Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Finance | -0.60% | ₹5.3 L | L1 | Admitted-Finance |
| 2 | L2₹5.3 L+₹2,655.64 (0.50%)Admitted-Finance | -0.10% | ₹5.3 L+₹2,655.64 (0.50%) | L2 | Admitted-Finance |
| 3 | L3₹5.3 L+₹3,133.66 (0.59%)Admitted-Finance | -0.01% | ₹5.3 L+₹3,133.66 (0.59%) | L3 | Admitted-Finance |
Tender Value
₹6.3 L
EMD Value
₹62,700
Closing Date
10 Jun 2026, 4:00 pmClosed
EO JALALABAD
EO NAGAR PANCHAYAT JALALABAD
Nagar Panchayat ke Antargat Kansiram Colony me suhail khan ki dukan se asagar diwan ke gate tak CC Sadak evm U-Type Nali ka nirman karya
2026_DOLBU_1157237_1
3077/NPJ/INS/NPJ/2026-27
Open Tender
Civil Works
Percentage
60 days
JALALABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹740
Executive Office
₹62,700
Yes
20 Jul 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
10 Jun 2026
5 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1RCC | |||||
| 1.01 | Dismantling cement concrete or brick or granolithic floors including base concrete and including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 metre. S.1 No-697 | 240.62 | SQM | 38 | ₹9,143.56 |
| 1.02 | Disposal of dismantled materials up to 5.00 KM distance complete with labour T&P etc at site. S.1 No-231(a) 100% disposal of excavated materials | 24.06 | Cum | 183.5 | ₹4,415.01 |
| 1.03 | Concrete with 40mm gauge stone ballast, coarse sand of 2.20 F.M and cement, in proportion of 8:4:1 in foundations & under floors, including 3 supply of all materials, labour, T&P etc. required for proper completion of the work. (S.I No-281) | 3.95 | Cum | 4,850 | ₹19,157.5 |
| 1.04 | Concrete with 20mm gauge approved stone ballast, coarse sand and cement, in the proportion of 4:2:1 including supply of all materials, labour, T&P etc. required for proper completion of the work. | 14.66 | Cum | 5,750 | ₹84,295 |
| 1.05 | Providing laying, spreading and compacting stone aggregates of specific sizes (22.4-53mm) to water bound maccadam G-3 specification including spreading in uniform thickness, hand packing rolling with 3 wheeled steel/vibratory roller 8-10 tonnes in stage to proper grade and camber applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density | 37.87 | Cum | 3,175 | ₹1,20,237.25 |
| 1.06 | Providing laying, spreading and compacting stone aggregates of specific sizes (22.4-53mm) to water bound maccadam G-3 specification including spreading in uniform thickness, hand packing rolling with 3 wheeled steel/vibratory roller 8-10 tonnes in stage to proper grade and camber applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density | 37.34 | Cum | 7,300 | ₹2,72,582 |
| 1.07 | LS iron work of small sizes and section such as MS grill stair case raling gate including supply and their fixing required for proper completion of work. SI No 502a | 2.65 | QTL | 6,150 | ₹16,297.5 |
| 1.08 | Supply and fixing of sign board incling all complete. | 1 | No | 5,000 | ₹5,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.86 MB
Tender_1.pdf
Tender Documents • 4.33 MB
BOQ_2168473.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .