Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75,378.23Accepted-Finance | ₹75,378.23 | L1 | Accepted-Finance L1 |
| 2 | L2₹84,540.92Accepted-Finance | ₹84,540.92 | L2 | Accepted-Finance L2 |
| 3 | L3₹91,626.87Accepted-Finance | ₹91,626.87 | L3 | Accepted-Finance L3 |
| 4 | L4₹91,720.79Accepted-Finance | ₹91,720.79 | L4 | Accepted-Finance L4 |
| 5 | L5₹92,326.07Accepted-Finance | ₹92,326.07 | L5 | Accepted-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹3,000
Closing Date
9 Jan 2026, 2:00 pmClosed
Superintending Engineer
SE ECTC SLDC Campus UPPTCL, Lucknow
Construction of ALP Foundation and Cable Trench for Modification Of 33 KV Bhawani Paper Mill Bay and Related Civil Works at 132/33 KV Sub station, Amawa, Raebareli
2025_UPCTL_1102818_1
86/ECTC(L)/2025-26
Open Tender
Civil Works
30 days
SE ECTC SLDC Campus UPPTCL
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Superintending Engineer, E.C.T.C. Lucknow
₹3,000
13 Mar 2026
30 Dec 2025
10 Jan 2026
30 Dec 2025
9 Jan 2026
30 Dec 2025
Construction of ALP Foundation and Cable Trench for Modification Of 33 KV Bhawani Paper Mill Bay and Related Civil Works at 132/33 KV Sub station, Amawa, Raebareli.
Please Enable Macros to View BoQ information
Bill Of Quantity for Construction of ALP Foundation and Cable Trench for Modification Of 33 KV Bhawani Paper Mill Bay and Related Civil Works at 132/33 KV Sub station, Amawa, Raebareli.
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. DSR 2.31
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : CC 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 4.1.2
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 Cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources) DSR 4.1.10
Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete (DSR 5.9.1)
Neat cement punning. DSR 13.18
(GST Extra) Total Rs.=
Conditions-
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.45 MB
Tendernotice_2.pdf
PDF • 0.59 MB
BOQ_2033574.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid