| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 LAccepted-Finance | L1 | Accepted-Finance Rates of Bidder are below estimated rates and also 1st lowest among two. | |
| 2 | L2₹25.2 L+₹66,288.44 (2.70%)Rejected-Finance | L2 | Rejected-Finance Rates of Bidder are below estimated rates and also higher among two. |
| Sl No | Description | Qty | Unit | SUNSHINE ASSOCIATES L1 | MS ANIL KUMAR CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work in foundation in dry soil including lift up to 1.5m. & lead up to 30m and including back filling, watering & ramming of excavated earth into the plinth with removal & disposal of surplus earth as direction by the engineer-in-charge. | 252.05 | CUM | 110 ₹27,725.83 Lowest | 110 ₹27,725.83 Lowest |
| 2.00 | Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 40 mm down graded stone grit/brick ballast including cost of all material, labour and T&P etc. Complete. | 20.55 | CUM | 5,250 ₹1,07,861.25 | 5,200 ₹1,06,834 Lowest |
| 3.00 | Laying R.C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | 7.56 | CUM | 6,400 ₹48,403.2 Lowest | 6,500 ₹49,159.5 |
| 4.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | 100.98 | CUM | 7,000 ₹7,06,881 | 6,725 ₹6,79,110.68 Lowest |
| 5.00 | Ordinary Centering and shuttering for C.C. work including cost of all labour, material and T&P etc. Complete. | 48.02 | SQM | 360 ₹17,287.92 Lowest | 380 ₹18,248.36 |
| 6.00 | Ordinary Centering and Shuttering of plywood or steel shuttering for R.C.C. work including cost of all labour and T&P etc. complete | 173.12 | SQM | 730 ₹1,26,376.87 Lowest | 750 ₹1,29,839.25 |
| 7.00 | Providing and fixing of expansion joint with angle iron 75x75x10 mm size, with M.S. flat 32x6 mm, filled with filled with bitumen and stone dust including cost of all material, labour T&P all lifts and leads etc. compete as per direction of Engineer-in-charge. | 24 | R.M. | 750 ₹18,000 Lowest | 840 ₹20,160 |
| 8.00 | Supplying and laying tarfelt in two layers under deck slab bearing painted with maxphalt including cost of all material,labour and T. & P. etc. complete | 7.2 | SQM | 200 ₹1,440 | 190 ₹1,368 Lowest |
| 9.00 | Providing 75 mm dia weep holes in abutment & wing walls including supply of all material,labour and T & P required for proper completion of work | 6 | SQM | 815 ₹4,890 | 790 ₹4,740 Lowest |
| 10.00 | S/F 75MM dia P.V.C. pipe for drain spout pipe including cost of all material, labor and T&P etc. required for proper completion of work. | 1 | SQM | 150 ₹150 | 125 ₹125 Lowest |
Tender Value
₹27.7 L
EMD Value
₹55,400
Closing Date
14 Jul 2026, 11:00 amClosed
EXCUTIVE ENGINEER
EXCUTIVE ENGINEER OFFICE MADHY GANGA CANAL CONSTRUCTION DIVISION 9 SAMBHAL
CONSTRUCTION OF D.R.B. CUM CANAL SYPHON AT KM. 2.050 OF FATEHPUR MINOR
2026_UPIDC_1167893_1
02/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
60 days
SAMBHAL
PLEASE REFER THE TENDER DOCUMENT
3 documents required · 3 mandatory
₹674
₹55,400
Yes
SAMBHAL
22 Jul 2026
9 Jul 2026
14 Jul 2026
9 Jul 2026
14 Jul 2026
9 Jul 2026
10 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in dry soil including lift up to 1.5m. & lead up to 30m and including back filling, watering & ramming of excavated earth into the plinth with removal & disposal of surplus earth as direction by the engineer-in-charge. | 252.05 | CUM | - | - |
| 2 | Laying C.C. 1:2:4 Mix (M-15) with Cement, coarse sand & 40 mm down graded stone grit/brick ballast including cost of all material, labour and T&P etc. Complete. | 20.55 | CUM | - | - |
| 3 | Laying R.C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | 7.56 | CUM | - | - |
| 4 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 40 mm down graded stone grit including cost of all material, labour and T&P etc. Complete. | 100.98 | CUM | - | - |
| 5 | Ordinary Centering and shuttering for C.C. work including cost of all labour, material and T&P etc. Complete. | 48.02 | SQM | - | - |
| 6 | Ordinary Centering and Shuttering of plywood or steel shuttering for R.C.C. work including cost of all labour and T&P etc. complete | 173.12 | SQM | - | - |
| 7 | Providing and fixing of expansion joint with angle iron 75x75x10 mm size, with M.S. flat 32x6 mm, filled with filled with bitumen and stone dust including cost of all material, labour T&P all lifts and leads etc. compete as per direction of Engineer-in-charge. | 24 | R.M. | - | - |
| 8 | Supplying and laying tarfelt in two layers under deck slab bearing painted with maxphalt including cost of all material,labour and T. & P. etc. complete | 7.2 | SQM | - | - |
| 9 | Providing 75 mm dia weep holes in abutment & wing walls including supply of all material,labour and T & P required for proper completion of work | 6 | SQM | - | - |
| 10 | S/F 75MM dia P.V.C. pipe for drain spout pipe including cost of all material, labor and T&P etc. required for proper completion of work. | 1 | SQM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.56 MB
Tendernotice_2.pdf
PDF • 3.41 MB
BOQ_2190281.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .