Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Infra Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 117 ANSAL SATYAM RDC RAJ NAGAR GHAZIABAD RDC GHAZIABAD UTTAR PRADESH 201002 | GHAZIABAD | UTTAR PRADESH | 201002 | Admitted-Finance |
| 2 | Rejected-Technical HOUSE NO 152 RDC RAJNAGAR GHAZIABAD GHAZIABAD UTTAR PRADESH 201001 | GHAZIABAD | UTTAR PRADESH | 201001 | Rejected-Technical CRB FEE NOT FOUND |
Tender Value
₹28.3 L
EMD Value
₹56,583
Closing Date
8 Feb 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE HCD-7 DDA OFFICE
EE HCD-7 DDA OFFICE
Operation and maintenance of 10 KLD WWTP for the period of 3 years at park at Sector -23, Dwarka i/c installation necessary equipment with all fitting and fixtures (Specialized work).
2024_DDA_791393_1
35/EE/HCD-7/DDA/2023-24(Re)
Open Tender
Civil Works
Works
1125 days
DWARKA ZONE
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹56,583
26 Feb 2024
19 Jan 2024
9 Feb 2024
19 Jan 2024
8 Feb 2024
19 Jan 2024
Amount
COMPREHENSIVE OPERATION & MAINTENANCE of WWTP and all other allied works etc. created under the contract for a period of 5 years after commissioning of WWTP including all cost of labour, consumables, chemicals, repair/replacement of E&M parts, testing of outlet parameters etc. as required. Year wise amount to be quoted in this BOQ). Payment to be shall be released on quarterly on pro rata bases. No payment shall be made on account of any escalation of prices. Adequate operators to be provided for proper plant operation. Treated water quality target should be monitored by random sampling. The scope of item includes monthly comprehensive maintenance for the WWTP (i/c tertiary treatment) including all spares supply and consumables. Electricity supply for the plant will be provided by DDA. The contractor to submit Bank Guarantee (BG) for an amount equivalent to yearly O&M amount before release of 1st RA Bill for O&M. The security deposit @ 2.5% deducted shall be released after completion of maintenance period of 5 year to the entire satisfaction of Engineer-in-Charge. Noncompliance of O&M requirements shall make the agency liable for recovery from the security deposit and/or BG with DDA. a) 1st Year
2nd Year
3rd Year
Providing and fixing of filter feed pump, sludge pump, air blower with motor, MGF & ACF , Sludge Recirculation pumps, Activated carbon Filter with media, multiport valve, filter material, Dosing tank,Dosing Pump, and CPVC pipe, Pipe fittings & miscellaneous items required for operation corresponding to 10 KLD WWTP complete as per the direction and satisfaction of Engineer-in-Charge.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .