successful commissioning) If any stores are rejected, HAL shall be at liberty to: a) Either: i) Allow the contractor to re-submit stores in replacement of those rejected within a time specified by HAL, the contractor bearing the cost of freight in such replacement without being entitled to any extra payment, (or) ii) Buy the quantity of stores rejected or other of a similar nature elsewhere at the risk and cost of the contractor without effecting the contractor's liability as regards the supply of any further consignments due under the contract, (or) iii) Terminate the contract and recover from the contractor the loss HAL may thereby incur. The contractor shall not be entitled to any gain on the repurchase,
b) Any stores rejected by HAL’s Inspector must be removed by the contractor within 14 days from the date of receipt of intimation of rejection and at his own cost, failing which the contractor shall be liable to pay storage charges at 1% for each day of delay on the invoice value of the stores. If the stores are not removed within a month from the date of intimation of rejection, the stores will be liable, to be sold by HAL at the contractor’s risk and responsibility and the proceeds adjusted towards storage charges. c) In case any payment is made against delivery and it is found that the supplied item is rejected during inspection/commissioning, contractor will be required to choose any one of the following options to collect the rejected item for replacement: i) Refund the amount paid and collect the item for replacement. ii) Submit a Bank Guarantee for the amount already paid and collect the item for replacement. iii) Bring the replacement item to HAL and collect the rejected item.
Additional Terms & conditions Public Procurement (Preference to Make in India), Appendix-A (Type II) (pdf attached)
Restrictions under Rule 144(xi) of the General Financial Rules (GFRs) issue by GoI, Ministry of Finance, Department of Expenditure (DOE). Annexure-II A, Type I or Type II as applicable (pdf attached)
Please provide your bank account details, swift code etc.. - same will be mentioned in purchase order
Supply should be from the latest batch of manufacture and should be covered with a) Original ink-signed invoice b) Packing list c) Certificate of Conformity/ Release Note issued by OEM/ Type approval certificate from CEMILAC / RCMA d) Manufacturer's Test Reports (indicating incoming inspection values) e) Certificate of date of manufacture and shelf life in case of shelf life items. These documents to be supplied along with consignment and should be from Manufacturer only (duly signed by competent authority of Quality Assurance Department of Manufacturer). This is mandatory documents to be supplied, failing which supply will not be accepted. Indian Manufacturers will need to provide Type approval from CEMILAC / RCMA
i) HAL does not bind itself to accept the lowest tender and reserves the right to itself of accepting or rejecting the whole or any part of the tender or the quantity offered in full or in part. Tenderer will have the obligation to supply the accepted quantity at the offered rate. ii) Disregard of any instructions, may result in your offer being ignored. iii) The final rights/ decision regarding acceptance/ rejection of quotation against subject tender without assigning reasons thereof rests with HAL. iv) Vendor shall not be entitled without HAL’s consent to assign or transfer to a third party all or part of the benefits or obligations under this contract.
In cases where authorised dealer/distributor/channel partner participate in a tender on behalf of a manufacturer, they should not quote on behalf of any other manufacturer in the same tender. In case of receipt of more than one bid from such authorised dealer/distributor/channel partner, such bids will be summarily rejected.
Agents / Agency Commission: (Note: HAL has not appointed/authorized any person/agent to deal with the vendors in respect of the said contract. In case, if someone claims and interacts with the vendors it shall be duty of the vendors to bring such instances to the notice of HAL Management). The vendor confirms and declares to the Buyer that the vendor is the original manufacturer or authorized distributor/stockist of original manufacturer or Govt. Sponsored/ Designated Export Agencies (applicable in case of countries where domestic laws do not permit direct export by OEMs) of the stores referred to in this offer/contract/Purchase order and has not engaged any individual or firm, whether Indian or Foreign whatsoever, to intercede, facilitate or in any way to recommend to Buyer or any of its functionaries, whether officially or unofficially, to the award of the contract/purchase order to the vendor; nor has any amount been paid, promised or intended to be paid to any such individual or firm in respect of any such intercession, facilitation or recommendation. The vendor agrees that if it is established at any time to the satisfaction of the Buyer that the present declaration is in any way incorrect or if at a later stage it is discovered by the Buyer that the vendor has engaged any such individual/firm, and paid or intended to pay any amount, gift, reward, fees, commission or consideration to such person, party, firm or institution, whether before or after the signing of this contract/ purchase order, the vendor will be liable to refund that amount to the Buyer. The vendor will also be debarred from participating in any RFQ/ Tender for new projects/program with Buyer for a minimum period of five years. The Buyer will also have a right to consider cancellation of the Contract/ Purchase order either wholly or in part, without any entitlement or compensation to the vendor who shall in such event be liable to refund all payments made by the Buyer in terms of the Contract/ Purchase order along with interest at the rate of 2% per annum above Secured Overnight Financing Rate (SOFR) (for foreign vendor) and Marginal Cost of Funds-based Lending Rate (MCLR) (State Bank of India) plus 2% per annum (for Indian vendor). The Buyer will also have the right to recover any such amount from any contracts/ Purchase order concluded earlier with Buyer.
Risk Purchase: The Supplier will supply quality items as per purchase order/ approved sample and also the quantity intended by the concerned Division in full as per terms and conditions of purchase order. In case the supplier fails to execute the order either in terms of quality or in quantity, HAL reserves the right to procure from elsewhere at the risk and cost of the supplier and any extra expenditure incurred due to this purchase is payable by the supplier.
Immunity to Government of India: It is understood and agreed that the Government of India is not a party to this agreement and has no liabilities, obligations or rights hereunder. It is expressly understood and agreed that HAL, Composites Manufacturing Division is an independent legal entity with power and authority to enter into contracts solely in its own behalf under the applicable Laws of India and General Principles of Contract Law. The vendor shall agree, acknowledge and understand that HAL, Composites Manufacturing Division is not an agent, representative or delegate of the Government of India. It is further understood and agreed that the Government of India is not and shall not be liable for any acts, omissions, commissions, breaches or other wrongs arising out of the contract. Accordingly, vendor expressly waives, releases and foregoes any and all actions or claims against the Government of India arising out of this contract, not to sue the Government of India as to any manner, claim, cause of action or thing whatsoever arising out of or under this agreement.
Dispute Resolution Mechanisms : 1 Settlement of Disputes and Arbitration a) Below clause is applicable to organizations other than PSUs/ DPSUs or MSEs or Foreign Vendors: Amicable Settlement: Any dispute or difference whatsoever arising between the parties out of or relating to the construction, meaning, scope, operation or effect of this contract or the validity or the breach thereof shall be settled by bilateral discussions.
ARBITRATION: All disputes or differences whatsoever arising between the parties out of or relating to the construction, meaning and operation or effect of this Contract or the breach thereof shall be settled by Arbitration in accordance with the Rules of Arbitration of the ICA/ICADR/IIAC and the award made in pursuance thereof shall be binding on the parties. The provisions of the Arbitration and conciliation Act 1996 or any statutory modifications thereof shall apply to such conciliation.
Short Closure of the contract: HAL reserves the right to short close this contract with prior notice of one month to the vendor at any time during the tenure of the contract. The liability of HAL in this case will be limited to the extend equivalent to the proportion of the cost of development / testing etc., incurred by you till the point of termination of the contract.
Termination of the contract: In case of breach of contract, aggrieved party shall advise in writing to other regarding specific terms of contract which has been breached and will provide reasonable opportunity to improve upon within a specific time period, failing which the aggrieved party have the right to terminate the contract with 1 months notice. Liabilities towards termination shall be discussed and mutually agreed upon.
Sub-Contracting: Subcontracting/ Transferring of obligation of contract arising out of this tender is prohibited without the HAL's consent to assign or transfer such obligations/ benefits.
Repeat Order: In the event of placement of a PO, Repeat order (single or multiple orders totaling to 100% value of the PO) can be placed by HAL after placement of the original order, but within 12 months from the date of completion of the original order.
Fall Clause: a) The price charged for the stores supplied under the contract by the contractor shall be in no event exceed the lowest price at which the contractor sells the stores or offers to sell stores of identical description to any persons/organizations including the purchaser of any department of the Central Govt. or any Dept. of the State Govt. or any statutory undertaking of the Central or State Govt., as the case may be during the period till the performance of the supply order placed and during currency of the contract is completed. b) If at any time during the said period, the contractor reduces the sales price, sells or offers to sell such stores to any person/organization including the purchaser or any department of Central Govt. or any Dept. of State Govt. or any statutory undertaking of the Central or State Govt. as the case may be at a price lower than the price chargeable under the contract, he shall forewith notify such reduction/sale or offer to sale to the Hindustan Aeronautics Limited and the price payable under the contract for the stores supplied after the date of coming into force of such reduction or sale or offer to sale shall stand correspondingly reduced.
Purchase Preference Policy: In ine with Public Procurement (preference to Make in India) Order, 2017, issued by Goverment of India, preference will be accorded to the bids submitted by Indian bidders, subject to fulfillment of conditions (Attached).
EXIT CRITERIA: i. The contract/order may be terminated under the following circumstances: a. In the event of unsatisfactory performance by the vendor during the contract period, or any of the information provided by the supplier is found to be untrue, or supplier is found to have attempted to influence any person involved with the contract through unethical means, the contract shall be terminated with 1 month advance notice without any financial implication to HAL. Notwithstanding the foregoing, in cases where it is found that a supplier is engaged in unethical practices, the same shall be barred from participating in the future contracts for a period indicated in the HAL's Purchase Manual. b. If there is change in the Customer requirement, contract shall be terminated with 1 month's advance notice. The liability of HAL in this case will be agreed mutually. c. The supplier is declared bankrupt or becomes insolvent. d. The delivery of material is delayed due to causes of Force Majeure by more than (3 months). e. Based on the decision of the Arbitration Tribunal. ii. In the event of termination of contract by either party the supplier shall ensure the following: a. IPRs are transferred to HAL to enable HAL to proceed on the work with other suppliers. Suppliers also will render all assistance till the other suppliers fully take over the balance work. b. Transfer title and deliver all or any part thereof of the supplies, materials, work-in-process, finished Products, Tooling, drawings and data produced or acquired by vendor specifically for the Product being terminated. c. Supplier shall ensure supply of products and its components / spares at least for a period of one years from the date of such termination.
Indemnity: The successful bidder/Supplier shall defend, indemnify and hold HAL harmless from and against all actions, causes of action, liabilities, claims, suits, judgment, liens, awards, damages of any kind and nature whatsoever and expenses and costs of litigation to the extent such claims arise out of infringement of any IPR, patent, copyright, trademark or involve wrongful use of trade secret or confidential information or negligence attributable to the Supplier.
Bribes and Gifts: Any bribe, commission, gift or advantage given, promised or offered by or on behalf of the Vendor or his parties, agent or servant or any one on his or their behalf to any officer, servant, representative or agent of HAL or any person on his or their behalf in relation to the obtaining or to the execution of this or any other contract with HAL shall in addition to any criminal liability which the Vendor may incur, subject to the Vendor to the cancellation of this and all other contracts with HAL and also to payment of any loss or damage resulting from any such cancellation thereof. Any question or dispute as to the commission of any offence under the present clause shall be settled by HAL in such manner and on such evidence or information as they may think fit and sufficient and their decision shall be final and conclusive.
SUB-CONTRACT: Neither of the parties of this contract shall be entitled without the other party's consent to assign or transfer to a third party all or part of the benefits or obligations of this contract.
Applicable law & Jurisdiction: This contract shall be governed by and subject to and interpreted and construed in accordance with the Laws of Republic of India, as may be in force from time to time and the court of Bangalore, India only shall have jurisdiction to deal with and decide any legal matter whatsoever arising out of this contract.
TERRITORY: In the event of placement of PO, the contract (PO) shall be governed by and subject to and interpreted and construed in accordance with the Laws of Republic of India, as may be in force from time to time
Debarred/ banned or blacklisted : Bidders to confirm whether, they have been debarred/ banned/ blacklisted or not by any Division/ Office of HAL/ PSE/PSU/CPSE/Ministry of Defence or any institutions/offices of State & central GOI. Also upload self certification for not banned status in mandatory documents in eproc portal. If at later stages its been found that your company is banned or blacklisted or if you have provided any false certification, suitable action will be initiated as deemed fit by HAL.
Conflict of Interest: Conflict of interest, which substantially affects fair competition, shall not be eligible to bid in this tender. Bids found to have a conflict of interest shall be rejected as nonresponsive. A bidder in this Tender Process shall be considered to have a conflict of interest if the bidder: a) directly or indirectly controls, is controlled by or is under common control with another Bidder; or b) receives or have received any direct or indirect subsidy/ financial stake from another bidder; or c) has the same legal representative as another bidder for purposes of this bid. A Principal can authorize only one representative, and the representative also should not represent or quote on behalf of more than one Principal. However, this shall not debar more than one Authorised distributor from quoting equipment manufactured by an Original Equipment Manufacturer (OEM), in procurements under Proprietary Article Certificate; or d) has a relationship with another bidder, directly or through common third parties, that puts it in a position to have access to information about or influence the bid of another Bidder or influence the decisions of the Procuring Entity regarding this Tender process; or participates in more than one bid in this tender process; or e) Participation in any capacity by a Bidder (including the participation of a Bidder as sub-contractor in another bid or vice-versa) in more than one bid shall result in the disqualification of all bids in which he is a party. However, this does not limit the participation of a non-bidder firm as a sub-contractor in more than one bid; or f) would be providing goods, works, or non-consulting services resulting from or directly related to consulting services that it provided (or were provided by any affiliate that directly or indirectly controls, is controlled by, or is under common control with that firm), for the procurement planning (inter-alia preparation of feasibility/ cost estimates/ Detailed Project Report (DPR), design/ technical specifications, Terms of Reference (ToR)/ Activity Schedule/ schedule of requirements or the Tender Document etc.) of this Tender process; or
g) has a close business or family relationship with a staff of the Procuring Organization who: i) are directly or indirectly involved in the preparation of the Tender document or specifications of the Tender Process, and/or the evaluation of bids; or ii) would be involved in the implementation or supervision of resulting Contract. h) In cases of authorised distributors quoting on behalf of their principal manufacturers, an authorised distributor cannot represent two manufacturers or quote on their behalf in a particular tender enquiry. There can be only one bid from the following: i) The principal manufacturer directly or through an authorised distributor on his behalf; and ii) Authorised distributor on behalf of only one principal.
Parallel Arrangement: Any Order awarded to the successful bidder as a result of this tender, will be on non-exclusive basis. HAL reserves the right of entering into parallel contract(s)/ release parallel Order(s) with any other firms now or here after.
Eligible Goods & Services: a) Country of Origin: The term “origin” used in this clause means the place from where the Services (and incidental Goods, including subcontracted components) are arranged and delivered, or manufactured.
b) Bidder’s country which shares a land border with India: Any bidder from a country, which shares a land border with India will be eligible to bid in this tender only if the bidder is registered with the Competent Authority (i.e. the registration committee constituted by the Department for Promotion of Industry and Internal Trader (DPIIT). However, the bidders from those countries (even if sharing a land border with India) to which the Government of India has extended lines of credit or in which the Government of India is engaged in development projects are not required to register with Competent Authority and will be eligible to bid in this tender. Bidder from a country, which shares a land border with India, for the purpose of this Order means:- i) An entity incorporated, established or registered in such a country; or ii) A subsidiary of an entity incorporated, established or registered in such a country; or iii) An entity substantially controlled through entities incorporated, established or registered in such a country; or iv) An entity whose beneficial owner is situated in such a country; or v) An Indian (or other) agent of such an entity; or vi) A natural person who is a citizen of such a country; or vii) A consortium or joint venture where any member of the consortium or joint venture falls under any of the above. Unless otherwise stipulated in the Contract, country of origin of ‘Services’ and related ‘Goods’ under the contract shall have their origin in India or other countries and must conform to the declaration, made by the Supplier in its bid regarding but not limited to any restrictions on certain countries with land-borders with India.
Non-conformities between Figures and Words: Sometimes, non-conformities/errors are observed in the bids between the quoted prices in figures and in words. This should be taken care of in the following manner: a) If, in the price structure quoted, there is discrepancy between the unit price and total price (which is obtained by multiplying the unit price by the quantity), the unit price shall prevail and the total price corrected accordingly; b) If there is an error in a total corresponding to the addition or subtraction of sub-totals, the sub-totals shall prevail and the total shall be corrected; and c) If there is a discrepancy between words and figures, the amount in words shall prevail. d) Such a discrepancy in an offer should be conveyed to the Bidder asking him to respond by a target date and if the Bidder does not agree to HAL’s observation, the bid is liable to be rejected.
“The Bidder/Vendor confirms and declares to the buyer that the Bidder/Vendor is the original manufacturer or authorized distributor/stockist of original manufacturer or Govt. Sponsored/ Designated Export Agencies (applicable in case of countries where domestic laws do not permit direct export by OEMs) of the stores referred to in this offer/ contract/ Purchase order and has not engaged any individual or firm, whether Indian or Foreign whatsoever, to intercede, facilitate or in any way to recommend to Buyer or any of its functionaries, whether officially or unofficially, to the award of the contract/ purchase order to the Bidder/Vendor; nor has any amount been paid, promised or intended to be paid to any such individual or firm in respect of any such intercession, facilitation or recommendation. The Bidder/Vendor agrees that if it is established at any time to the satisfaction of the Buyer that the present declaration is in any way incorrect or if at a later stage it is discovered by the Buyer that the Bidder/Vendor has engaged any such individual/ firm, and paid or intended to pay any amount, gift, reward, fees, commission or consideration to such person, party, firm or institution, whether before or after the signing of this contract/ purchase order, the Bidder/Vendor will be liable to refund that amount to the Buyer. The Bidder/Vendor will also be debarred from participating in any RFQ/Tender for new projects/program with Buyer for a minimum period of five years. The Buyer will also have a right to consider cancellation of the Contract/ Purchase Order either wholly or in part, without any entitlement or compensation to the Bidder/Vendor who shall in such event be liable to refund all payments made by the Buyer in terms of the Contract/ Purchase order along with interest at the rate of 2% per annum above Secured Overnight Financing Rate (SOFR) (for foreign vendor) and Marginal Cost of Funds-based Lending Rate (MCLR) of (State Bank of India) plus 2% per annum (for Indian vendor). The Buyer will also have the right to recover any such amount from any contracts/ Purchase Order concluded earlier with Buyer.”
Denial Clause: In case of any delay in delivery caused due to default of the vendor and during such delayed period if any increase in statutory duties and/or upward rise in prices due to the Price Variation Clause (PVC) and/or any adverse fluctuation in foreign exchange arises then such additional amount/s is/are to be borne by the Vendor, apart from the payment of agreed Liquidated Damages. Besides HAL reserves its right to get any benefit of a downward revisions in statutory duties, PVC and foreign exchange rate, taken place during such delayed period, effecting the original agreed price.
Tender conditions: a) Any order, resulting from the enquiry, shall be governed by the General Terms and Conditions of Contract of HAL and any party quoting against this enquiry shall be deemed to have read and understood these terms and conditions and to have quoted subject to these terms and conditions (Enclosed). b) When counter terms and conditions have been offered by a tenderer, HAL shall not be deemed to be governed by such terms and conditions unless specific written acceptance thereof has been given by HAL. c) Any terms & conditions which has not been the part of the bid or Purchase Order, if put forward in subsequent correspondence, shall not be considered by HAL. d) Disregard of any instructions, may result in your offer being ignored. e) Canvassing by tender form, including unsolicited letter on tender submitted or post tender corrections shall render their tenderers liable for rejection.
Relaxation of Prior Experience & Prior Turn-over Criteria for Micro & Small Enterprises (MSEs) & Start-ups: Wherever RFQ stipulates qualification/eligibility criteria to be met by bidders such as prior experience and/or prior turn-over, the criterion will be relaxed w.r.t. to all start-ups and MSEs subject to meeting of quality and technical specifications stipulated in the tender. Also vendor shall furnish documentary proof for being MSEs/Start-up as stipulated by the Ministry.
Packing: The Vendor will be held responsible for the stores being sufficiently and properly packed for tropical storage and for transport by rail, road, sea or air so as to ensure their being free from loss or injury on arrival at their destination. The packing and marking of packages shall be done by and at the expense of the vendor. Each package shall contain a Packing Note quoting Purchase Order number and date showing its contents in detail. Each shall be properly marked with Purchase Order No., Consignee’s name & address, packagehandling instructions etc. The package shall have adequate provision for handling during transit.
Receipt & Despatch: The Vendor is responsible for obtaining a clear receipt from the Transport Authorities specifying the goods dispatched. He will not book any consignment on a said to contain’ basis. If he does so, he does it on his own responsibility. HAL will not take responsibility for short deliveries or wrong supply of goods when the same are booked on said to contain’ basis. HAL shall pay for only such stores as are actually received by them in accordance with the contract.
EXTENSION OF TIME : If an extension is desired by the Vendor/Supplier, then Vendor/Supplier shall apply for extension of time to HAL at least 5 days prior to the date of delivery without prejudice to the rights of HAL, then HAL may grant extension of time for any cause which HAL may deem proper and the decision of HAL in this respect to be final and binding and cannot be questioned in any manner whatsoever.
Insolvency: If Supplier enters into liquidation, whether compulsory or voluntary (other than amalgamation or reconstruction with another party taking over all its rights as well as commitments) or becomes insolvent or suffers a receiver of the whole or part of its asset to be appointed, i) Shall forthwith notify the same to HAL and the HAL shall have the right without prejudice to his other rights or remedies to terminate the unexecuted part of this Contract. ii) In such an event, HAL shall become entitled forthwith to get the refund within 30 days of all the advance payments received by Supplier and expenditure incurred by as a part of its obligations under this contract it has not fulfilled. In such an event if applicable, Supplier is liable for return of any materials/items (including drawings, designs etc) to HAL, which are held at his end as a part of the obligations under this contract.
QUALITY ASSURANCE REQUIREMENTS
HINDUSTAN AERONAUTICS LIMITED Aerospace Composites Division (Formerly known as Composite Manufacturing Division) Marathahalli Post Bangalore - 560 037 INDIA
PART -II
TECHNO-COMMERCIAL BID
Tender Ref No.: ACD/IMM/PUR5/MC591-1009 & MC588-1082/RT/2024
Nature of work: : Procurement of Chopped Glass (Strands) and Aerosil Powder
Name of the Vendor/ Firm:
Your Quotation Ref No.:
CHOPPED GLASS (STRANDS) P/N : ECS 6087-43 / OR EC-17-3MM-P316 OR P316-14C ADV 3MM
AEROSIL POWDER AEROSIL- 200
Delivery Schedule : Single lot
Other remarks, if any
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
raw.json
RAW_JSON
Coveringletter00.pdf
TENDER_DOCUMENT • 0.03 MB
Tenderdocument.pdf
TENDER_DOCUMENT • 0.86 MB
PartICommercialTermsAndConditionsforeign.xlsm
TENDER_DOCUMENT • 0.03 MB
PartICommercialTermsAndConditionsIndian.xlsm
TENDER_DOCUMENT • 0.03 MB
PartIITechnoCommercialBid00.xlsm
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .