Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹5.2 L
EMD Value
₹10,400
Closing Date
10 Jun 2022, 11:30 amClosed
EX. ENGINEER (E AND M) M-9
D BLOCK OHT OPP DESU COLONY JANAKPURI NEW DELHI-58
Replacement of defective dismantling joint of various Pump sets installed at CT-2, Dwarka.
2022_DJB_223717_14
N.I.T. No.04(2022-23)/ EE(EnM)M-9 C/o ACE(M)-9
Open Tender
Civil Works
Works
30 days
OFFICE OF THE EX. ENGINEER (E AND M) M-9
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB EMD Ac No. 50448339804
₹10,400
16 Jun 2022
4 Jun 2022
10 Jun 2022
4 Jun 2022
10 Jun 2022
4 Jun 2022
Supply of 450 mm dia MS blind flange.
Supply of nut bolts washer.
Supply of Neoprene packing. (75% Neoprene)
Supply of dismantling joint of 450 mm dia, both sides flanged and bores for nut bolts, made from 10 mm thick rolled out MS sheet, studs, rubber gas kit making of new seats as per required size.
Making, supply of MS taper of size 450 mm with suitable length as per site requirement with MS flange of 450 mm dia with 25 mm thick with 16 nos. holes. MS taper made from 10 mm thick duly making taper of rolling e-machine: welded in all side round length and both end. Flanges duly painted as required. (as per sample).
Supply of 450 mm dia Neoprene Rubber Ring.
Closing of valves of both sides and installing dead flange on suction side to ensure no leakage during execution of work as pumps are installed at positive head. Removing the 450 mm diameter dismantling joint and taper, job i/c cutting / opening of nut bolts on both sides with the help of gas cutter & electric welding set and heavy labour and removing the same to platform with help of chain pulley and heavy labour.
Installation of dismantling joint and taper in the existing system after removing dead flange from suction side, tightening of the same by nut bolts, neoprene packing etc., with help of heavy labour job i/c checking alignment of the pump and motor on the MS base frame with help of plain spirit level gauge. Testing / commissioning on NO load and full load. The work to be completed on tun key process if any work required not mentioned will be completed by contractor as per directions of Engineer in charge
GOGIA BROTHERS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .