| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹5.7 CrAccepted-AOC | ₹5.7 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹6.0 Cr+₹29.5 L (5.18%)Rejected-AOC | ₹6.0 Cr+₹29.5 L (5.18%) | 2 | Rejected-AOC L2 |
| 3 | 3₹6.7 Cr+₹96.7 L (17.0%)Rejected-AOC NAN | ₹6.7 Cr+₹96.7 L (17.0%) | 3 | Rejected-AOC L3 |
| 4 | Rejected-Technical C 65 RDC RAJNAGAR DISTRICT GHAZIABAD | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | - | - | Rejected-Technical ID Form No.-111 not uploaded so not Qualify with elegibility criteria |
| Sl No | Description | Qty | Unit | SAKSHAM BUILDERS L1 | M/s Bajrang Construction & Suppliars L3 | M/s Kaiser Construction Engineers and Contractor L2 |
|---|---|---|---|---|---|---|
| 1.01 | Cutting heavy under growth & bushes up to 7.5 cm dia i/c removal of roots with collection & removal complete. | 31,970.88 | M2 | 1 ₹31,970.88 Lowest | 4 ₹1,27,883.52 | 4 ₹1,27,883.52 |
| 1.02 | Earth work in filling in Mar kabar Ranker and kanker mixed soil including lead up to 30.0 m and lift upto 1.50 m with manual compaction and dressing. | 11,949.2 | M³ | 135 ₹16,13,142 | 100 ₹11,94,920 Lowest | 200 ₹23,89,840 |
| 1.03 | Earth work in cutting embankment including lift up to 1.5m lead up to 30m ramming and dressing by manual labour including all type of soil, including cost of all material, labour and T&P etc. | 17,449.87 | M³ | 120 ₹20,93,984.4 | 50 ₹8,72,493.5 Lowest | 60 ₹10,46,992.2 |
| 1.04 | Preparation of subgrade , including cost of , labour and T&P etc | 56,909 | M2 | 10 ₹5,69,090 Lowest | 14.1 ₹8,02,416.9 | 10 ₹5,69,090 Lowest |
| 1.05 | Centering and shuttering for CC work including cost of all material labour and T&P etc.complete. | 13,494.36 | M2 | 195 ₹26,31,400.2 Lowest | 300 ₹40,48,308 | 250 ₹33,73,590 |
| 1.06 | Providing and laying Cement concrete (1:2:4) in sleepers with cement , coarse sand , and 20mm nominal size stone grit including cost of all material, labour and T&P etc.complete. | 2,896.62 | M³ | 3,250 ₹94,14,015 Lowest | 6,000 ₹1,73,79,720 | 5,500 ₹1,59,31,410 |
| 1.07 | Providing and laying 50 mm thick fine sand (Not less than 1.25 F.M. ) in filter including cost of all material, labour and T&P etc. complete. | 56,950 | M2 | 80 ₹45,56,000 Lowest | 130 ₹74,03,500 | 90 ₹51,25,500 |
| 1.08 | Supplying and laying 200 micron L.D.P.E. film including cost of all material, labour and T&P etc. complete. | 53,995 | M2 | 50 ₹26,99,750 Lowest | 65 ₹35,09,675 | 60 ₹32,39,700 |
| 1.09 | Painting on Top of sleeper with (Bitumen vg-10) grade @ 1.20 kg /sqm including cost of all material, labour and T&P etc. complete. | 10,635.2 | M2 | 20 ₹2,12,704 Lowest | 71.8 ₹7,63,607.36 | 55 ₹5,84,936 |
| 1.10 | Providing and laying 60mm thick C.C. , (1:2:4) in Lining with. centering and shuttering, including cost of all material ,labour and T&P etc. complete. | 3,178.56 | M³ | 9,000 ₹2,86,07,040 | 8,070 ₹2,56,50,979.2 | 7,300 ₹2,32,03,488 Lowest |
Tender Value
₹7.5 Cr
EMD Value
₹15.1 L
Closing Date
16 Jan 2026, 3:00 pmClosed
Superintending Engineer, Irrigation work VIth Circ
Office of the Superintending Engineer, IVth Circle Irrigation Works, Jhansi
LOT-03 Restoration and Demarcation of canal land from Km 0.000 to 9.792 of the Kailor Minor in District Jalaun.
2025_UPIDC_1102631_3
03/SE-IV/2025-26
Open Tender
Civil Works
Item Rate
540 days
JALAUN
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,000
₹15.1 L
18 Mar 2026
3 Jan 2026
16 Jan 2026
3 Jan 2026
16 Jan 2026
3 Jan 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Cutting heavy under growth & bushes up to 7.5 cm dia i/c removal of roots with collection & removal complete. | 31,970.88 | M2 | 5.5 | ₹1,75,839.84 |
| 1.02 | Earth work in filling in Mar kabar Ranker and kanker mixed soil including lead up to 30.0 m and lift upto 1.50 m with manual compaction and dressing. | 11,949.2 | M³ | 278.1 | ₹33,23,072.52 |
| 1.03 | Earth work in cutting embankment including lift up to 1.5m lead up to 30m ramming and dressing by manual labour including all type of soil, including cost of all material, labour and T&P etc. | 17,449.87 | M³ | 71.2 | ₹12,42,430.74 |
| 1.04 | Preparation of subgrade , including cost of , labour and T&P etc | 56,909 | M2 | 14.1 | ₹8,02,416.9 |
| 1.05 | Centering and shuttering for CC work including cost of all material labour and T&P etc.complete. | 13,494.36 | M2 | 312.8 | ₹42,21,035.81 |
| 1.06 | Providing and laying Cement concrete (1:2:4) in sleepers with cement , coarse sand , and 20mm nominal size stone grit including cost of all material, labour and T&P etc.complete. | 2,896.62 | M³ | 6,389.62 | ₹1,85,08,301.08 |
| 1.07 | Providing and laying 50 mm thick fine sand (Not less than 1.25 F.M. ) in filter including cost of all material, labour and T&P etc. complete. | 56,950 | M2 | 164.47 | ₹93,66,566.5 |
| 1.08 | Supplying and laying 200 micron L.D.P.E. film including cost of all material, labour and T&P etc. complete. | 53,995 | M2 | 73.37 | ₹39,61,613.15 |
| 1.09 | Painting on Top of sleeper with (Bitumen vg-10) grade @ 1.20 kg /sqm including cost of all material, labour and T&P etc. complete. | 10,635.2 | M2 | 71.8 | ₹7,63,607.36 |
| 1.1 | Providing and laying 60mm thick C.C. , (1:2:4) in Lining with. centering and shuttering, including cost of all material ,labour and T&P etc. complete. | 3,178.56 | M³ | 8,691.92 | ₹2,76,27,789.24 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.02 MB
BOQ_2033116.xls
BOQ • 0.35 MB
03SEIVNIT2025-6.pdf
Tender Documents • 2.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .