Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.5 LAccepted-AOC 1723 GUPTA AND SONS SECTOR 39 B CHANDIGARH CHANDIGARH CHANDIGARH 160036 UDYAM CH 01 0042756 | CHANDIGARH | CHANDIGARH | 160036 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹15.5 L+₹93,440 (6.42%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹16.7 L+₹2.2 L (14.8%)Rejected-AOC 1542 URBAN ESTATE II HISAR 125 005 HARYANA | HISAR | HARYANA | 125005 | L3 | Rejected-AOC Rejected | |
| 4 | L4₹18.2 L+₹3.6 L (24.8%)Rejected-AOC SCO 1 SECTOR 5 MANSA DEVI COMPLEX PANCHKULA HARYANA | PANCHKULA | HARYANA | 133301 | L4 | Rejected-AOC Rejected |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
23 Jun 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
LT COL VIKRAM SINGH
GE (U) CHANDIMANDIR
GE(U)/CHM-08/2023-24 PERIODICAL SERVICES AT OTM/MD ACCN UNDER AGE B/R OF GE (U) CHANDIMANDIR
2023_MES_598538_1
GE(U)/CHM-08/2023-24
Open Tender
Miscellaneous Works
Works
180 days
GE (U) CHANDIMANDIR
Contractor shall be enlisted with MES in Class E and above and category a(i)
5 documents required · 5 mandatory
₹500
GE (U) CHANDIMANDIR
₹60,000
Yes
4 Aug 2023
26 May 2023
26 Jun 2023
26 May 2023
23 Jun 2023
9 Jun 2023
Amount
Material and labour for Preparation of old plastered or unplastered surfaces of wall by brooming down with steel brushing,scraping down smoke soot's moulds moss and efflorescent salts trading oil greasy sport etc and applying one coat of white wash on wall complete all as specified.
Material and labour for preparation of old plastered ceilling surfaces and applying one coat of white wash complete all as specified and as directed.
Material and labour for Preparation of old painted wooden surfaces of any description not otherwise described over 10cm width or girth and applying one coat of synthetic enamel paint complete all as spcified.
Material and labour for preparation of old painted steel surfacs of any description not otherwise described over 10 cm width or grith and applying one coat of synthetic enamel paint complete all as specified and directed.
Complete removal of exiting treatment and preparation of surfaces of walls by wire brushes and using sand paper and stopping of surfaces & leveling /edging the disturbed places /edges by applying a coat of wall care putty to obtain smooth regular/even finish and applying two coats of oil bound distemper, complete all as specified and directed.
Preparation of old plastered or unplastered surfaces of wall by brooming down with steel brushing, scraping down smoke spot, moulds, moss and efflorescent salts trading oil greasy spot etc, rubbing down and stopping of surface using sand paper and applying one coat of oil bound distemper on wall , complete all as specified and directed.
Material & Labour for complete removal of existing treatment and applying two or more coats of 100% Premium acrylic emulsion paint having Volatile Organic Compounds less than 50 gm/litre and UV resistance as per IS 15489:2004, Alkali & fungal resistant, dirt resistant exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre/ 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre/ 10 sqm of surfaces, complete all as specified and directed. Note: Weather proof exterior emulsion paint and primer shall be of same manufacturer.
Material and labour for Preparation of old plastered or unplastered, old decorated surfaces of wall by brooming down with steel brushing,scraping down smoke soot's moulds moss and efflorescent salts, oil greasy spot etc and applying one coat of cement base paint all as specified and directed.
Taking down cement plaster on brick or stone walls or concrete surfaces etc, any description including raking out joints, hacking for key, scrubbing down with water, etc and removal of rubbish outside MoD land, complete all as specified and directed. Note: Rate quoted by contractor shall be deemed to include to necessary scaffolding etc.
Material and labour for rendering 10 mm thick in cement mortar (1:6), on brick/concrete surfaces of walls, finished even and smooth without using extra cement , complete all as specified and directed.
Material and labour for rendering 15 mm thick in cement mortar (1:4), on brick/concrete surfaces of walls, finished even and fair , complete all as specified and directed.
Material and labour for rendering 5 mm thick in cement mortar (1:3), on ceiling, finished even and smooth without using extra cement , complete all as specified and directed.
Material and labour for preparation of new wall surfaces and applying a coat of wall care putty to obtain smooth regular/even finish and applying two coats of oil bound distemper, complete all as specified and directed.
Material and labour for preparation of new ceiling surfaces and applying a coat of wall care putty to obtain smooth regular/even finish and applying two coats of oil bound distemper, complete all as specified and directed.
Material and labour for preparation of newly plastered surfaces of wall and applying two coats of cement based paint, complete all as specified and directed.
JOGINDER NATH GUPTA AND SONS
m/s krishna engineers1
PARVEEN KUMAR AND SONS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .