| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC NULL | ₹1.3 Cr | L1 | Accepted-AOC Below Estimate |
| 2 | L2₹1.4 Cr+₹6.8 L (5.10%)Rejected-AOC NULL | ₹1.4 Cr+₹6.8 L (5.10%) | L2 | Rejected-AOC Above Estimate |
| 3 | Rejected-Technical | - | - | Rejected-Technical Ineligible |
Tender Value
₹1.6 Cr
EMD Value
₹1.6 L
Closing Date
10 Jun 2025, 3:00 pmClosed
Executive Officer
Sholur Town Panchayat Sholur Post, The Nilgiris
Improvements of B.T. Road at Dhoobakandi to Manickal Road, Kokkal Bus Stand to Dhoobakandi, Government School to Selakkal Road, Kannerimukku to Bridge Road in Sholur Town Panchayat
2025_DTP_564790_1
187/2025
Open Tender
Civil Works
Works
180 days
Sholur First Grade Town Panchayat
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1.6 L
Yes
5 Jul 2025
4 Jun 2025
10 Jun 2025
4 Jun 2025
10 Jun 2025
4 Jun 2025
4 Jun 2025 - 10 Jun 2025
Amount
Picking the existing surface 3 to 5 cm deep removal of picked up staff to the side berms and using the useful metal to the road hand packing to camber sectioning levelling etc.,complete as per including labour charges for picking and other tools and plants etc., complete as per standard specifications. 404 of MORTH
Earthwork excavation for foundation and depositing on Bank within initial lead of 10mt and initial lift of 2mt in hard stiff clay ,stiff black cotton hard red earth shales murrams gravel stoney earth and earth mixed with small size boulders and hard gravelly soil except rock etc., complete complying with standard specification.As per SS 20 B TNDSS NO 23&24 VI (S2 ),VII 9,10
Earth work excavation for Open Cutting and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B
Plain Cement Concrete 1:4:8 Mix (one part cement, Four part sand and Eight part of aggrigate) using 40mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying and curing etc. complete. Complying with std. specifications.
Supplying and erecting of centering to sides and soffits including supports and strutting for drainages sides and culverts body wall sides using 90 cm x 60 cm and B.G.10 stiffenend with welded mild steel angles of size 25 mm x 25 mm x 3 mm for boarding laid over (silver oak joists) of size 10 cm x 6.50 cm spread at about 90 cm etc.,complete complying with standard specification.TNDSS NO ;30 & 86
Below
Above
Plain Cement Concrete 1:2:4 Mix (one part cement, One part sand and Two part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with std. specification
Providing and laying ,spreading and compacting graded stone aggregate to wet mix macadam (WMM ) specification including premixing the material with water at OMC in mechanical mix plant carriage to mixed material by tipper to site laying in uniform layers with paver in sub base / base course on well prepared surface and compacting with vibratory roller to achive the desired density complete as per clasue 406 of MORTH specifications.
Providing and laying Prime coat of 7 kgs/10 sqm over the WMM surface treated with primer using 7 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as Prime coat manually etc., complete as per 502 of MORTH Rev V Specifications
Providing and laying tack coat of 2.5 kgs/10 sqm over the Prime surface treated with binder using 2.5 kgs of bituminous Emulsion for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH Rev V Specifications
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.24cum of 26.50-13.20mm, 0.25 cum of 13.20-2.36mm and 0.23 cum of 2.36mm & below and with 53.20Kgs of VG30/VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min. required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to worksite, spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver at site etc., including hire charges and fuel charges for 20- 30t CMP with bitumen boiler, tipper trucks, Paver Finisher /9m paver finisher, Vibratory / Pneumatic rollers and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 505 MORTH Rev-5
Providing and laying Bituminous Concrete to 30mm thick using 0.13 cum of 19.00 - 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26cum of 2.36 and below with 50.30kgs of VG30 / VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5.
Road marking with Hot Applied Thermo Plastic Compound with Reflectorising Glass Beads on Bituminious Surface Proving and Laying of Hot Applied thermoplastic Compound 2.5 mm thick inculding reflectorising glass beads @ 250gms per sqm area thickness of 2.5mm exclusive of surface applied glass beads As Per IRC: 35 The finished surface to be level uniform and free from streaks and holes Inculding all Charges etc.., complete
Provision for Name Board
P RAYIN (BID ID -1360167)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .