Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC 502 D MELLOWADDO ARADI SOCORRO PORVORIM GOA | ₹9.7 L | L1 | Accepted-AOC Lowest bidder |
Tender Value
₹12.1 L
EMD Value
₹24,130
Closing Date
5 May 2026, 3:00 pmClosed
Executive Engineer
WD.II, DDW, PORVORIM GOA
Repairs to pipeline network of various types in (V.P. Colvale, Camurlim, Tivim and Pirna) in Tivim Constituency under SD II, WD II, DDW, Mapusa.
2026_DDW_28976_1
DDW/ WD.II/ ASW/ F.24-E/ 06/ 2026-27/ L-2
Open Tender
Pipe Laying Works
Percentage
365 days
Tivim
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
₹24,130
3 Aug 2026
28 Apr 2026
6 May 2026
28 Apr 2026
5 May 2026
28 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints
etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading,
danger lighting, guarding etc. complete as per the direction of engineer incharge.
A) Repairs to PVC pipeline
I) 63mm | 60 | Nos. | 1 | ₹59.94 |
| 2 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge.
A) Repairs to PVC pipeline
II) 75mm | 40 | Nos. | 3,528.26 | ₹1,41,130.4 |
| 3 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge.
A) Repairs to PVC pipeline
III) 90mm | 35 | Nos. | 3,660.3 | ₹1,28,110.5 |
| 4 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge.
A) Repairs to PVC pipeline
IV) 110mm | 44 | Nos. | 3,920.26 | ₹1,72,491.44 |
| 5 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge.
A) Repairs to 140mm dia. PVC pipeline | 5 | Nos. | 7,247.66 | ₹36,238.3 |
| 6 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge. A) Repairs to 160mm dia. PVC pipeline | 6 | Nos. | 7,596.78 | ₹45,580.68 |
| 7 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge.
B) Repairs to 80mm dia. AC pipeline | 10 | Nos. | 4,134.96 | ₹41,349.6 |
| 8 | Repairs to pipeline network (leakage / breakdown) of various types including cost of materials (pipe, joints etc.), all tools / accessories, labour, transportation, valve operations, traffic management, providing barricading, danger lighting, guarding etc. complete as per the direction of engineer incharge.
B) Repairs to 100mm dia. AC pipeline | 10 | Nos. | 4,574.96 | ₹45,749.6 |
| 9 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 31.43 | Cu.m | 2,211 | ₹69,491.73 |
| 10 | Providing and laying in position cement concrete 1:2:4 (1 cement : 2 coarse sand: 4 graded granitic or basaltic stone aggregate 40 m nominal size) excluding cost of centering shuttering and finishing :;All works upto plinth level | 7.86 | Cu.m | 6,635 | ₹52,151.1 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Tendernotice_2.pdf
PDF • 0.42 MB
Tendernotice_3.pdf
PDF • 0.62 MB
BOQ_29410.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .