| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.1 LAdmitted-Finance | ₹28.1 L | L1 | Admitted-Finance |
| 2 | L2₹44.5 L+₹16.4 L (58.4%)Admitted-Finance | ₹44.5 L+₹16.4 L (58.4%) | L2 | Admitted-Finance |
| 3 | L3₹44.8 L+₹16.7 L (59.4%)Admitted-Finance | ₹44.8 L+₹16.7 L (59.4%) | L3 | Admitted-Finance |
| 4 | L4₹45.9 L+₹17.8 L (63.3%)Admitted-Finance | ₹45.9 L+₹17.8 L (63.3%) | L4 | Admitted-Finance |
| 5 | L5₹46.0 L+₹18.0 L (63.9%)Admitted-Finance | ₹46.0 L+₹18.0 L (63.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | L.K.R.TIWARI CONSTRUCTION L1 | Shri Sant Cosntruction L6 | BHARDWAJ ENTERPRISES L3 | M/S J P ENTERPRISES L7 | S P DEVELOPERS L5 | M/S J J ENTERPRISES L4 | M/S SANDEEP CONSTRUCTION COMPANY L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00NOTE FOR PLUMBING AND SANITARY ITEMS:- (i) Contractor shall deposit entire quantity of plumbing and sanitary wares materials required / covered under subject contract in the custody of Engineer-In-Charge/ Office in charge of unit. (ii) The materials as required shall be issued to contractor by JE/ Engineer-In-Charge on daily basis. (iii) Register shall be maintained for receipt and issue of materials with respective PVS of materials duly signed by Engr-in-Charge and shall be produced to GE during running payments. | ||||||||||
| 2.00 | Demolition of bed concrete and breaking up drain pipes (salt glazed ware AC/RCC) set in cement mortar, dia of pipe 150mm complete all as specified and as directed. | 400 | RM | 20 ₹8,000 Lowest | 20 ₹8,000 Lowest | 150 ₹60,000 | 40 ₹16,000 | 30 ₹12,000 | 350 ₹1,40,000 | 100 ₹40,000 |
| 3.00 | Demolition and breaking up drain pipes (salt glazed ware AC/RCC) set in cement mortar, dia of pipe 200mm complete all as specified and as directed. | 300 | RM | 25 ₹7,500 Lowest | 30 ₹9,000 | 150 ₹45,000 | 50 ₹15,000 | 45 ₹13,500 | 100 ₹30,000 | 150 ₹45,000 |
| 4.00 | Demolition and breaking up drain pipes (salt glazed ware AC/RCC) set in cement mortar, dia of pipe 300mm complete all as specified and as directed. | 50 | RM | 30 ₹1,500 Lowest | 40 ₹2,000 | 250 ₹12,500 | 50 ₹2,500 | 40 ₹2,000 | 400 ₹20,000 | 200 ₹10,000 |
| 5.00 | Excavating in trenches not exc 1.5 m wide and not exc 1.5m in depth for drains in soft/loose soils complete all as specified and as directed . | 120 | Cum | 260 ₹31,200 | 250 ₹30,000 | 600 ₹72,000 | 120 ₹14,400 Lowest | 450 ₹54,000 | 550 ₹66,000 | 700 ₹84,000 |
| 6.00 | Material and labour 150mm for reinforced concrete pipes, Class NP-2, with collars laid in trenches with cement joint and tested including cement concrete 1:4:8 type D2 bed to drain pipes including packing under, and haunching against the sides of pipes of after they are laid and tested complete all as specified and as directed. | 380 | RM | 480 ₹1,82,400 | 500 ₹1,90,000 | 750 ₹2,85,000 | 200 ₹76,000 Lowest | 950 ₹3,61,000 | 650 ₹2,47,000 | 500 ₹1,90,000 |
| 7.00 | Material and labour 200mm for reinforced concrete pipes, Class NP-2, with collars laid in trenches with cement joint and tested including cement concrete 1:4:8 type D2 bed to drain pipes including packing under, and haunching against the sides of pipes of after they are laid and tested complete all as specified and directed. | 280 | RM | 600 ₹1,68,000 | 650 ₹1,82,000 | 900 ₹2,52,000 | 20 ₹5,600 Lowest | 650 ₹1,82,000 | 750 ₹2,10,000 | 600 ₹1,68,000 |
| 8.00 | Material and labour 300mm for reinforced concrete pipes, Class NP-2, with collars laid in trenches with cement joint and tested including cement concrete 1:4:8 type D2 bed to drain pipes including packing under, and haunching against the sides of pipes of after they are laid and tested complete all as specified and as directed. | 38 | RM | 800 ₹30,400 | 900 ₹34,200 | 1,000 ₹38,000 | 200 ₹7,600 Lowest | 2,000 ₹76,000 | 900 ₹34,200 | 800 ₹30,400 |
| 9.00 | Material and labour for plain cement concrete 1:2:4 Type B-1 using 20 mm graded aggregate as in benching /kerbing or surface channel etc complete all as specified and as directed. | 5 | Cum | 4,000 ₹20,000 | 5,000 ₹25,000 | 6,000 ₹30,000 | 2,500 ₹12,500 | 7,500 ₹37,500 | 9,000 ₹45,000 | 500 ₹2,500 Lowest |
| 10.00 | Material and labour for plain cement concrete 1:3:6 Type C-1 using 20 mm graded aggregate as in Coping including form work etc complete all as specified and as directed. | 3 | Cum | 4,000 ₹12,000 | 6,000 ₹18,000 | 5,000 ₹15,000 | 2,500 ₹7,500 | 6,760 ₹20,280 | 12,000 ₹36,000 | 1,500 ₹4,500 Lowest |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
27 Aug 2026, 6:00 pmClosed
GE CENTRAL KHADKI
GE CENTRAL KHADKI RANGE HILLS ROAD PUNE-411003
REPAIR/REPLACEMENT AND CLEANING OF SEWAGE LINE, MANHOLE, SEPTIC TANK, PATHWAY, DRAINAGE SYSTEM AND ALLIED CONNECTED WORK IN 512 ABWS, KKD AND MW LINE AREA OF AGE B/R-I UNDER GE (CENTRAL) KHADKI.
2026_MES_781489_1
8413/E8 OF 2026-2027
Open Tender
Civil Works
Item Rate
270 days
512 ABWS KKD AND MW LINE area
Class D Category a(ii)
7 documents required · 7 mandatory
₹500
GE CENTRAL KHADKI
₹98,000
Yes
15 Sept 2026
29 Jul 2026
29 Aug 2026
29 Jul 2026
27 Aug 2026
20 Aug 2026
29 Jul 2026 - 5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Demolition of bed concrete and breaking up drain pipes (salt glazed ware AC/RCC) set in cement mortar, dia of pipe 150mm complete all as specified and as directed. | 400 | RM | - | - |
| 3 | Demolition and breaking up drain pipes (salt glazed ware AC/RCC) set in cement mortar, dia of pipe 200mm complete all as specified and as directed. | 300 | RM | - | - |
| 4 | Demolition and breaking up drain pipes (salt glazed ware AC/RCC) set in cement mortar, dia of pipe 300mm complete all as specified and as directed. | 50 | RM | - | - |
| 5 | Excavating in trenches not exc 1.5 m wide and not exc 1.5m in depth for drains in soft/loose soils complete all as specified and as directed . | 120 | Cum | - | - |
| 6 | Material and labour 150mm for reinforced concrete pipes, Class NP-2, with collars laid in trenches with cement joint and tested including cement concrete 1:4:8 type D2 bed to drain pipes including packing under, and haunching against the sides of pipes of after they are laid and tested complete all as specified and as directed. | 380 | RM | - | - |
| 7 | Material and labour 200mm for reinforced concrete pipes, Class NP-2, with collars laid in trenches with cement joint and tested including cement concrete 1:4:8 type D2 bed to drain pipes including packing under, and haunching against the sides of pipes of after they are laid and tested complete all as specified and directed. | 280 | RM | - | - |
| 8 | Material and labour 300mm for reinforced concrete pipes, Class NP-2, with collars laid in trenches with cement joint and tested including cement concrete 1:4:8 type D2 bed to drain pipes including packing under, and haunching against the sides of pipes of after they are laid and tested complete all as specified and as directed. | 38 | RM | - | - |
| 9 | Material and labour for plain cement concrete 1:2:4 Type B-1 using 20 mm graded aggregate as in benching /kerbing or surface channel etc complete all as specified and as directed. | 5 | Cum | - | - |
| 10 | Material and labour for plain cement concrete 1:3:6 Type C-1 using 20 mm graded aggregate as in Coping including form work etc complete all as specified and as directed. | 3 | Cum | - | - |
| 11 | Demolition of precast concrete block/brick work walling built in cement mortar complete all as specified and as directed. | 145 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.12 MB
BOQ_875473.xls
BOQ • 0.34 MB
8413Tender.pdf
Tender Documents • 8.56 MB
8413CORRIGENDUM1.pdf
PDF • 4.45 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .