Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-Finance | ₹1.1 L | L1 | Accepted-Finance Quoted rate is lowest |
| 2 | L2₹1.7 LRejected-Finance | ₹1.7 L | L2 | Rejected-Finance Quoted rate is on higher side |
| 3 | L3₹1.9 LRejected-Finance | ₹1.9 L | L3 | Rejected-Finance Quoted rate is on higher side |
| 4 | L4₹1.9 LRejected-Finance | ₹1.9 L | L4 | Rejected-Finance Quoted rate is on higher side |
| Sl No | Description | Qty | Unit | Versha and Brothers L2 | Gupta Elect and Engg Works L3 | Meena Elect & Engg. Works L1 | Perfect Power Transformer Associates L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Attending oil leakage of 20 MVA, 132/33 kV Power Transformer-Il, NGEF make, installed at 132 kV Sub- Station Kalwari Basti, from main tank top cover and bottom cover gasket joints, CT/HV/LV turret gasket joints, OLTC cover and associated flange joints, Buchholz relay, sampling valve and radiator flange joints. The leakage-prone areas shall be thoroughly cleaned, degreased and surface prepared by mechanical means and the oil seepage shall be arrested by external application of transformer-grade, oil-resistant, cold-curing polymer/epoxy based sealing compound, suitable for use on oil-filled power transformers, without replacement of existing gaskets and without opening of transformer tank. The sealing compound shall be applied and cured to ensure complete stoppage of oil leakage. The rate shall include cost of all materials, labour, tools & tackles, surface preparation, supervision and all incidental charges required for satisfactory completion of the work. | 11 | RMT | 15,313 ₹1,68,443 | 17,000 ₹1,87,000 | 9,800 ₹1,07,800 Lowest | 17,300 ₹1,90,300 |
Tender Value
₹2.3 L
EMD Value
₹2,500
Closing Date
6 Jul 2026, 1:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF THE SUPERINTENDING ENGINEER, ELECTRICITY TRANSMISSION CIRCLE, 220KV SUB-STATION, GIDAHI, BASTI.
Attending Oil Leakage of 20MVA, 132/33 KV Power Transformer-II at 132KV Sub-Station Kalwari under Electricity Transmission Division-I Basti
2026_UPTCL_1161022_1
E-TENDER NO. 13/ETC(B)/2026-27
Open Tender
Electrical Works
Lump-sum
60 days
132KV SUB-STATION KALWARI
AS PER TENDER
2 documents required · 2 mandatory
₹590
UPSEB Electricity Transmission Divn.
₹2,500
31 Jul 2026
16 Jun 2026
7 Jul 2026
16 Jun 2026
6 Jul 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Attending oil leakage of 20 MVA, 132/33 kV Power Transformer-Il, NGEF make, installed at 132 kV Sub- Station Kalwari Basti, from main tank top cover and bottom cover gasket joints, CT/HV/LV turret gasket joints, OLTC cover and associated flange joints, Buchholz relay, sampling valve and radiator flange joints. The leakage-prone areas shall be thoroughly cleaned, degreased and surface prepared by mechanical means and the oil seepage shall be arrested by external application of transformer-grade, oil-resistant, cold-curing polymer/epoxy based sealing compound, suitable for use on oil-filled power transformers, without replacement of existing gaskets and without opening of transformer tank. The sealing compound shall be applied and cured to ensure complete stoppage of oil leakage. The rate shall include cost of all materials, labour, tools & tackles, surface preparation, supervision and all incidental charges required for satisfactory completion of the work. | 11 | RMT | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
TECHNICAL13.pdf
Tender Documents • 0.97 MB
BOQ_2176075.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].