Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 LAccepted-AOC 2 138 MUTHALIYAR STREET VADAKKUPATTU AMODR TIRUVALLUR | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 601204 | ₹16.6 L | L1 | Accepted-AOC Low rate quoted |
| 2 | L2₹16.7 LRejected-Finance NO 126 SRI BRINDAVAN 1ST MAIN ROAD KODAMBAKKAM CHENNAI 600024 | CHENNAI | CHENNAI | TAMIL NADU | 600024 | ₹16.7 L | L2 | Rejected-Finance High rate quoted |
| Sl No | Description | Qty | Unit | V ANANDHAN L1 | M/s.DRR INFRASTRUCTURES L2 |
|---|---|---|---|---|---|
| 1.00Construction of Anganwadi Building @ Ambedthkar nagar in Nallur Panchayat | |||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. As per SS 20 B | 32.28 | m3 | 263.5 ₹8,505.78 | 265 ₹8,554.20 |
| 3.00 | Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification. | 8.29 | m3 | 2,149 ₹17,815.21 | 2,150 ₹17,823.50 |
| 4.00 | Cement concrete 1:4:8(one cement,Four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than | 8.03 | m3 | 5,901.5 ₹47,389.05 | 5,910 ₹47,457.30 |
| 5.00 | Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete basement | 5.76 | m3 | 6,219.5 ₹35,824.32 | 6,220 ₹35,827.20 |
| 6.00 | Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement | 28.14 | m3 | 6,312.5 ₹1.8 L | 6,320 ₹1.8 L |
| 7.00 | Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and p | 9.4 | m3 | 9,623 ₹90,456.20 | 9,630 ₹90,522 |
| 8.00 | Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and p | 12.28 | m3 | 9,764 ₹1.2 L | 9,770 ₹1.2 L |
| 9.00 | Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations | 37.68 | m2 | 547.5 ₹20,629.80 | 550 ₹20,724 |
| 10.00 | Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations | 120.43 | m2 | 1,095 ₹1.3 L | 1,100 ₹1.3 L |
Tender Value
₹17.3 L
EMD Value
₹43,125
Closing Date
22 Jan 2026, 3:00 pmClosed
Block Development Officer
Block Development Office Sholavaram
Construction of Anganwadi Building at Ambethkar nagar in Nallur Panchayat
2026_RDTN_645346_1
ITPHS 5308/2024/A3
Open Tender
Civil Works
120 days
SHOLAVARAM
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹43,125
Yes
10 Mar 2026
21 Jan 2026
22 Jan 2026
21 Jan 2026
22 Jan 2026
21 Jan 2026
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation. As per SS 20 B
Supplying and filling in foundation and basement with filling sand in layers of not more 15cm thick well rammed watered and compacted etc., complete complying to standard specification.
Cement concrete 1:4:8(one cement,Four sand, and Eight hard broken stone) Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers not more than
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete basement
Brick work in cement Mortor 1:5 (One cement and live sand) using II class Bricks for the following including mixing mortar and all other labour charges etc complete Above basement
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and p
Cement Concrete 1:1.5:3 (one cement one and half sand and three machine broken stone) using 20 mm ISS gauge machine broken HBG metal for RCC works excluding cost and (abrication otreinforcement and centerning shuttering charges but including curing and p
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations
Supplying and erecting shuttering including necessary support for plance surface in Foundation Basement and Roof sllabs struting upto 3.29 M height for plane surfaces for floors for RCC column footings columns plinth beam and connecterd with foundations
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rod
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Finishing the top of roof with one course of Machine pressed tiles of size 23x23x2cm in 1:3 12mm thick using WCC
Plastering with CM 1:5, 12mm thick.in all floors including curing etc., complete complying with standard specifications and as directed by the departmental officers.
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Granolithic floor finish in cement mortar 1:2:4 using 20 mm thick and pointing with same colour including cost and conveyance of all materials to site and all labour charges etc completed,..
Paving the Floor with shahabad stone size 600x600x20mm laid in CM 1;3,10mm thick and pointing with white cement 0.40kg per sqm mixed with colouring pigment to suit the colour of the tiles including cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification.
Paving the Floor with Antiskid tiles of size 305x305x6mm laid in CM 1;2,10mm thick and pointing with white cement 0.40kg per sqm mixed with colouring pigment to suit the colour of the tiles including cost and conveyance of all materials to site and all labour charges etc., complete as per standard specification.
Door 0.75x1.50m
Door(D 1 )1.00 x 2.40 m
Door (D 2 ) 1.10 x 2.40 m
Window 1.20 x 1.20 m
Window 1.20 x 1.20 m
Ventilator 0.60X 0.45 m
Ventilator 0.90X 0.45 m
Light point SD 25
Fan point SD 25
Fan SOR SD 107
Plug point SD 38
CFL lamp-BH fitting SD 80
DPIC swtich of 500 V SD 154
G I Pipe (40mm)
Service Wire SD 64
Exhaust fan SD 114
Bulk head fitting SD 83
Distembering two coat using oil paint including cost and conveyance of all materials to site and all labour charges etc completed
Emulsion TWO coat with using best quality and approved variety of colour pigments including cost of all materilas, brushes and scaffolding charges etc., complete complying with standar
Supplying and painting two coats new iron work such as steel doors ventilators, window bars etc.,
Provision for European water closet including labour charges
Provision for 500 liters watertank
Supplying and fixing in position best quality and approved make Indian made white earthernware wash hand basin of size 550 x 400mm without pedestal with a pair of cast iron brackets, including cost 15mm dia brass CP pillar tap, 32mm dia "B" class GI waste pipe with rubber plug and chain, 15mm dia GM wheel valve, 15mm brass nipple, 15mm dia nylone connection, 32mm dia CP brass waste coupling including fixing of wash basin using CI brackets on to the wall in position with TW plugs and screws, rubber washers, white lead and giving necessary water supply connection and painting the brackets with two coat of painting over a priming coat of anti-corrosive paint including testing for leakages etc., complete complying with standard specification and as directed by the departmental officers. (The wash hand basin and specials should be got approved by the Executive Engineer before use on works).
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
tenderdocument.pdf
Tender Documents • 0.93 MB
BOQ_773390.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid