Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC ALANGADU SOORAN VIDUTHI POST ALANGUDI TALUK PUDUKKOTTAI DISTRICT 622 301 | PUDUKKOTTAI | TAMIL NADU | 622301 | ₹4.1 L | L1 | Accepted-AOC L1 Accept |
| 2 | L2₹4.5 LRejected-Finance | ₹4.5 L | L2 | Rejected-Finance L2 Reject |
| 3 | L3₹4.5 LRejected-Finance | ₹4.5 L | L3 | Rejected-Finance L3 Reject |
| Sl No | Description | Qty | Unit | D GANESAN L1 | S KANAGARAJ L2 | C. MANICKAM L3 |
|---|---|---|---|---|---|---|
| 1.00Renovation of School Building RCC Roof (Two Class Room) at Fathimanagar PUES in KV.Kottai panchayat. | ||||||
| 2.00 | Dismantling the existing one course of Pressed tile roof finish in cement mortar and cleaned away from the site including cost of all labour charges etc., complete.(Ref.:- PWD SOR 2024-2025, Annex III- Rates of works - Unique Code- W-0038 (Page-28)) | 31.39 | Sqm | 22 ₹690.58 | 25.5 ₹800.45 | 26 ₹816.14 |
| 3.00 | Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers (20% New Tiles) | 31.39 | Sqm | 840 ₹26,367.60 | 1,024.4 ₹32,155.92 | 1,028 ₹32,268.92 |
| 4.00 | Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification. | 115.32 | Sqm | 1,500 ₹1.7 L | 1,610 ₹1.9 L | 1,615 ₹1.9 L |
| 5.00 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers | 11.84 | Sqm | 130 ₹1,539.20 | 155.9 ₹1,845.86 | 159 ₹1,882.56 |
| 6.00 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification | 122.85 | Sqm | 135 ₹16,584.75 | 193.5 ₹23,771.48 | 198 ₹24,324.30 |
| 7.00 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification. | 157.25 | Sqm | 240 ₹37,740 | 249 ₹39,155.25 | 255 ₹40,098.75 |
| 8.00 | Painting old iron work with two finishing coats of synthetic enamel ready mixed paint including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 36.18 | Sqm | 135 ₹4,884.30 | 166.5 ₹6,023.97 | 168 ₹6,078.24 |
| 9.00 | Painting two coats with approved Black Oxide for Black board including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 5.4 | Sqm | 150 ₹810 | 156.1 ₹842.94 | 160 ₹864 |
| 10.00 | Provision for Bala Paint including cost and conveyance of all materials to site including all labour charges for filling etc complete. | 115.68 | Sqm | 740 ₹85,603.20 | 749.5 ₹86,702.16 | 755 ₹87,338.40 |
Tender Value
₹4.6 L
EMD Value
₹4,560
Closing Date
17 Feb 2026, 3:00 pmClosed
Bdo,Thiruvarankulam
Pt.union Office,Thirumayam
Renovation of School Building RCC Roof (Two Class Room) at Fathimanagar PUES in KV.Kottai panchayat
2026_RDTN_654722_1
Tvk/BMS/Work--17
Open Tender
Civil Works
Thiruvarankulam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,560
26 Mar 2026
13 Feb 2026
17 Feb 2026
13 Feb 2026
17 Feb 2026
13 Feb 2026
Renovation of School Building RCC Roof (Two Class Room) at Fathimanagar PUES in KV.Kottai panchayat.
Dismantling the existing one course of Pressed tile roof finish in cement mortar and cleaned away from the site including cost of all labour charges etc., complete.(Ref.:- PWD SOR 2024-2025, Annex III- Rates of works - Unique Code- W-0038 (Page-28))
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Cement Mortar 1:3 (One Cement and Three Crushed stone M.Sand) 12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers (20% New Tiles)
Paving the floor with best approved quality fine polished Kota stone slabs of size 600 x 600 of 18 / 20mm with machine cut edges and matching marble slab not less than 100mm width other than Adanga Marbles as border laid over a cement mortar bed of 20mm thick using cement mortar 1:3 (One cement and three M.Sand) fixing the slabs in true right angles with minimum possible width of joints and pointing the joints with white cement mixed with mathcing colouring pigments and polishing with floor polisher to a high degree of finish etc., The kota stone slabs and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard speicification.
Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two crushed stone M.Sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting old iron work with two finishing coats of synthetic enamel ready mixed paint including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Painting two coats with approved Black Oxide for Black board including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Provision for Bala Paint including cost and conveyance of all materials to site including all labour charges for filling etc complete.
Provision for Chappal Rack
Brick Masonry IN CM 1:5 mix using courntry bricks of size 83/4x41/4x23/4 incluidng cost and conveyance and all labour charges etc., complete - 1 CU.M
PLASTERING WITH CEMENT MORTER 1:5 MIX 12MM THICKNESS including cost of conveyance of all materials to work site and all labour charges etc. complete
Provsion for Cudappa slab For Chappel rock etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 1 & 14 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.76 MB
Tvk_doc--17.pdf
Tender Documents • 0.26 MB
BOQ_785035.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid