Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.0 LAccepted-AOC NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | L1 | Accepted-AOC Lowest tenderer | |
| 2 | L2₹14.3 L+₹4.3 L (42.6%)Rejected-Finance NO S 7 2ND CROSS 2ND MAIN KEB LAYOUT SANJAYANAGAR BANGALORE 560094 | BENGALURU URBAN | KARNATAKA | 560094 | L2 | Rejected-Finance Admitted for reasonability scrutiny | |
| 3 | L3₹15.2 L+₹5.2 L (51.9%)Rejected-Finance 606 80 FEET ROAD 7TH BLOCK 2ND PHASE BANASHANKARI 3RD STAGE BANGALORE 560 085 | BENGALURU URBAN | KARNATAKA | 560085 | L3 | Rejected-Finance Other than lowest tenderer |
Tender Value
₹15 L
EMD Value
₹30,000
Closing Date
30 Oct 2019, 6:00 pmClosed
GARRISON ENGINEER (SOUTH) BANGALORE
GARRISON ENGINEER (SOUTH) BANGALORE NO 1, ULSOOR ROAD BANGALORE-560 042
AS PER BOQ AND TENDER DOCUMENT
2019_MES_286129_1
GE(s)/B/8298/E8
Open Tender
Civil Works
Item Rate
180 days
BANGALORE
AS PER TENDER DOCUMENT
6 documents required · 6 mandatory
₹500
GARRISON ENGINEER (SOUTH) BANGALORE
₹30,000
Yes
17 Apr 2020
30 Sept 2019
31 Oct 2019
30 Sept 2019
30 Oct 2019
20 Oct 2019
30 Sept 2019 - 7 Oct 2019
Amount
M&L for maintanence and servicing of 380 KVA Diesel genarator sets installeed at 515 ABW No.1 Make : cummins Type : KTA 1150 G including connected Alternator and carryng out routine 'A' check of the engine and servicing works as listed below for smooth functioning all as per manufactures instructions and as directed. (a) To check (every 50hrs/ 1 month wichever is earlier) (i) Lubrication greasing to all parts (ii) Check all engine level (b) Fuel system : Drain sedment from fuel tanks. (c) Air System: every 50hrs/ 1 month wichever is earlier (i) Clean pre Cleaner dustpan weekly (ii) Check Air cleaner restriction clean/ change cleaner element if required. (d) COOLING SYSTEM: Check coolent level OTHER MAINTENANCE:- (i) Drainer tank (ii) Check and correct leaks (iii) Drain fuel filter, Water separator. (iv) Check belts & adjust if required. Note: Engine oil/ Radiator coolent oil top up will be measured and paid separately.
All as per item No.1.00 above, but 250 KVA installed at 515 ABW (Make: Kirloskar oil Engines Ltd, Type 6SL 8800 TA)
All as per item No.1.00 above, but 275 KVA installed at FMCC Pump house (Make: Kirloskar oil Engines Ltd, Type 6KL TA)
All as per item No.1.00 above, but 82.5 KVA installed at Supply Depot / EDP/ CMP Pump House.[Make : Kirloskar Oil Engines Ltd, Type : 4R1040 T/RB66 T]
All as per item No.1.00 above, but 62.5 KVA installed at Harris Barrack Pump House/ CMP Centre. [Make :Mahindra & Mahindra/ Ruston]
All as per item No.1.00 above, but 40 KVA installed at FMCC Pump House & Kut lines. [Make : Kirloskar Oil Engines Ltd,]
All as per item No.1.00 above, but 35 KVA installed at DAD Pump House.[Make : Kirloskar Oil Engines Ltd, Type :RB 44]
All as per item No.1.00 above but 30 KVA DG set installed at CMP pump house .[Make :Mahindra & Mahindra]
All as per item No.1.00 above, but 20/25 KVA DG set installed at Signal centre, K&K HQ & Thimaiah Enclave Pump house. [Make : Kirloskar Oil Engines Ltd, Type :HA 294/394]
All as per item No.1.00 above, but 15 KVA DG set installed at 559 pump house. [Make :Mahindra & Mahindra]
All as per item No.1.00 above, but 7.5 KVA DG set installed at CMP/ DAD Sewage Plant & GE Office. [Make : Kirloskar Oil Engines Ltd, Type :DM 10]
All as per item No.1.00 above, but 5.5 KVA petrol DG set installed at IB. [Make : HONDA, Type : PETROL]
All as per item No.1.00 above, but 2.2 KVA DG set petrol start kerosuine run installed at SSB pump house . [Make : HONDA, Type : PETROL]
All as per item No.1.00 above, but 15 KVA DG set installed at PRTC Toranagallu [Make :Mahindra & Mahindra]
All as per item No 16.00 above, but but 250 KVA installed at 515 ABW (AMF)
All as per item No 16.00 above, but 275 KVA installed at FMCC Pump House.
All as per item No 16.00 above, but 125 KVA, installed at Signal centre(AMF), SSB & SUK Testing hall.
All as per item No 16.00 above, but 82.5 KVA installed at Supply Depot, EDP & CMP Pump House.
All as per item No 16.00 above, but 62.5 KVA installed at Harris Barrack Pump House.
All as per item No 16.00 above, but 40 KVA installed at FMCC and Kut lines Pump House.
All as per item No 16.00 above, but 35 KVA installed at DAD Pump House.
All as per item No 16.00 above, but 30 KVA DG set installed at CMP pump house .
All as per item No 16.00 above but 20/25 KVA DG set installed at Signal centre, K&K HQ & Thimaiah Enclave Pump house.
All as per item No 16.00 above, but 15 KVA DG set installed at 559 pump house.
All as per item No 16.00 above, but 7.5 KVA DG set installed at CMP & DAD Sewage Plant.
All as per item No 16.00 above, but 5.5 KVA petrol DG set installed at IB .
All as per item No 16.00 above, but 2.2 KVA DG set petrol start kerosine run installed at SSB pump house .
M&L for carring out following periodical maintanence on 380 KVA Diesel genarator sets installeed at 515 ABW (a) To check (every 250 Hrs/ Every 6 month (i) Repeat 'A' Lubrication (ii) Changing Engine Oil (iii) Record oil pressure. (b) Fuel system : (i) Check Hydrulic Governor oil. (ii) Check throtle linkage. (iii) Lubricant Bail joints of the throtle linkage of Hydrulic Governor. (iv) Change of Fuel filter. (v) Clean fuel tank breather. (c) Air System: (i) Clean / Change crancase Breather. (ii) Check Air Pipings. (d) COOLING SYSTEM: (i) Check coolent in radiator.(ii) Add coolant concentrate if required. (iii) Check heat exanger zinc plugs. Note: Coolant oil , Engine oil and spare parts which necesitated to be replaced will be measured and paid separatly.
All as per item No 30.00 above, but 250 KVA installed at 515 ABW (AMF)
All as per item No 30.00 above, but 275 KVA installed at FMCC Pump House.
All as per item No 30.00 above, but 125 KVA installed at Signal centre.(AMF), SSB & SUK Testing Hall
All as per item No 30.00 above, but 82.5 KVA installed at Supply Depot, EDP & CMP Pump House.
All as per item No 30.00 above, but 62.5 KVA installed at Harris Barrack Pump House.
All as per item No 30.00 above, but 40 KVA installed at FMCC Pump House & Kut Lines.
All as per item No 30.00 above, but 35 KVA installed at DAD Pump House.
All as per item No 30.00 above, but 30 KVA DG set installed at CMP pump house.
All as per item No 30.00 above, but 20/ 25 KVA DG set installed at Signal centre, K&K HQ & Thimaiah Enclave Pump house Parade ground.
All as per item No 30.00 above, but 15 KVA DG set installed at 559 pump house.
All as per item No 30.00 above, but 7.5 KVA DG set installed at CMP/ DAD Sewage Plant.
All as per item No 30.00 above, but 5.5 KVA petrol DG set installed at IB.
All as per item No 30.00 above, but 2.2 KVA DG set, petrol start kerosuine run installed at SSB pump house .
All as per item No 30.00 above, but 15 KVA DG set installed at PRTC Thoranagallu .
M&L for servicing of Self Starter assembly by disconnecting from engine and dismantling the same, cleaning all accessories, replace the wornout parts like :- brushes, bushes , contact plates, jumping leads and seals, revarnishing the field coil, armature and reassembling the same, refitting with engine and testing for 380 KVA DG set installed at 515 ABW [Make - CUMMINS , Type - KTA 1150] [Delco remy 50MT -24 volt] all as directed.
All as per item No.45.00 above, but 250 KVA installed at 515 ABW (Make: Kirloskar oil Engines Ltd, Type 6SL 8800 TA) Autolek-24 Volt
All as per item No.45.00 above, but 82.5 KVA installed at Supply Depot, EDP & CMP Pump House. [Make : Kirloskar Oil Engines Ltd, Type : 4R1040 T/RB66 T] ( Lucas TVS 3SM114-12volts)
S & F in replacement moulded PVC body for low maintanence lead acid battery 12 volts 180 AH all as specified and as directed. Make: Exide.
S & F in replacement moulded PVC body for low maintanence lead acid battery 12 volts 130 AH all as specified and as directed Make: Exide.
Supply and filling/ topup engine oil SAE 15 W - 40 [CH grade).all as specified and as directed. Make : VOLVOLINE CUMMINS
Supply and filling/ topup Radiator coolant all as specified and as directed. Make : VOLVOLINE CUMMINS
M&L for servicing of External Battery Charger, 12 volt assembly [Make - Naren] by disconnecting the AC supply and taken to service centre, after dismantling the same, cleaning all accessories, including replacing the burnt parts like diodes, recifiers and DC & AC fuse units and reassambling the same, refitting the engine and testing all as directed .
S & F battery charger 24 volt DC on existing control panel including necessary connections, fixing the volt meter, ammeter and connecting to battery unit, including taking out existing defective battery charger etc complete all as directed.
S & F battery charger 12 volt DC on existing control panel including necessary connections, fixing the volt meter, ammeter and connecting to battery unit, including taking out existing defective battery charger etc complete all as directed.
M & L for overhauling of radiator assembly of DG set 380 KVA by disconnecting and removing from eingine, dismantling the top & bottom chambers, descalling the sediments and scales, corrosion, etc by means of acid cleanig and high pressure water washing, air cleaning, re-assembling the same with new gaskets, including arresting leakage if any and fixing to the engine with new hoses ,clips as required. Note: The rate quoted shall be deemed to be included necessary charge for repacing the defective spare parts, but cost of spare parts will be measured and paid saperatly as listed here-in-after.
All as per item No 55.00 above, but for 275/250 KVA .
All as per item No 55.00 above, but for125 KVA .
All as per item No 55.00 above, for but 82.5 KVA .
All as per item No 55.00 above, but for 45/ 40/ 35/ 30 KVA .
All as per item No 55.00 above, but for 15 KVA.
Supply only Air filter Element as per existing make for 380 KVA capacities of DG Set complete all as directed.
All as per item No 61.00 above, but for 275/250 KVA.
All as per item No 61.00 above, but for 125 KVA.
All as per item No 61.00 above, but for 82.5 KVA .
All as per item No 61.00 above, but for 45/ 40/ 35/ 30 KVA .
All as per item No 61.00 above, but for 15 KVA .
Supply only fan belts as per exisiting make for 380 KVA capacities of DG Sets complete all as directed.
All as per item No 67.00 above, but 275/250 KVA .
All as per item No 67.00 above, but 125 KVA .
All as per item No 67.00 above, but 82.5/63 KVA .
All as per item No 67.00 above, but 45/ 40/ 35/ 30 KVA .
All as per item No 67.00 above, but 15 KVA .
Supply only Solenoid switch, 24 Volts, Suitable for 380 KVA DG SET complete all as directed.
Supply only Engine control Unit [ IN-NT-PLUS] 24 Volts, Suitable for 275/250 KVA DG SET complete all as directed.
Supply and fix in replacement Tacho drive meter including cable assembly 1.5 mtr length [0.200]RPM complete all as directed. Make : KOEL/VDO
Supply and fix in replacement battery terminals, brass complete all as directed.
Supply and fix in replacement Automatic Voltage Regulator for alternator 380/275/250 KVA complete all as directed.
M&L for opening the coupling, dismantling the alternator carefully removing the flywheel, dismantling the unserviceable starting gear wheel and supply and fix new staring gear wheel, fixing back the alternator and properly coupled back for 82.5 KVA DG set all as directed.
M&L for providing aluminium clading to the exaust pipe and silencer of the DG sets by engaging highly skilled technicians after removing the existing totally worn out asbestos rope (wherever available) and prepairing the surface, and including 50mm thick high quality glass wool thermal insulator packing which is bidinding tightly with chicken wiremesh of appropriate size & pattern to the exhaust pipe upto 4" dia pipe and neatly finishing, sealing with 24 SWG aluminium sheet all as directed.
M&L for repairing and servicing of 380KVA PT pump assembly and injectors by replacing the unserviceable parts like centre shaft, loading spring, relief valve-2 Nos bearings, governor barrels & plunger-1 Set O-ring kits, gasket kit, injector plunger & barrel -6Nos, ball check -6Nos and calibration and phasing of injectors and FIP in test bench and re-assembling etc complete all as directed.
All as per item No 80.00 above but for 275/250 KVA .
All as per item No 80.00 above but for 125 KVA .
All as per item No 80.00 above but for 82.5 KVA .
All as per item No 80.00 above but for 40 KVA .
All as per item No 80.00 above but for 20 KVA .
M&L for opening the coupling, dismantling the alternator carefully removing the flywheel, dismantling the unserviceable starting gear wheel, supply and fix new starting gear wheel, fixing back the alternator and properly coupled back for 125KVA DG set of make Kirloskar Bliss at SSB all as directed.
UNIVERSAL ENGINEERING
Lucky Enterprises
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .