| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.9 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹48.9 L+₹2.0 L (4.27%)Rejected-Finance | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹49.0 L+₹2.0 L (4.35%)Rejected-Finance | L3 | Rejected-Finance Not Lowest | |
| 4 | L4₹49.1 L+₹2.2 L (4.60%)Rejected-Finance | L4 | Rejected-Finance Not Lowest | |
| 5 | L5₹49.3 L+₹2.4 L (5.01%)Rejected-Finance | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | M/s B S Jain L4 | chronicle enterprises L6 | DE PRETTY AND CO L3 | Devika Constructions L9 | M/s DS Khekde L5 | M/s Rahul Traders L1 | DEESHA CONSTRUCTIONS L10 | DIVESH HARISH SIRIAH L2 | M/s Rana Construction L7 | Varsha G Nagphase L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete in ground floor & pavings n.exc 15cm thk (below or above ground level) complete all as specified and directed. | 53.5 | Cum | 220 ₹11,770 | 290 ₹15,515 | 325 ₹17,387.5 | 400 ₹21,400 | 300 ₹16,050 | 300 ₹16,050 | 350 ₹18,725 | 100 ₹5,350 Lowest | 250 ₹13,375 | 450 ₹24,075 |
| 2.00 | Dismantling floor hearth or wall tilling including cement mortat bedding (but not backaing coat) removing serviceable tiles to store & rubbish off the premises complete all as specified and directed. | 311.4 | Sqm | 70 ₹21,798 | 78 ₹24,289.2 | 70 ₹21,798 | 90 ₹28,026 | 72 ₹22,420.8 | 55 ₹17,127 | 20 ₹6,228 Lowest | 45 ₹14,013 | 40 ₹12,456 | 68 ₹21,175.2 |
| 3.00 | M&L PCC (1:4:8) type D2 using 40mm graded aggregate in foundation. | 15 | Cum | 3,600 ₹54,000 | 3,700 ₹55,500 | 3,800 ₹57,000 | 3,800 ₹57,000 | 3,980 ₹59,700 | 3,200 ₹48,000 Lowest | 4,500 ₹67,500 | 3,900 ₹58,500 | 4,400 ₹66,000 | 3,500 ₹52,500 |
| 4.00 | M & L for 25mm thick Cement concrete type B-0, 1:2:4 (12.5mm graded aggregate)complete all as specified and directed. | 635 | Sqm | 125 ₹79,375 | 135 ₹85,725 | 120 ₹76,200 | 150 ₹95,250 | 160 ₹1,01,600 | 140 ₹88,900 | 250 ₹1,58,750 | 100 ₹63,500 Lowest | 180 ₹1,14,300 | 170 ₹1,07,950 |
| 5.00 | M&L vitrified ceramic tiles 10 mm thick (square or rectangular) polished, dark shed area of each tile not exceeding 0.36 sqm in floors etc set and jointed in neat cement slurry and pointed in site or colored cement to match over 15mm cement screed bed in cement mortar 1:6 as specified and directed. | 360 | Sqm | 1,298 ₹4,67,280 | 1,465 ₹5,27,400 | 1,440 ₹5,18,400 | 1,300 ₹4,68,000 | 1,480 ₹5,32,800 | 1,350 ₹4,86,000 | 1,200 ₹4,32,000 Lowest | 1,425 ₹5,13,000 | 1,450 ₹5,22,000 | 1,300 ₹4,68,000 |
| 6.00 | M&L vitrified ceramic tiles 10 mm thick (square or rectangular) polished, dark shed area of each tile not exceeding 0.36 sqm in Skirting etc set and including rendering 10mm thick in cement mortar 1:3 complete all as specified and as direted. | 38 | Sqm | 1,350 ₹51,300 Lowest | 1,465 ₹55,670 | 1,450 ₹55,100 | 1,390 ₹52,820 | 1,490 ₹56,620 | 1,380 ₹52,440 | 1,450 ₹55,100 | 1,450 ₹55,100 | 1,480 ₹56,240 | 1,390 ₹52,820 |
| 7.00 | M&L vitrified ceramic tiles 10 mm thick (square or rectangular) polished, dark shed area of each tile exc 0.42 but not exceeding 1.0 sqm in floors etc set and jointed in neat cement slurry and pointed in site or colored cement to match over 15mm cement screed bed in cement mortar 1:6 as specified and directed. | 65 | Sqm | 1,680 ₹1,09,200 | 2,000 ₹1,30,000 | 1,980 ₹1,28,700 | 1,700 ₹1,10,500 | 1,990 ₹1,29,350 | 1,700 ₹1,10,500 | 1,200 ₹78,000 Lowest | 1,850 ₹1,20,250 | 1,900 ₹1,23,500 | 1,700 ₹1,10,500 |
| 8.00 | M&L vitrified ceramic tiles 10 mm thick (square or rectangular) polished, dark shed area of each tile not exceeding 1.0 sqm in Skirting etc set and including rendering 10mm thick in cement mortar 1:3 complete all as specified and as direted. | 6.5 | Sqm | 1,690 ₹10,985 | 2,100 ₹13,650 | 2,100 ₹13,650 | 1,750 ₹11,375 | 2,010 ₹13,065 | 1,700 ₹11,050 | 1,450 ₹9,425 Lowest | 1,880 ₹12,220 | 2,000 ₹13,000 | 1,800 ₹11,700 |
| 9.00 | M&L joint free colored non skid ceramic tiles 6 to 7 mm thick (square or rectangular) area of each tile exceeding 0.11 sqm but not exc 0.18 Sqm in floors etc set and jointed in neat cement slurry and pointed in site or colored cement to match over 15mm cement screed bed in cement mortar 1:4 as specified and directed. | 30 | Sqm | 1,280 ₹38,400 | 1,240 ₹37,200 | 1,350 ₹40,500 | 1,300 ₹39,000 | 1,295 ₹38,850 | 1,220 ₹36,600 | 1,200 ₹36,000 Lowest | 1,390 ₹41,700 | 1,400 ₹42,000 | 1,350 ₹40,500 |
| 10.00 | M&L colored glazed ceramic tiles in vertical surface 300x 450x 6-7mm thick set and jointed in neat cement slurry and pointed in site or color cement to match including rendering 10mm thick in cement mortar 1:3 complete all as specified and as direted. | 142.5 | Sqm | 1,210 ₹1,72,425 | 1,325 ₹1,88,812.5 | 1,300 ₹1,85,250 | 1,350 ₹1,92,375 | 1,310 ₹1,86,675 | 1,290 ₹1,83,825 | 1,200 ₹1,71,000 Lowest | 1,365 ₹1,94,512.5 | 1,350 ₹1,92,375 | 1,300 ₹1,85,250 |
Tender Value
₹49 L
EMD Value
₹98,000
Closing Date
8 Nov 2025, 6:00 pmClosed
Garrison Engineer
Military Engineer Services, Garrison Engineer, Cantt Area, Kamptee 441001
REPAIR TO TILING, SANITARY FITTINGS, ROOF SHEET, FALSE CEILING AND OTHER MISC B/R WORKS AT CERTAIN UNITS OF FORT AREA NAGPUR IN THE AREA OF AGE B/R-III UNDER GE KAMPTEE.
2025_MES_735756_1
8830/E8
Open Tender
Civil Works
Item Rate
180 days
Nagpur
All as per NIT
8 documents required · 8 mandatory
₹500
GE Kamptee
₹98,000
Yes
29 Nov 2025
17 Oct 2025
10 Nov 2025
17 Oct 2025
8 Nov 2025
31 Oct 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_823887.xls
BOQ • 0.43 MB
Tenderdocument8830.pdf
Tender Documents • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .