| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | L1 | Accepted-AOC L1 ACCEPTED | |
| 2 | L2₹2.9 L+₹13,829.60 (5.01%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SRI PERIYANDICHIAMMAN CONSTRUCTIONS L2 | ARUNACHALA CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Name of Work : Renewal BT From Vannankattuvalasu to Pudupalayam road Km 0.000-0.200 (PUR-23) H/o Pitchandampalayam | |||||
| 2.00 | Providing and laying TACK COAT over Primed WMM surface at 3 Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 680 | Sqm | 39 ₹26,520 | 34 ₹23,120 Lowest |
| 3.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 23.232Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. | 680 | Sqm | 315 ₹2,14,200 | 303.5 ₹2,06,380 Lowest |
| 4.00 | Provision for Name board | 1 | Nos | 5,000 ₹5,000 | 4,500 ₹4,500 Lowest |
| 5.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package} | 1 | GST Amount | 44,229.6 ₹44,229.6 | 42,120 ₹42,120 Lowest |
Tender Value
₹2.8 L
EMD Value
₹2,800
Closing Date
10 Feb 2026, 3:00 pmClosed
Block Development Officer (BP), Erode Block
Block Development Officer (BP), Panchayat Union Office, Erode Block
Rural Roads Maintenance - 2025-26 - Erode Block - Vannankattuvalasu to Pudupalayam road KM 0/0-0/200
2026_RDTN_650144_1
Ref.No - 2140-2025-A2-2, Dated 02.02.2026
Open Tender
Civil Works - Roads
Item Rate
Block Development Office, Erode Block
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹2,800
Yes
10 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
Providing and laying TACK COAT over Primed WMM surface at 3 Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 23.232Kg of bitumen and 1.168 Kg of Plastic waste for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com.
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_779494.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.74 MB
techbid.pdf
Tender Documents • 1.38 MB
BOQ_779494.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .