| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | MS FORWARD BUILDERS E 32/10/KKD L1₹19.3 LAccepted-AOC | L1 | Accepted-AOC ACCEPTED BEING L1 BIDDER | |
| 2 | L2₹20.5 L+₹1.1 L (5.88%)Rejected-AOC | L2 | Rejected-AOC HIGHER BID VALUE | |
| 3 | L3₹21.9 L+₹2.6 L (13.3%)Rejected-AOC | L3 | Rejected-AOC HIGHER BID VALUE | |
| 4 | L4₹23.0 L+₹3.6 L (18.8%)Rejected-AOC | L4 | Rejected-AOC HIGHER BID VALUE | |
| 5 | L5₹24.6 L+₹5.3 L (27.3%)Rejected-AOC ANURAGPUR PO PANAGARH BAZAR DIST BURDWAN WEST BENGAL 713 148 | PANAGARH BAZAR | BURDWAN | WEST BENGAL | 713148 | L5 | Rejected-AOC HIGHER BID VALUE |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
12 Jan 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE PANAGARH
HQ CWE PANAGARH, MES, PO - PANAGARH, DIST - BURDWAN, WB, PIN - 713420
REPAIR / MAINT OF VT PUMPS, SEWAGE INSTALLATION AND ALLIED WORKS AT PH 1 AREA UNDER GE PANAGARH
2022_MES_568513_1
8834/E8
Open Tender
Civil Works
Item Rate
180 days
PANAGARH
Pl refer Tender Documents
7 documents required · 7 mandatory
₹500
GE PANAGARH
₹80,000
Yes
28 Jan 2023
10 Dec 2022
14 Jan 2023
10 Dec 2022
12 Jan 2023
26 Dec 2022
Amount
Taking out rusted/worn out threaded foundation bolt after dismantling old cement concrete foundation base and S&F new anchor bolt with fasteners to bolts of size 20mm dia, 12 inch long with proper cement concrete foundation and making fair finished to match with the existing surfaces, complete all as specified and as directed.
Taking out vertical hollow shaft motor , ( Make : Kirloskar), 3 Phase 50HP/45 HP/40HP, 1440 RPM , 50 Cycle and dismantling the rotor complete and rewinding the stator with proper gauge of super enamelled copper wire including changing of insulating material, varnishing heating properly and reassembling and refitment to its original position with replacement of connection plate including testing, complete all as specified and as directed. Note : (i) Super enameled copper winding wire of existing gauge paid seprately under relevant item. (ii) Rate quoted is deemed to inclusive of transportation charges.
Taking out U/S ratchet plate assembly from VT motor of any size / capacity and S&F ratchet plate assembly complete with ratchet, balls hexagonal bolts etc., complete all as specified and as directed.
Lifting / Lowering of Vertical Turbine Pump Set ( Make : WPIL) Lifting : By disconnecting of all electrical connections to motor and pump , and dismantling the motor from foundation by unscrewing foundation nuts after disconnecting delivery main and kept aside inside pump house , Lifting of VT pump assembly from bore of any depth alongwith column pipe /shaft and connected items are kept inside pump house to check the unserviceability. Lowering : Lowering of pump assembly in bore of any depth alongwith column pipe, shaft and connected items after repair against respective item here-in- after and installation of pump motor in its original foundation, connections the same with top shaft as well as delivery main including electrical connectiion of both end i.e. with starter and motor terminals. Note : (a) Rate quoted against items deemed to be included for lifting /lowering. (b) Chain pulley block will be used according to the load of pump alongwith column pipe and connected items. (c) Any damages to equipment due to negligence during lifting/lowering to be born by contractor at his own risk & cost as per direction of Engr-in-Charge.
Dismantling of turbine pump bowl asembly of any make and capacity and size complete carefully without damaging any parts of the pump and setting aside in pump house for ascertaining the serviceability of existing dismantling parts, with the following works :- (a) Through removing sludging and cleaning of complete bowl assembly items, such as bowl, discharge case , suction case , Impeller , lock collect, bearing /bushes, pump shaft complete etc. after assambling the pump. Checking of all rotary and statutory parts of pump bowl assembly and making free for their satisfactory run.
S&F of the following spare parts of vertical turbine pump of any capacity :- (Note : Make of spares shall be garden reach ship builders & engineers /WPIL)
Packing box bearing brass/bronze suitable for 40 mm shaft as required at site.
Packing box bearing brass/bronze suitable for 25 mm shaft as required at site.
All as per item No 6.01 and 6.02 here-in-before but for packing box gasket
Line shaft 10 feet long both end threaded 40 mm (SS)
Line shaft 10 feet long both end threaded 25 mm (SS)
Line shaft 5 feet long both end threaded 40 mm (SS)
Line shaft 5 feet long both end threaded 25 mm (SS)
Line shaft coupling suitable for 40mm dia shaft (SS)
Line shaft coupling suitable for 25mm dia shaft (SS)
Head shaft ( Top shaft ) , SS not exceeding 40 mm dia and 9 feet long as required at site.
Rubber bush for line shaft bearing retainer suitable for 40 mm dia line shafts and suitable for 6 inch dia column pipe as required at site.
Bearing retainer bronze suitable for 6" dia column pipe and 40 mm dia line shaft as required at site.
Shaft sleeve as suitable for line shaft 40mm dia (SS)
MS Column pipe wall thickness minimum 6.90 mm, 6 inch dia, 10 feet long both end threaded (8 TPI) fitted with coupling at one end.
MS Column pipe wall thickness minimum 6.90 mm, 6 inch dia, 5 feet long both end threaded (8 TPI) fitted with coupling at one end.
Intermediate bowl CI 10 cc/1607 as per existing sample.
MS column coupling suitable for 6 inch dia , column pipe (8TPI) 7.1 mm minimum thickness (internally threaded ) heavy duty.
Intermediate bowl bush rubber 25 mm for any type and size of bowl
Intermediate bowl bush rubber 40 mm for any type and size of bowl
Impellor lock collect carbon steel suitable for upto 40mm dia pump shaft as per existing sample
Suction/discharge case CI suitable for 10CC/1607 or any type of bowl as per existing sample
Suction / discharge case bearing bronze suitable for Item No. 6.21 here-in-before upto 40mm dia pump shaft or as per existing sample.
Impeller close type bronze suitable for 10 CC/1607 upto 40mm dia pump shaft or as per existing smaple
Bowl stud suitbale for 1607 or any type and size of bowl or as per existing sample
Pump shaft SS upto 40mm dia 9 feet long suitable for 10 stage bowl assembly having 1607 bowl or any type of bowl or as per existing sample
Split packing gland suitable for 40 mm head shaft with packing gland stud and nut complete.
Packing box suitable for upto 20000 GPH pump set
Adjusting nut alongwith lock screw for 40 mm dia top shaft.
Adjusting nut alongwith lock screw for 25 mm dia top shaft.
Pump shaft and hollow shaft motor coupling complete suitable for 20000 GPH pump set
Cutting , facing and threading of column pipe upto 150mm dia of length n.exc 10 feet each as required at site , complete all as specified and as directed. Note : Quoted rate are inclusive of transportation, loading / unloading etc. of the item from installation to civil workshop & back.
All as per Item No. 7.00 here-in-before but for line shaft/top shaft any type n.exc 40mm dia & 10 feet long.
Transportation of complete pump shaft, line shaft, head shaft ( top shaft) etc of any VT pump asembly and complete impeller assembly Old/New from pump house to civil workshop for carrying out the under mentiioned work and back to installation for refitment etc :- (a) Proper alingment of pump shaft, line shaft and top shaft. (b) Proper balancing of the impellers
Decoupling of VT hollow shaft motor 45 HP , 3 Phase ( make : Kirloskar), from pump and supply and fixing with new thrust bearing 7220B including greasing after taking out the old U/S thrustbearing form motor, complete all as specified and as directed.
All as per Item No. 10.00 here-in-before but ball bearing 6311, complete all as specified and as directed.
Lifting of submersible pump of any type and capacity alongwith column pipe and 3 core flat cable complete after disconnecting of all electctric and water line connection for the any make of pump & motor, complete all as specified and as directed.
Dismantling of submersible pump bowl assembly of any make and capacity and size complete carefully without damaging any parts of the pump and setting aside in Pump house of ascertaining the serviceability of existing dismantled parts including reassembling complete pump with the following works :- (a) Cleaning of complete pump assembly items dischagre case, impellor, Shaft suction casing bowls disc & bearing etc. (b) Checking of all rotary and statutory parts of pump bowl & stage casing assembly and making free for their satisfactory run. Notes : (i) cost of minor spares is rubber 'O' ring , oil seal etc. is deemed to be included in the item. (ii) Spare parts of submersible pump to be measured in Item No. 14 here-in-after.
S&F of the following spare parts of submersible pump of any capacity, complete all as specified and as directed :-
Suction Cover (Heavy)
Half coupling pump
S.S Shaft (V Stg)
Neck Ring
S.S Sleeve
Top S.S Sleeve
Top Washer
Allen key
Key for shaft
Bowl bush
Coupling bush
Bowl threded
Discharge Outlet
Non return Valve
Impeller
Lowering the submersible pump set alongwith motor, cable, column pipe and other connected accessories including making all electrical connection, commissioning & testing, complete all as specified and as directed.
Dismantling and taking out motor (20 to 40 HP) burnout motor winding from the stator of motor and rewinding with existing gauge, PVC copper cable including connection, commissioning & testing , complete all as specified and as directed. Note : Super enameled copper winding wire of existing gauge paid under relevent item.
Supply and laying in repair's flexible flat PVC insulated PVC sheathed copper couductor stranded submersible cable cores 1100 volt grade 25 Sqmm 3 core including jointing material and connection work, complete all as specified and as directed.
Supply and laying in repair's flexible flat PVC insulated PVC sheathed copper couductor stranded submersible cable cores 1100 volt grade 10 Sqmm 3 core including jointing material and connection work, complete all as specified and as directed.
S&F in repair's round strand steel wire rope dia 12 mm and connected clamp nut bolts fixed, complete all as specified and as directed.
S&F in repair's Fully Automatic Star delta Starter In panel Type MU-G Motor rating AC-3,Duty 415v, 50 Hz 3 Phase to 25 HP,Relay range of 17-33 A as per existing starter, complete all as specified and as directed.
S&F in repair's Fully Automatic Star delta Starter in panel MU-G Motor rating AC-3,Duty 415v, 50 Hz 3 Phase to 30 HP,Relay range of 17-35 A as per existing starter, complete all as specified and as directed.
S&F in repair's Fully Automatic Star delta Starter in existing panel Type MN Motor rating AC-3,Duty 415v, 50 Hz 3 Phase to 50 HP,Relay range of 30-50 A as per existing starter, complete all as specified and as directed.
S&F in repair's Timer Star Delta time of 3 sec-30 sec Voltage range 240-415V AC.Contact arrangement 1 C/O (Star)+1 C/O (Delta) as per existing, complete all as specified and as directed.
S&F in repair's 3 Pole Power Contactor type MNX, AC 3 80A as per existing contactor, complete all as specified and as directed.
S&F in repair's Over Load Relay Direct Mounting Relay range of 30-50A as per existing relay, complete all as specified and as directed.
S&F in repair's On load Change Over switch in existing panel rating of 200A as per existing change over switch, complete all as specified and as directed.
S&F in repair's Start Push Button as per existing, complete all as specified and as directed.
S&F in repair's Stop Push Button as per existing, complete all as specified and as directed.
S&F in repair's Digital voltmeter of 0-500V capacity as per existing, complete all as specified and as directed.
S&F in repair's Digital Ampmeter 96x96 size digital with CT ratio of 0-200 Amp as per existing, complete all as specified and as directed.
Taking out chlorine Dozing machine, transporting to workshop of manufacture or authorized dealer, dismantling the dozing plant, cleaning, disconnecting electric connection of all Job parts taking out all defective parts and fix new parts , reassembling, testing and re-fixing, complete all as specified and as directed. Note : New parts will be measured and paid separately under relevent Items.
Supply only following spare parts of Decrin dozing Pumps (Existing Make : Declibac) :-
Rotor assembly with brackets & tolerance rings part No.PMBRPL2
7 Pump Head (Ferrules 1/4" & duckbill included) Part No.UCPH7FD
7 Pump Tube Part No.MCCP207 (5 PK)
Injection check valve3/8" Part No.MCINJ38 (5 PK)
Weighted suction line strainer 3/8" Part No.ST138
3/8" weighted suction /discharge tubing Part No- MALT002
Checkvalve duckbill only (PK of 5)Part No-MCCVDBO
Connecting nut 3/8"Part No-MANUT00
Rollar Assambly 4 -Pack Part No MC3ASYD
Coil 250 V 50 Hz Part No MP6J222
Supply only following spare parts of Chemical chlorine dozing (Existing Make : Sataya Sai bac) :-
PVC dosing head assembly with suction and delivery with NRV for 25 LPH
PVC NRV set with glass ball for suction and delivery adopter.
PVC adopter for suction and delivery without NRV
PVC stainer washer type heavy duty or Y type stainer for suction.
Teflon gland square type 3 mm
Chemical oil seal with cap
Dosing aligator gear box 25 LPH
Plunger assembly without plunger dosing head 25 LPH
Plunger assembly with PVC dosing head complete 25 LPH
Heavy duty FRP Tank capacity 150 ltr.
Heavy duty PVC NRV for delivery line
S&F Nylon tube ¼ “ dia for chlorine dozing system , complete all as specified and as directed by Engr-in-Charge.
S&F NRV (antisyphon valve) for chlorine dozing system, complete all as specified and as directed by Engr-in-Charge.
Supply and laying of UPVC (SCHD 80 ) concealed pipes 15 mm dia, UV stabilized and having thermal stability for hot & cold water supply all fittings laid in trenches / wall including all fittings, complete all as specified and as directed.
Repair to the motor (230 Volt 50 Hz Power 120 watt) of agitator belongs to chlorine dozing system by dismantling the rotor complete rewinding the stator with proper gauge of super enamelled copper wire including changing of insulating material proper heat varnish, painting replacement of bearing complete & connected with chlorine dozing system, complete all as specified and as directed by Engr-in-Charge.
Supply and lay in repair's flexible flat PVC insulated PVC sheathed copper couductor stranded submersible cable cores 1100 volt grade 16 Sqmm 3 core including jointing material and connection work, complete all as specified and as directed.
Supply, lowering and fixing MS column pipe 150 mm dia (3 mtr long) both side flanged (using MS flange ) heavy grade MS pipe including nuts, bolts, gasket and washers including taking down old unserviceable pipe, complete all as specified and as directed.
Supply only super enameled copper winding wire of existing gauge for above 7.5 HP to 50 HP submerible and vertical motor, complete all as specified and as directed.
Supply, lowering and fixing MS column pipe 100 mm dia (3 mtr long) both side flanged (using MS flange) heavy grade MS pipe including nuts, bolts, gasket and washers including taking down old unserviceable pipe, complete all as specified and as directed.
Supply and fix in repair's 100 mm bore CI Sluice valve PN – 1.6 IS 14846-2000 with Spindle Iron (Heavy duty) Wheel head and both ends flanged and MS nut bolts and washers and pair of rubber/fiber gasket and fixed in position, complete all as specified and as directed.
Supply and fix in repair's 150 mm bore CI Sluice valve PN – 1.6 IS 14846-2000 with Spindle Iron (Heavy duty) Wheel head and both ends flanged and MS nut bolts and washers and pair of rubber/fiber gasket and fixed in position , complete all as specified and as directed.
Supply and fix in repair's 100 mm bore cast iron Non Return Sluice Valve heavy duty with flanged ends, brass spindle any pattern with Brass spindle with GM Check Nut confirming to IS including jointing and jointing material, nuts, bolts, and washer etc , complete all as specified and as directed.
Supply and fix in repair's 150 mm bore cast iron Non Return Sluice Valve heavy duty with flanged ends, brass spindle any pattern with Brass spindle with GM Check Nut confirming to IS including jointing and jointing material, nuts, bolts, and washer etc , complete all as specified and as directed.
Developing of tube well by means of air compressor, for number of hours, until sand free clear potable water is obtained including testing to get maximum yield and discharge, complete all as specified and as directed. Note : Quoted rate is inclusive of DHPP.
Pumping out sewage water from the existing sumps of sewage plant Pump house with the help of Non clogging of pump any kind capacity of pump set not less than 2160 LPM capacity 15HP/20 HP (Minimum) So as to vacate the sumps to enable the repair of the main non clogging submersible pump sets installed in the pump house. Note : (a) Pumping shall be continued till the main pumps installed in sewage sump is cleared for carrying out repair work. (b) Delivery pipe should be connected and the sewage water shall be thrown in the manhole of out side the fencing /wall of central sewage plant towards the main gravity dropping main hole. (c) Pumping of sewage water still be continued till the sumps are fully empty and to keep till the installed non clogging pump are repaired & fully operative. (d) Necessary man power to operate the pump set are deemed to be included in the rate. (e) Rate quoted is deemed to include for Diesel/Engine oil till completion of repair work including testing of sewage pump set. (f) Rate included for transportation of pump set to site/back.
Lifting the non clogging pump set electrically operated by 15HP/20 HP 3 Phase motor incl column pipe, line shaft etc after disconnecting of all elect and water line connection for the any make of pump & motor, complete all as specified and as directed.
Dismantling of non clogging submersible pump of capacity 15HP/20 HP and taking out burnout winding from the stator of motor and rewinding with PVC copper wire as per existing gauge incl connection commissioning & testing, complete all as specified and as directed.
Lowering complete the non clogging pumping set and reflixing the motor carefully including connection and testing, complete all as specified and as directed.
Pumping out sewage water from the existing sumps/tanks of STPs (MBBR technology) with the help of Non clogging of pump any kind capacity of pump set not less than 1500 LPM capacity 10HP/15 HP (Minimum) along with tanking out mud/ solid sludge from the tank complete from soild sepration chamber, aeration chamber and despose whole sludge to faraway areas from public places including cleaning of sump completely. So as to vacate the sumps to enable the repair of the main non clogging pump sets installed in the STPs. Note : (a) Pumping shall be continued till the main pumps installed in STPs sump is cleared for carrying out repair work. (b) Delivery pipe should be connected and the sewage water shall be thrown in the manhole of out side the fencing /wall of STPs towards the main gravity dropping main hole. (c) Pumping of sewage water still be continued till the sumps are fully empty and to keep till the installed non clogging pump are repaired & fully operative. (d) Necessary man power to operate the pump set are deemed to be included in the rate. (e) Rate quoted is deemed to include for Diesel/Engine oil till completion of repair work including testing of sewage pump set. (f) Rate included for transportation of pump set to site/back.
Lifting the non clogging submersible pump set electrically operated by 3.7 HP 3 Phase motor incl column pipe, line shaft etc after disconnecting of all electric and water line connection for any make of pump & motor, complete all as specified and as directed.
Dismantling of non clogging submersible pump of capacity 3.7 HP and taking out burnout winding from the stator of motor and rewinding with PVC copper wire as per existing gauge incl connection commissioning & testing, complete all as specified and as directed.
Lowering complete the non clogging pumping set and reflixing the motor carefully including connection and testing, complete all as specified and as directed.
Dismantling of electric sewage induction motor 3.0 HP, AC, 3 phase, 415 volts from site after disconnecting from pump & electric connection for rewinding, taking out to work shop, opening of motor, taking out old worn-out / burnt-out winding complete, cleaning the slots properly and rewinding with supper enamelled copper wire as per existing gauge and varnishing complete, and reassembling after repairs and replacement of parts as required, refixing the same at site and connecting the electric connection with existing cable etc and including painting of external portion of pump with synthetic enamel paint (1 st quality) of two coat after one coat priming of red oxide primer and testing for satisfatory working of pump, complete all as specified and as directed.
Dismantling Non clogging pump set of centrifugal type (3.0 HP induction motor), AC, 3 phase, 415 volts from site after disconnecting of suction and delivery line, taking out to work shop, dismantling pump set for overhauling, replacing u/s shaft sleeve, gland packing, bush, water seal, applying grease etc reassembling the pump set and refixing back at site on the base plate and connecting existing pipe line with nuts, bolts and new gasket, connecting the electric connection with existing cable etc and including painting of external portion of pump with synthetic enamel paint (1 st quality) of two coat after one coat priming of red oxide primer and testing for satisfatory working of pump, complete all as specified and as directed.
Dismantling of electric induction blower motor 5.0 HP, AC, 3 phase, 415 volts from site after disconnecting from pump & electric connection for rewinding, taking out to work shop, opening of motor, taking out old worn-out / burnt-out winding complete, cleaning the slots properly and rewinding with supper enamelled copper wire as per existing gauge and varnishing complete, and reassembling after repairs and replacement of parts as required, refixing the same at site and connecting the electric connection with existing cable etc and including painting of external portion of pump with synthetic enamel paint (1 st quality) of two coat after one coat priming of red oxide primer and testing for satisfatory working of pump, complete all as specified and as directed.
Material and labour for PCC 1:3:6 type C2 (using 40mm graded aggregate) for foundation etc including necessary frame work, complete all as specified and as directed.
Testing of Sewage Water Samples for BOD and COD testing analysis as mentioned below from STPs viz STP 54 Engrs-01, STP Offrs Accn 1- 01, STP 559 ASC - 01, STP 2 Bihar- 01, complete all as specified and as directed :- (a) BOD (b) COD (c) PH Level (d) Total Suspended Soild(TSS) (e) Outlet Coliform Note : Testing of Sewage Water & Treated sewage Water for total 12 STPs in three month Basis. (i.e Treated Sewage water in Each STPs consider as one Job) (a) Sample of Sewage Water for the above media test are to collected in transparent container/Jar/bottle separately for each test against each STPs. (Hygienically clean bottles). (b) Sample of water to be collected shall be forwarded to Govt Lab / any authorized Lab.
Supply & fix in repair's XLPE insulated armoured heavy duty 1100 V grade LT cable of Size 95 Sqmm 3.5 Corewith standared aluminium conductor cable laid in trenches or passing through pipe or fixed on pole through ducts wall ceiling and terminating with suitable size of cable glands and crimping the leads with aluminium lugs, complete all as specified and as directed.
M&L for taking out & servicing of existing unserviceable Air Blower (Make : Airvak) of capacity 188 Cubic/Hr from Authorised sevice center with taking out of electric cable complete and reconnecting the electric and mechanical connection at existing location after carrying out following repairs all as specified and directed by Engineer-in- charge. Note : Spare part required for replacement shall be measured and paid separetly and cost of taking out of old & fixing new shall be deemed to be including in quoted rate of this item). (a) Replacement of Oil seal (b) Replacement of locking arrangement of pully (c ) Replacement of gland packing with oil and greasing.
Supply only Air filter suitable for above.
Supply only belt as per existing model.
Supply only bearing.
Supply only set of rotor with hub as per existing model.
Supply only set of gear with hub as per existing model.
Repair to the Induction motor (440 Volt 50 Hz) Power of capacity 5 HP for blower in STP plants by dismantling the rotor complete rewinding the stator with proper gauge of super enamelled copper wire including changing of insulating material proper heat varnish, painting replacement of bearing & connected, complete all as directed by Engr-in-Charge.
M&L for finding out defect of STPs panel and taking out burnt interconnection wiring including U/S and serviceable component for re-use including rewiring of panel using existing size of copper cable,ferrule , lugs, insulating materials, nut bolts washer of various sizes refixing serviceable items, complete all specified and as directed.
Supply and fixing in repair's flexible flat PVC insulated PVC sheathed copper couductor stranded submersible cable cores 1100 volt grade 6 Sqmm 3 core including jointing material and connection work, complete all as specified and as directed.
S&F round strand steel wire rope dia 12 mm and connected clamp nut bolts fixed, complete all as per as directed.
S&F Submersible pump Fully Automatic Star delta Starter Type MU-G Motor rating AC-3,Duty 415v, 50 Hz 3 Phase to 25 HP,Relay range of 17-25 A as per existing, complete all as specified and as directed.
S&F Timer Star Delta time of 3 sec-30 sec Voltage range 240-415V AC, Contact arrangement 1 C/O (Star)+1 C/O (Delta) as per existing, complete all as specified and as directed.
S&F 3 Pole Power Contactor type MNX, AC 3 32A as per existing, complete all as specified and as directed.
S&F Over Load Relay Direct Mounting Relay range of 17-25 A as per existing, complete all as specified and as directed.
S&F in repair's Ammeter 96x96 size digital with CT ratio of 0-100 Amp as per existing, complete all as specified and as directed.
S&F in repair's Pressure gauge of blower as per existing, complete all as specified and as directed.
Supply and fixing in repair's Butterfly valve PN-1.0, 50 mm dia use in STPs, complete all as specified and as directed.
Supply and fix Plastic MBBR Filter Bio media for sewage water treatment of size 25x12 mm black in colour, complete all as specified and as directed by Engr-in-Charge.
M&L for DI pipe of 150 mm bore with spigot and socket end rubber gas cate joint(titon) centrifugally cast class k-7 conforming to IS 8329-2000 laid in trenches/ on surface/ over masonry pillar and connection to old or new position, complete all as specified and as directed. Note : Cost of joint included in the qoted rate.
Supply and fix in repair's 50mm bore GI Tubing medium grade in Trenches/ Floor/Pillar and connection in old or news position including fitting like socket /Union/Tee/Reducer Nipple etc., complete all as specified and as directed.
S&F in repair's Direct online starter for induction motor Pump set of rating 5 HP, 415 volts, 50 Hz having with sheet metal encloser and relay range 3 phase 7 to 10 Amps rating panel mounting, complete all as specified and as directed.
Excavating in trenches, not exceeding 1.5 m wide and not exceeding 1.5 m in depth for laying of cables, pipes etc. and getting out including trimming the sides and forming bottom surfaces to required levels in soft/loose soil, complete all as specified and as directed.
Returning, filling in, including spreading, levelling, and well ramming in layer not exceeding 25 cm thick in soft/loose soil, complete all as specified and as directed.
Removing excavated material (soil) to a distance not exceeding 50 m and depositing where directed at a level not exceeding 1.5 m above the starting point, complete all as specified and as directed.
Material and labour for river sand, washed and screened dry for cushioning to under ground cable in trenches below and around under ground cable including spreading and levelling, complete as specified and as directed. Note : Punned thickness 18 cm shall only be considered for payment.
Supply and lay in trenches fly ash bricks, for cable protection all as specified and directed by the Engr-in-Charge.
M&L for parallal boring under roads in conventional method without disturbing the top surface of the road for passing of cable protection pipe etc., complete all as specified and as directed.
S&F Pipes galvanized, 50 mm bore “light grade”, supplied and laid complete including necessary fittings such as tees, bends, elbows, sockets, reducers etc as per site requirement or as specified.
Schedule of Credit
m/s friends construction
ANSH CONSTRUCTION
M/S SAIMON ENGINEERING
UNIQUE ENTERPRISE
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .