| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.6 LAccepted-AOC | ₹17.6 L | L1 | Accepted-AOC L1 is Less Estimate Roate Quated by Approved |
| 2 | L2₹18.9 LRejected-AOC CHENNAI | CHENNAI | TAMIL NADU | 600001 | ₹18.9 L | L2 | Rejected-AOC L2 is Above Estimate Roate Quated by Rejected |
| Sl No | Description | Qty | Unit | Gopi S L2 | V.R. CONSTRUCTIONS AND DEVELOPERS L1 |
|---|---|---|---|---|---|
| 1.01Providing Renewal BT to Bootheri - Nerkunam Road km 0/0 - 1/210 IN VALLAM BLOCK | |||||
| 1.02 | Clearing the scrub jungles including all labour charges for all labour charges etc complete. | 1,190 | Sqm | 10 ₹11,900 | 5.5 ₹6,545 |
| 1.03 | Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br | 595 | Cum | 200 ₹1.2 L | 140.35 ₹83,508.25 |
| 1.04 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of 50mm using 45mm IRC size HBG metal | 27.69 | Sqm | 6,000 ₹1.7 L | 4,418.28 ₹1.2 L |
| 1.05 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 3,720 | Sqm | 40 ₹1.5 L | 33.4 ₹1.2 L |
| 1.06 | BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as
per specification using CMP as per clause 507 of MORTH Rev-5 | 93 | Cum | 12,178.59 ₹11.3 L | 12,178.59 ₹11.3 L |
| 1.07 | Provision for LWF 1% | 1 | Nos | 14,703 ₹14,703 | 14,703 ₹14,703 |
| 1.08 | Towards the cost of Name Board charges | 1 | Nos | 5,400 ₹5,400 | 5,400 ₹5,400 |
| 1.09 | Towards the cost of photographic charges | 1 | Nos | 1,000 ₹1,000 | 1,000 ₹1,000 |
| 1.10 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 2,87,919 ₹2.9 L | 2,68,264 ₹2.7 L |
Tender Value
₹17.6 L
EMD Value
₹17,600
Closing Date
27 Nov 2025, 3:00 pmClosed
Block Develoment Officer (B.P)
Panchayat Uniopn Vallam
TN/VPM/Vallam/SFC R-Rural Road WORK/2025-26 P2
2025_RDTN_625539_1
TN/VPM/Vallam/SFC R-Rural Road WORK/2025-26 P2
Open Tender
Civil Works
Vallam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹17,600
Yes
15 Dec 2025
21 Nov 2025
27 Nov 2025
21 Nov 2025
27 Nov 2025
21 Nov 2025
Amount
Providing Renewal BT to Bootheri - Nerkunam Road km 0/0 - 1/210 IN VALLAM BLOCK
Clearing the scrub jungles including all labour charges for all labour charges etc complete.
Earthwork excavation in all classes of soils except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20A including cost of all labour materials, tools, equipments and all incidental charges and sheeting, shoring and br
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of 50mm using 45mm IRC size HBG metal
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BITUMINOUS CONCRETE 25/30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Provision for LWF 1%
Towards the cost of Name Board charges
Towards the cost of photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Gopi S (BID ID -1520619)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_748024.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_748024.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid