| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.5 CrAccepted-AOC | ₹11.5 Cr | L1 | Accepted-AOC Due to Low price |
| 2 | L2₹11.8 Cr+₹37.1 L (3.23%)Rejected-Finance 18 CORPORATION ROAD DEVAKOTTAI | SIVAGANGA | TAMIL NADU | 630001 | ₹11.8 Cr+₹37.1 L (3.23%) | L2 | Rejected-Finance Due to High price |
| 3 | L3₹12.1 Cr+₹61.2 L (5.33%)Rejected-Finance 103 B PARI NAGAR CHINNAANDAN KOVIL ROAD KARUR 639 001 | KARUR | TAMIL NADU | 639001 | ₹12.1 Cr+₹61.2 L (5.33%) | L3 | Rejected-Finance Due to High price |
Tender Value
₹11.5 Cr
EMD Value
₹5.8 L
Closing Date
5 Jan 2026, 3:00 pmClosed
SE(NH)Salem
O/o the Superintending Engineer, National Highways, Omalur main road Narasothipatty, Alagapuram (Po),Salem 636 004
Widening from Intermediate lane to Two lane at km 0/0 - 4/700 and Strengthening at km 0/0 - 4/980 of km 109/6 of Dindigul Bangalore road to Seelakkampatti including Construction of culvert at km 1/10 (i), 1/10(ii), 3/2 (i), 3/2(ii), 3/6, 3/8, 3/10, 4
2025_MoRTH_888510_1
TNNo22HDONH/25-26/Dt.3.12.25(3
Open Tender
Civil Works
Percentage
365 days
Pollachi
Yes, as per Tender Documents
5 documents required · 5 mandatory
₹17,700
15000 online payment through bharatkosh webportal
₹5.8 L
O/o the SE(NH)Salem
21 Apr 2026
4 Dec 2025
6 Jan 2026
4 Dec 2025
5 Jan 2026
4 Dec 2025
15 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all lead sand lifts as per SS20 B icluding cost of all labour charges, materials, tools, equipments and all incidental charges, removal of other deleterious matter and obstructions, trimming of bottom of excavation back filling, clearing up the site and disposal of all surplus materials etc., complete as per standard specification. For Boxing including conveyance of cut earth away from the site with average lead | - | One Cubic Metre | 143.68 | - |
| 2 | Providing,laying,spreading and compacting graded stone aggregates for Granular Sub Base,including premixing the materials with water at OMC in mechnanical mix plant,conveyance of mixed materials by tipper to site,laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material,labour charges,rentals for machinery,fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5- Grading - V | 996.93 | One Cubic Metre | 2,082.92 | ₹20,76,525.44 |
| 3 | Providing,laying,spreading and compacting graded stone aggregates for Granular Sub Base,including premixing the materials with water at OMC in mechnanical mix plant,conveyance of mixed materials by tipper to site,laying in uniform layers using pavers in Sub Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material,labour charges,rentals for machinery,fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 - Grading - III | 781.79 | One Cubic Metre | 2,355.96 | ₹18,41,865.97 |
| 4 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam, including premixing the materials with water at OMC in mechnanical mix plant, conveyance of mixed materials by tipper to site, laying in uniform layers using pavers in SubBase/Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH Rev-5 | 1,954.48 | One Cubic Metre | 2,552.17 | ₹49,88,165.22 |
| 5 | Providing and laying Prime Coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1)per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 502 of MORTH Rev-5 | 7,817.95 | One Square Metre | 86.49 | ₹6,76,174.5 |
| 6 | Providing and laying Tack Coat over WBM/WMM surface( treated with primer) using 2.50 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete asper Clause 503 of MORTH Rev-5 | 7,817.95 | One Square Metre | 19.96 | ₹1,56,046.28 |
| 7 | Removal of the Black Topped (BT) surface to 50 to 70mm depth using Milling machine,including conveying the milled waste materials away from the worksite to an average distance including hire and running charges for the machine, conveyance charges, unloading at unobjectionable place, cleaning the milled surface as to avoid slippery including all other incidental charges etc. complete as per the direction of the departmental officers | 54.1 | One Square Metre | 107.8 | ₹5,831.98 |
| 8 | Providing and laying Tack Coat over Existing BT surface using 2Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 26,180.4 | One Square Metre | 28.81 | ₹7,54,257.32 |
| 9 | Providing, laying Grade 1 consolidated 75mm thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25cum of 13.20-2.36mm and 0.23cum of 2.36mm & below and with 53.20Kgs of VG 30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site,heating the bitumen, aggregate and mixing them in the required temperature in Central Hot Mix Plant20-30 ton capacity, conveying the mix by tipper trucks to work site, spreading the mix to uniform thickness of 50mm using paver to the specified grades and cross sections and compacted by Vibratory /Pneumatic Roller to the required density etc., including labour for attending to paver at site etc.,including hire and fuel charges for 20-30ton CMP with bitumen boiler, tipper trucks, Paver Finisher,Vibratory rollers and all other tools and plant required, including all other incidental charges etc.,complete as per specification using CMP as per clause 505 MORTH Rev-5 | 586.35 | One Cubic Metre | 9,865.2 | ₹57,84,460.02 |
| 10 | Providing and Laying 50mm thick Bituminous Macadam using course aggregate and VG30 bitumen which shall consist of construction in a single course base/binder course confirming to the specification on a previously prepared base, (using Mini Hot Mix Plant and Power Roller) including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 504 MORTH Rev-5 (For Patch Works) | 134.83 | One Cubic Metre | 8,803.31 | ₹11,86,950.29 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
BOQ_933883.xls
BOQ • 0.44 MB
DOCabi.rar
Tender Documents • 2.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .