Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 CrAccepted-AOC | ₹5.7 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹6.0 CrRejected-AOC | ₹6.0 Cr | 2 | Rejected-AOC L2 |
| 3 | 3₹6.7 CrRejected-AOC NAN | ₹6.7 Cr | 3 | Rejected-AOC L3 |
| 4 | Rejected-Technical C 65 RDC RAJNAGAR DISTRICT GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | - | - | Rejected-Technical ID Form No.-111 not uploaded so not Qualify with elegibility criteria |
| Sl No | Description | Qty | Unit | SAKSHAM BUILDERS L1 | M/s Bajrang Construction & Suppliars L3 | M/s Kaiser Construction Engineers and Contractor L2 |
|---|---|---|---|---|---|---|
| 1.01 | Cutting heavy under growth & bushes up to 7.5 cm dia i/c removal of roots with collection & removal complete. | 31,970.88 | M2 | 1 ₹31,970.88 | 4 ₹1.3 L | 4 ₹1.3 L |
| 1.02 | Earth work in filling in Mar kabar Ranker and kanker mixed soil including lead up to 30.0 m and lift upto 1.50 m with manual compaction and dressing. | 11,949.2 | M³ | 135 ₹16.1 L | 100 ₹11.9 L | 200 ₹23.9 L |
| 1.03 | Earth work in cutting embankment including lift up to 1.5m lead up to 30m ramming and dressing by manual labour including all type of soil, including cost of all material, labour and T&P etc. | 17,449.87 | M³ | 120 ₹20.9 L | 50 ₹8.7 L | 60 ₹10.5 L |
| 1.04 | Preparation of subgrade , including cost of , labour and T&P etc | 56,909 | M2 | 10 ₹5.7 L | 14.1 ₹8.0 L | 10 ₹5.7 L |
| 1.05 | Centering and shuttering for CC work including cost of all material labour and T&P etc.complete. | 13,494.36 | M2 | 195 ₹26.3 L | 300 ₹40.5 L | 250 ₹33.7 L |
| 1.06 | Providing and laying Cement concrete (1:2:4) in sleepers with cement , coarse sand , and 20mm nominal size stone grit including cost of all material, labour and T&P etc.complete. | 2,896.62 | M³ | 3,250 ₹94.1 L | 6,000 ₹1.7 Cr | 5,500 ₹1.6 Cr |
| 1.07 | Providing and laying 50 mm thick fine sand (Not less than 1.25 F.M. ) in filter including cost of all material, labour and T&P etc. complete. | 56,950 | M2 | 80 ₹45.6 L | 130 ₹74.0 L | 90 ₹51.3 L |
| 1.08 | Supplying and laying 200 micron L.D.P.E. film including cost of all material, labour and T&P etc. complete. | 53,995 | M2 | 50 ₹27.0 L | 65 ₹35.1 L | 60 ₹32.4 L |
| 1.09 | Painting on Top of sleeper with (Bitumen vg-10) grade @ 1.20 kg /sqm including cost of all material, labour and T&P etc. complete. | 10,635.2 | M2 | 20 ₹2.1 L | 71.8 ₹7.6 L | 55 ₹5.8 L |
| 1.10 | Providing and laying 60mm thick C.C. , (1:2:4) in Lining with. centering and shuttering, including cost of all material ,labour and T&P etc. complete. | 3,178.56 | M³ | 9,000 ₹2.9 Cr | 8,070 ₹2.6 Cr | 7,300 ₹2.3 Cr |
Tender Value
₹7.5 Cr
EMD Value
₹15.1 L
Closing Date
16 Jan 2026, 3:00 pmClosed
Superintending Engineer, Irrigation work VIth Circ
Office of the Superintending Engineer, IVth Circle Irrigation Works, Jhansi
LOT-03 Restoration and Demarcation of canal land from Km 0.000 to 9.792 of the Kailor Minor in District Jalaun.
2025_UPIDC_1102631_3
03/SE-IV/2025-26
Open Tender
Civil Works
540 days
JALAUN
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,000
₹15.1 L
18 Mar 2026
3 Jan 2026
16 Jan 2026
3 Jan 2026
16 Jan 2026
3 Jan 2026
Cutting heavy under growth & bushes up to 7.5 cm dia i/c removal of roots with collection & removal complete.
Earth work in filling in Mar kabar Ranker and kanker mixed soil including lead up to 30.0 m and lift upto 1.50 m with manual compaction and dressing.
Earth work in cutting embankment including lift up to 1.5m lead up to 30m ramming and dressing by manual labour including all type of soil, including cost of all material, labour and T&P etc.
Preparation of subgrade , including cost of , labour and T&P etc
Centering and shuttering for CC work including cost of all material labour and T&P etc.complete.
Providing and laying Cement concrete (1:2:4) in sleepers with cement , coarse sand , and 20mm nominal size stone grit including cost of all material, labour and T&P etc.complete.
Providing and laying 50 mm thick fine sand (Not less than 1.25 F.M. ) in filter including cost of all material, labour and T&P etc. complete.
Supplying and laying 200 micron L.D.P.E. film including cost of all material, labour and T&P etc. complete.
Painting on Top of sleeper with (Bitumen vg-10) grade @ 1.20 kg /sqm including cost of all material, labour and T&P etc. complete.
Providing and laying 60mm thick C.C. , (1:2:4) in Lining with. centering and shuttering, including cost of all material ,labour and T&P etc. complete.
Making contraction groove in lined concrete surface as per drawing ,including painting with sealing primer and joint groove filling with sealing compound, including cost of all material ,labour and T&P etc. complete.
Making construction joint in lined concrete surface as per drawing, including painting with sealing primer and joint filling with sealing compound, including cost of all material ,labour and T&P etc. complete.
Dismantaling of old Brick work & R.B.Slab including cost of material, labour and T&P etc.
Earth work in Mar, Ranker & Kankar mixed soil for excavation foundation i/c all cost of labour, materials and T&P etc.
C.C. 1 : 3: 6 with Stone Grit (20-40 mm) size i/c all cost of labour, materials and T&P etc.
Providing and Laying C.C.1:1.5:3 in weirng coat course FM not less than 2.20 stone Grit (10-20) size in i/c all cost of labour and T&P etc.
Brick work in 1:4 cement, mortar including all cost of material, labour and T&P etc.
Deep struck Pointing 1:2 Cement, Mortar including cost of material, labour and T&P etc.
Centering & shuttering for RCC work including all cost of material labour and T&P etc.
Steel reinforcement of for RCC work i/c cutting and binding and placing in position and i/c all cost of labour material and T&P etc
RCC 1:1.5:3 in slab and bed block & FM not less than 2.20 i/c mechnical vibration compection material stone grit (10-20) mm size i/c all cost of labour and T&P etc
Painting of Parapet Colour washing two coats i/c cost of matarials. As per site in-charge
Supplying, laying, jointing, testing and commissioning the HDPE pipe in standard length conforming to IS 4984, IS 7634, etc. including cost of transportation, freight charge inspection charge loading unloading charge convience to departmental store/ site and stocking the same sand cusion of 15cm thick all around the pipe
Laying and fixing Hume pipe 15cm in position and allignement including excavation and back filling excluding cost of material SOR item No. 13.42 (b)
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.02 MB
BOQ_2033116.xls
BOQ • 0.35 MB
03SEIVNIT2025-6.pdf
Tender Documents • 2.77 MB
Download all tender documents and submit your bid