Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.4 LAccepted-Finance AT ATHATIRA P O ALASAHI VIA ASTARANGA DIST PURI | L1 | Accepted-Finance ok | |
| 2 | L2₹6.4 LSame as L1Accepted-Finance AT BARIMAL PO HATIBARI PS SUKINDA DIST JAJPUR PIN 755018 | JAJAPUR | ODISHA | 755018 | L2 | Accepted-Finance ok | |
| 3 | Rejected-Technical AT WARD NO 21 P O JAGATSINGPUR DIST JAGATSINGPUR | JAGATSINGPUR | JAGATSINGPUR | ODISHA | - | Rejected-Technical As per Proceeding | |
| 4 | Rejected-Technical | - | Rejected-Technical As per Proceeding | |
| 5 | Rejected-Technical PUNANGA PO DIST JAGATSINGHPUR | JAGATSINGHAPUR | ODISHA | 754102 | - | Rejected-Technical As per Proceeding |
Tender Value
₹6.4 L
EMD Value
₹6,400
Closing Date
6 Jul 2026, 5:00 pmClosed
EXECUTIVE OFFICER JAGATSINGHPUR MUNICIPALITY
OFFICE OF THE JAGATSINGHPUR MUNICIPALITY
Construction of Culvert near Kantaballavpur Canal in Ward no.01
2026_ORULB_132780_1
JSPURM-EO-Tender-05/2026-27
Open Tender
Civil Works - Others
Percentage
120 days
Construction of Culvert near Kantaballavpur Canal
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
₹6,400
Yes
22 Oct 2026
25 Jun 2026
7 Jul 2026
25 Jun 2026
6 Jul 2026
25 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | Earth work in ordinary soil including rough dressing and levelling the bed. | 19.84 | cum | 206.06 | ₹4,088.23 |
| 4 | Sand filling in Foundation &Plinth including cost conveyance, royalty & taxes and all labour T & P etc. complete as per the direction of EIC. | 4.41 | cum | 575.43 | ₹2,537.65 |
| 5 | C.C.( 1:3:6) using 4Cm size C.B.H.G. metal including cost, carriage,royalty hire chargesof mixture machine & taxes etc. complete(No hand mixing hire chargesof mixture machine & taxes etc. complete(No hand mixing allowed) as per the direction of the Engineer-in-charge. | 4.41 | cum | 6,553.59 | ₹28,901.33 |
| 6 | R.C.C.M 20 using 12 mm size H.G. chips including centering,shuttering,cost, carriage, royalty & taxes etc. complete as per the direction of EIC. | 34.92 | sqm | 6,944.8 | ₹2,42,512.42 |
| 7 | Supplying,cutting, bending, binding and tying the grills in position including cost of tying wire and M.S. Rod etc. complete. | 34.92 | sqm | 8,887.98 | ₹3,10,368.26 |
| 8 | Rigid smooth centring & shuttering on walls using rigid steel frame shutters and dismantalling them after casting(no use of tin/ply shutters) etc. complete. (Foundation & Plinth) | 142.54 | sqm | 248.88 | ₹35,475.36 |
| 9 | 6mm thick C:P (1:4) to RCC surface finished smooth including closed deep chipping and slurry. | 14.85 | sqm | 213.09 | ₹3,164.39 |
| 10 | Finishing wall with water proofing cement paint two coats with cost of cement paints. | 10.53 | sqm | 44.93 | ₹473.11 |
| 11 | Add for Tranparancy & Taking Photograph ……..… | 1 | Ls | 8,000 | ₹8,000 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
finance_597651.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.47 MB
BOQ_597651.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .